Loading...
HomeMy WebLinkAboutEASTGATE SECOND - Filed CS-COMMENT SHEETS - 2005-08-03PROJECT /-Cqm COMMENT SHEET City of Fort Collins Current Planning DATE: March 3, 2004 TO: Technical Services PROJECT: 910-04 EASTGATE PDP —TYPE I (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: March 17, 2004 Note - PLEASE identify four redlines for facture reference Name (please print) CHECK HERE IF,YOU WISH TO RECEIVE COPIES OF REVISIONS �at ; Site _Drainage Report _Other Utility Redline Utility _Landscape 6a City of Fart Collins Project Comments Sheet Lws '.1 Selected Departments ( itt of Mort Collins Department: Engineering Date: March 19, 2004 Project: EASTGATE PDP - TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: March 24, 2004 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 7 Created: 3/16/2004 [3/161041 This project name is already taken. Please re -name with an original name or use Eastgate, 2nd Filing. This applies to all plans. Number: 12 Created: 3/16/2004 [3/16/041 Please see redlines and redlined utility plan checklist for any additional comments. Number: 13 Created: 3/16/2004 [3/16/04] Please ensure that the site, landscape, utility plans and plat all match. i.e. Certain easements are not shown or are labeled incorrectly on the site plan and utility plans, and sidewalks shown on the site plan are not shown on the utility plans. Number: 14 Created: 3/16/2004 [3116/04] Is the easement shown for the sewer line offsite an existing easement? If not, a letter of intent from the adjacent property owner will be required prior to hearing, stating that they intend to grant an easement for this line after the hearing. And prior to rrrylars being signed by the City, this easement will have to be complete. Number: 22 Created: 3/16/2004 [3116/04] Is the open space intended to be a public park? If so, should it not be in a public access easement? Number: ro-1 3 Z-].�JCreated: 3/16/2004 [3/16/041 Th ed is 32 years gold. Please submit an updated soils report. Topic: Grading Number: 19 Created: 3/16/2004 (3/16/04] It appears that offsite grading is shown to the north of this site. Please obtain offsite easements for this grading. See comment 14 for more information. 3 /7vq Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _,/ Site Drainage Report ✓ Other Soi h �F ✓ Utility _ ✓ Redline Utility v�Landseape Page I Topic: Landscape Plan Number: 10 Created: 3/16/2004 [3/16/04] Please enlarge the site portion of the drawing so that it is legible and understandable, and be sure to show the utilities on the landscape plan so that landscape separation requirements are being met. Topic: Plat Number: 8 Created: 3/16/2004 [3/16/04] Please see reclined plat for changes needed to the plat language. Also, please see attached plat language. Number: 9 Created: 3/16/2004 [3/16/04] Wouldn't separately dedicating additional area for a utility easement be redundant, since all area outside of the building envelope is already dedicated as a utility and drainage easement? Topic: Site Plan Number: 11 Created: 3/16/2004 (3/16/041 Please call out the ROW location, and the widths of all sidewalks and driveways on the site plan. Topic: Utility Plans Number: 15 Created: 3/16/2004 [3/161041 Please add the standard street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 17 Created: 3/16/2004 [3/16/04] The overall utility plan needs to clearly show and provide dimensions for the ROW on Montgomery. The dimensions of the sidewalks, parkway, and driveways also need to be provided. Number: 18 Created: 3/16/2004 [3/16/041 Please label driveways as concrete to the ROW. Number: 20 Created: 3/16/2004 (3116/04] The indemnification statement is only required on the cover sheet. The font shown for the statement does not meet LCUASS scanability requirements. Please adjust the font and/or font size so that the it is scanable. Number: 21 Created: 3/16/2004 [3116/041 Please provide the standard driveway detail. Page 2 Project Comments Sheet se4eete ep-lirt e is t)CI) a't 173 ei. 1: iZ n gill t2c ri 11 ....'.SSL`�'J4S'A[L'.:�,T^:�`:G9C'.ESSY:4,R£n'.15YR': ". .,. 4 .L41.'T... .. �` ..'k'.r'TR....l •': .. i!�C:.:e:_ �. '.:��'4'Y�.-. i... .-.:::: i ':'.:S'.1 Data: .Nlit1 l;, 2004 Project: EASTGATE PDP - TYPE i (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: May 12, 2004 Note - Please identify your redlines for future reference Issue Contact: Katie Moore Topic: General Number: 14 Created: 3/16/2004 14/30/04] The letter of intent from the property owner to the south was received. Thank you. Please submit a copy of the completed easement to the City when it is completed. This is required prior to mylars. Original comment: [3/16/04] Is the easement shown for the sewer line offsite an existing easement? If not, a letter of intent from the adjacent property owner will be required prior to hearing, stating that they intend to grant an easement for this line after the hearing. And prior to mylars being signed by the City, this easement will have to be complete. Topic: Plat Number: 8 Created: 3/16/2004 [4/30/04] There are still several typos that need to be corrected in the plat language. Original comment: [3/16/04] Please see reclined plat for changes needed to the plat language. Also, please see attached plat language. '1f S¢t: V2cz-'V�t I Pr CA —� coy'V-Z� Signature .Iz:b Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility __ Redline Utility Landscape Page 1 Project Comments Sheet ME Selected Departments Col liI'.ns Department: Engineering Date: November 9, 2004 Project: EASTGATE PDP (RESUBMITTAL) - TYPE All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: November 10, 2004 Note - Please identify your redlines for future reference Issue Contact: Katie Moore n Topic: General [ r Number:6 Created: 11/9/2004 ��� �• ` [1119/04] Please review LCUASS appendix E for scanability requirements for all plans and revise plans as necessary. Number: 7 Created: 11/9/2004 [11/9/04] The site plan shows a much larger area than is needed, making the actual site very small and more difficult to decipher. Please enlarge the actual site for the site plan. Number: 8 Created: 11/9/2004 [11/9/04] There appear to be no street trees provided for the north half of the property's frontage on Montgomery. Number: 9 Created: 11/9/2004 [11/9/04] Please provide dimensions for parking stalls and sidewalks. Number: 10 Created: 11/9/2004 (11/9/04] Please coordinate the landscape, site and utility plans so that they all match. Number: 11 Created: 11/9/2004 [11/9/04] The underwalk drain proposed to connect to Riverside should be constructed according to D-10 from the stormwater manual. Please add this detail to the plans and revise the plans to match it. Number: 12 Created: 11/9/2004 [11/9/04) Regarding the drainage swale flowing north to Riverside: It appears that the propqsed ultimate condition of the swale will impact Lot 3. Please either obtain easements 4innatare Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS __ Plat _V Site Drainage Report Other_ XL Utility _ ✓ Redline Utility Landscape Page 1 for this condition and put up money for the construction of it, or have the owner of Lot 3 sign the utility plans and DA, or revise the plans to not obligate the owner of Lot 3 to any improvements that this project will not be making. Number: 13 Created: 11/9/2004 [11 /9/04] Under the previous project, a letter of intent was received from the owner of Lot 4 for the proposed drainage to cross that lot. It appears that this new submittal exceeds that original intent, and that reapproval is needed from the owner of lot 4, and approval is needed from the owner of Lot 3. Number: 14 Created: 11/9/2004 [11/9/04] See redlines for any additional comments. Page 2