HomeMy WebLinkAboutMASON STREET NORTH - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-08-03City of Mort Collins
Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 05-06 Issuance Date: 4. 1.05
Project Name: _ Mason Street North
Project A.K.A.: Mason Street North Major Amendment to Martinez PUD
Project Location: _ 403 Mason Court
Permittee: Peter Clyde or Beverlv Clyde
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 300.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 5,200.00
Total $ 5,500.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
mprovements to be constructed as shown on the approved plans for the development.
$ 202 478.97
Form of security deposited with the City: letter of credit
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Frigincer prepare revised design drawings and secure City approval for all revisions to
the t !tility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications ofthe City. The Permittee shall
provide "as -constructed' plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Ingineer- shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
4-0)1-W'o FA 0171)..
tvthv:Jcgoc.cnn�
I!
{}\({{\\)-I---- «
(()(}}}} / j}}{}} / (/ /
\)
\j
<Il:
=4_
z
.
\0
\k
� }|
\I<
z
)\)\
\ /(/ /\{. .
N a
C)D'D�n��yv
U)<LN
�D�C�AN
�.
�rM
m
M
m
J
.�
O
O
< ...�
D
�.m moo Va
<`�� m acn �� Oo
m U� V!
��
m
m aC)
d W m d
�c m m
mr�',O
Om
J
Amy
N'� °
D3
d m 3
o nv m
a
mc?^
Dn
r
3 F
J m
c0 cJi
Tp
aF
Im 2. mN
�°= m
On
m
<
= m J m
m
m D
a y
3
N j N
C
m o
m
1 m
N m
n m
Z D
x
Az
U)
c
1y
rn
n N
m
N
N
r
O
c m
n
z
m 0
c
=m
055
m
m
0)z
1 m
m
c
O�
WW(n rwn
DDDDDDDrrr
yy0C)rr
DZ
<
�
A
{ { mM-Tl-�w
000C)C)noTmm
C)0<<TT
cN
On
WO z
m _ _ _ _ _ _
_ _
� O
3
ur
mmc
,
z
o m
>n z
N 1
m
� C M
O�O�
�0Zi�v
Z
1 D
�
mm m
3
� c
I o
1
o
W
W
Zn
mZ
O T
1
N W
W W
J
mm
m
OV!
O O m
O W O O V
c)D^0002
m�
X Y�
m 0
T N Z m
�'
1
m'p
n n
0
D 1
mm
�
c1
m
A
N n
0 3
W
z c n
m
m
EA EA EA H3 A
EAA UEfl� A j
U N V U Efl fA
O W m AEA WEflN AEA
N EA EA
EAOEA EANU
O
D
<1
Z
O1
1
= Q
O U p O W A
O D U W O O O N O O
O W O O W
1 m
Z
N
O O m O N 0 0
oou,0000
O O O O O O O N O
0000000co�o
O O O O D U
0000co co
x
m
m
0 Z m 1
m 1
mT1O
m
1U)D
G �'
Z
U fA EA N
Efl EA EA ffl
EA
O N
c 0
>
W N m A
V W U
(D
n
m
m
EAU A Efl OV UAi
O A (UO EA Efl EA
EA N EA EA O
1
c
O O V O A A
O. O O OP O
O A 0 0 0
-�{
obaomob
obo 000' o
b0oornia
m
O
o uo
mix.,
m
i0Omm
m_An
Z :.K.
mc0
n
NEA
�f
EA Efl EA fA EA ffl
EA EA Efl ffl fA
W W W V O V V EA Efl ffl
O O Efl Efl ffl EA
O Z
� 7-
f`
O O O
U U U O W 0 0 0 0 0
W W W W O O
1
r
A A O O O A
cn cn000cn
O O O O O O O V V V
o000000000
O O D U V V
000000
�
mNO
0
1
m�1
m
S
m D
n r
Z
✓M
z
EA EA EA
EA EA EA Efl fA EA 0FA
Efl EA EA
m` 1
Efl N V fA W A
O (O Efl A W EA
fA N EA EA A A
O U OOO V
O O O O O O
OOO 000 O
O O O O O O O
OOOO (D (O
O O O O O O
MRR.14.2005 4427PM DRRHOTR INC
RECEIPT DATE
a
RECEIVED FROM
o
AOORE5S I tit' SiY�
i
FOR
pccouHr h
u T CAGFJ
CFECI<
AMT. PAIDUF
Moj
E4lANCE DEY OR
NO.731 P.1
3—ro-o5 5133
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2,16/99)
For City use only: Application Number: _d019-04 Application Date:
s.
Permit application fee: S 300.00
INSTRUCTIONS:
I . Complete this form (some questions may not apply to vou) and attach all necessary documents and
suhmit to the Development Engincerin_a Section of the City.
_. If vou huee in% questions contact the Development Engineer, Katie Moore at221-660f.
Submit the Application and pay the Application Fee at the fee at the P_.ngineering counter at 281 N.
Collel"e ;Avenue.
PROJECT INFORIMATION:
Project Name (as approved by the City):
Mason Street North
Project .-1.K.A. (Marketine name if different from Project Name):
Project Location: 403 Mason Court
Fort Collins, CO 80524
Property Owner(At the time of this permit issuance):
Individual Name: James Leach
Company Name: Mason Street North, LLC
Address: 4676 Broadway, Boulder, CO 80304
Phone number(s): —
Officc: (303) 449-3232
Ccllphone:
FaxnUtnbeF (303) 449-3275
Email:
A p plicant/Proj eel Manager (1'he primary contact person for all matters regarding this project, and the
pcnon responsible i-or all matters referencing "the Developer" in the Development Agreement for this
project)-
Individual V`ame: Peter or Beverly Clyde
Company Name: Greystone Industries, Ltd.
Address: 2510 Westward Drive, Lafayette, CO 80026
Phone number(s):
Office: (303) 926-1617
Ccllphone:(888) 463-7039
Faxmmnber: (303) 665-2402
11111ad peter@greystoneindustriesltd.com
Development Constriction Permit, Page 2/6
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient tojustify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 ofthc Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City: and (3) required certifications from the licensed professional engineer that improvements
arc completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Frosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/6
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: Contact Bob Burkhart Martinez Park manager, at (cell) 567-7292, or
221 -0 307prior to any work on Parks property.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority. I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature: � >ti� Date: �`�Z J
Approval for issuance:
City Engineer Approval: �„� � Date: y/O,
(Permit Issuance Date)
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Mason Street North
Project A.K.A.: Major amendment to Martinez PUD
City Staff Contact Persons:
Development Engineer: Katie Moore, 281 N. College Ave., Fort Collins,
CO 80522 (970) 221-6605
Construction Inspector: Dave Burke, 281 N. College Ave., 221-6605
Current Planner: Ted Shepard, 281 N. College Ave., 221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Ft Collins, CO 80521
970 221-6854
Stormwater Utilities Engineer: Glen Schlueter
700 Wood Street, Ft Collins, CO 80521
970 224-6065
Erosion Control Inspector: Bob Zackley
700 Wood Street, Ft Collins, CO 80521
970 224-6063
Natural Resources: Doug Moore 281 N. College Ave, 221-6750
Traffic Operations: Eric Bracke
970 224-6062
Street closures: Syl Mireles
625 Ninth Street, Ft Collins, CO 80524
970 224-6815
Transportation Planning: Kathleen Bracke
215 N. Mason St, Ft Collins, CO
970 224-6104
Forestry: Tim Buchanan
215 N. Mason St, Ft Collins, CO
Development Construction Permit, Page 5/6
970 221-6641
Light and Power: Doug Martine
700 Wood Street, Ft Collins, CO 80521
970 224-6152
Developer' Contact Persons:
Project Manager/Developer: Peter or Beverly Clyde
Greystone Industries, LTD.
2510 Westward Drive, Lafayette, CO 80026
(303) 926-1617
cell (988) 463-7039
fax (303) 665-2402
peter@greystoneindustriesltd.com
Owner(s): James Leach
Mson Street North, LLC
4676 Broadway, Boulder, CO 80304
(303) 449-3232
(303)449-3275
Architect/Planner: Korkut Ornaran
Wolff*Lyon Architects
777 Pearl Street, Suite 210, Boulder, CO 80302
(303) 447-2786
(303) 447-2968
korkut cr wlarch.com
Project Engineer: Brian Shear
Shear Engineering Corp.
4836 S. College, Suite 12, Fort Collins, CO 80525
(970) 226-5334
cell 566-2939
fax 282-0311
bshear�tshearenpinecriue corn
PE license number 20262
General Contractor: Jim Swartz
Drahota Development Company, LLC
PO Box 272269, Fort Collins, CO 80527
(970)204-0100
cell 846-0192
Development Construction Permit, Page 6/6
fax 204 0200
jim.swartz(a�drahota.com
rll
k
=_
1 I
r �
lT I�
--L
II
r
i'
4
�
I
5/-1
,
I I
—
k
At"�Y
—
��.
�
I
Iji
� f
j I
I
I�IIIIIY
W
)o
!
._ \:\\\\\0-1
::-<>!
_ }\\§\,\(:}(}
{((Q
0§\\/0�'°`�
\}��^
:::r >, w ,: :: >,:::::,,,�
!!!i Q :;:iziii>i;::iz: d
}))§}((}}}}}})))})}}(i\}
/)
(\
k
r
!
- !
; ((}j
_ }((}§:)(§
(! - )!:t°[:>:::
§()!!::>>=;:i):{§i))j))()i
§I§(}) d
/\/\(/\/\
\ }\{{}}{\}}}}}{{}
■■U**
.........
/(/\/. /\(
}\}\}\\(}\}}\\}}\{}\}\\}\(\}{\
(\ \}