COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 3, 2004 TO: Technical Services
PROJECT: 910-04 EASTGATE PDP —TYPE I (LUC)
All comments must be received by Bob Barkeen no later than the staff
review meeting:
March 17, 2004
Note - PLEASE identify four redlines for facture reference
Name (please print)
CHECK HERE IF,YOU WISH TO RECEIVE COPIES OF REVISIONS
�at ; Site _Drainage Report _Other
Utility Redline Utility _Landscape
6a
City of Fart Collins
Project Comments Sheet
Lws '.1 Selected Departments
( itt of Mort Collins
Department: Engineering
Date: March 19, 2004
Project: EASTGATE PDP - TYPE I (LUC)
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
March 24, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 7 Created: 3/16/2004
[3/161041 This project name is already taken. Please re -name with an original name or use Eastgate, 2nd Filing. This
applies to all plans.
Number: 12 Created: 3/16/2004
[3/16/041 Please see redlines and redlined utility plan checklist for any additional comments.
Number: 13 Created: 3/16/2004
[3/16/04] Please ensure that the site, landscape, utility plans and plat all match. i.e. Certain easements are not shown
or are labeled incorrectly on the site plan and utility plans, and sidewalks shown on the site plan are not shown on the
utility plans.
Number: 14 Created: 3/16/2004
[3116/04] Is the easement shown for the sewer line offsite an existing easement? If not, a letter of intent from the
adjacent property owner will be required prior to hearing, stating that they intend to grant an easement for this line after
the hearing. And prior to rrrylars being signed by the City, this easement will have to be complete.
Number: 22 Created: 3/16/2004
[3116/04] Is the open space intended to be a public park? If so, should it not be in a public access easement?
Number: ro-1 3 Z-].�JCreated: 3/16/2004
[3/16/041 Th ed is 32 years gold. Please submit an updated soils report.
Topic: Grading
Number: 19 Created: 3/16/2004
(3/16/04] It appears that offsite grading is shown to the north of this site. Please obtain offsite easements for this
grading. See comment 14 for more information.
3 /7vq
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _,/ Site Drainage Report ✓ Other Soi h �F
✓ Utility _ ✓ Redline Utility v�Landseape
Page I
Topic: Landscape Plan
Number: 10 Created: 3/16/2004
[3/16/04] Please enlarge the site portion of the drawing so that it is legible and understandable, and be sure to show
the utilities on the landscape plan so that landscape separation requirements are being met.
Topic: Plat
Number: 8 Created: 3/16/2004
[3/16/04] Please see reclined plat for changes needed to the plat language. Also, please see attached plat language.
Number: 9 Created: 3/16/2004
[3/16/04] Wouldn't separately dedicating additional area for a utility easement be redundant, since all area outside of
the building envelope is already dedicated as a utility and drainage easement?
Topic: Site Plan
Number: 11 Created: 3/16/2004
(3/16/041 Please call out the ROW location, and the widths of all sidewalks and driveways on the site plan.
Topic: Utility Plans
Number: 15 Created: 3/16/2004
[3/161041 Please add the standard street cut note: Limits of street cut are approximate. Final limits are to be
determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair
standards.
Number: 17 Created: 3/16/2004
[3/16/04] The overall utility plan needs to clearly show and provide dimensions for the ROW on Montgomery. The
dimensions of the sidewalks, parkway, and driveways also need to be provided.
Number: 18 Created: 3/16/2004
[3/16/041 Please label driveways as concrete to the ROW.
Number: 20 Created: 3/16/2004
(3116/04] The indemnification statement is only required on the cover sheet. The font shown for the statement does not
meet LCUASS scanability requirements. Please adjust the font and/or font size so that the it is scanable.
Number: 21 Created: 3/16/2004
[3116/041 Please provide the standard driveway detail.
Page 2
Project Comments Sheet
se4eete ep-lirt e is
t)CI) a't 173 ei. 1: iZ n gill t2c ri 11
....'.SSL`�'J4S'A[L'.:�,T^:�`:G9C'.ESSY:4,R£n'.15YR': ". .,. 4 .L41.'T... .. �` ..'k'.r'TR....l •': .. i!�C:.:e:_ �. '.:��'4'Y�.-. i... .-.:::: i ':'.:S'.1
Data: .Nlit1 l;, 2004
Project: EASTGATE PDP - TYPE i (LUC)
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
May 12, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 14 Created: 3/16/2004
14/30/04] The letter of intent from the property owner to the south was received. Thank you. Please submit a copy of
the completed easement to the City when it is completed. This is required prior to mylars.
Original comment:
[3/16/04] Is the easement shown for the sewer line offsite an existing easement? If not, a letter of intent from the
adjacent property owner will be required prior to hearing, stating that they intend to grant an easement for this line after
the hearing. And prior to mylars being signed by the City, this easement will have to be complete.
Topic: Plat
Number: 8 Created: 3/16/2004
[4/30/04] There are still several typos that need to be corrected in the plat language.
Original comment:
[3/16/04] Please see reclined plat for changes needed to the plat language. Also, please see attached plat language.
'1f S¢t: V2cz-'V�t I Pr CA —� coy'V-Z�
Signature
.Iz:b
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility __ Redline Utility Landscape
Page 1
Project Comments Sheet
ME Selected Departments
Col liI'.ns
Department: Engineering
Date: November 9, 2004
Project: EASTGATE PDP (RESUBMITTAL) - TYPE
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
November 10, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore n
Topic: General [ r
Number:6 Created: 11/9/2004 ��� �• `
[1119/04] Please review LCUASS appendix E for scanability requirements for all plans and
revise plans as necessary.
Number: 7 Created: 11/9/2004
[11/9/04] The site plan shows a much larger area than is needed, making the actual site
very small and more difficult to decipher. Please enlarge the actual site for the site plan.
Number: 8 Created: 11/9/2004
[11/9/04] There appear to be no street trees provided for the north half of the property's
frontage on Montgomery.
Number: 9 Created: 11/9/2004
[11/9/04] Please provide dimensions for parking stalls and sidewalks.
Number: 10 Created: 11/9/2004
(11/9/04] Please coordinate the landscape, site and utility plans so that they all match.
Number: 11 Created: 11/9/2004
[11/9/04] The underwalk drain proposed to connect to Riverside should be constructed
according to D-10 from the stormwater manual. Please add this detail to the plans and
revise the plans to match it.
Number: 12 Created: 11/9/2004
[11/9/04) Regarding the drainage swale flowing north to Riverside: It appears that the
propqsed ultimate condition of the swale will impact Lot 3. Please either obtain easements
4innatare Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
__ Plat _V Site Drainage Report Other_
XL Utility _ ✓ Redline Utility Landscape
Page 1
for this condition and put up money for the construction of it, or have the owner of Lot 3 sign
the utility plans and DA, or revise the plans to not obligate the owner of Lot 3 to any
improvements that this project will not be making.
Number: 13 Created: 11/9/2004
[11 /9/04] Under the previous project, a letter of intent was received from the owner of Lot 4
for the proposed drainage to cross that lot. It appears that this new submittal exceeds that
original intent, and that reapproval is needed from the owner of lot 4, and approval is
needed from the owner of Lot 3.
Number: 14 Created: 11/9/2004
[11/9/04] See redlines for any additional comments.
Page 2