HomeMy WebLinkAboutLINDIMER - Filed CS-COMMENT SHEETS - 2009-01-05PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 4 May 1993 DEPARTMENT:
PROJECT: 26-93 LINDIMER SID - Preliminary
Ted Shepard
PLANNER:
Please respond to this project by Friday, May 14, 1993.
No Problems
AProblems or concerns (see below)
'1vm
vJOL+eir cu � nI o,) n
C0t)�� C; { �, \je mend
? �'IG i'
`i'h e. 'CLU'UNl Vl� c2��t�w� VLF
L
• Gt ����� G11 `��yi 2 rY� i 5 �� i �� 4�
ik mum 11-e-� de<��p� ned �� 5hcwn er 41e nq
441A+ L1 S LR t GtiiJ� �S Mi Y12 .����
Date: � g i� Signature:������K—
CHECK IF REVISIONS REQUIRED: ❑ SITE
❑ LANDSCAPE /
❑ UTILITY
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
o '(he 60f-Jk? neeA -� b- j,neAezt
-F1'om'i
rlo i��r,�je -be- ween the cvr�es�
MGre clel�til �� u�ee�� one �xi condi+,� o
�o �r ko �h2 ��v►h ��r��in� �mou�ovl�✓��s�
can be ht�en �zv� I h�
�rn ' Ov"rOJ n� ✓J
STENNART&kSSOCIATES
Consulting Engineers and Surveyors
June 7, 1993
Ms. Kate Mahler
Storm Water Utility
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
Dear Kate:
The following is the erosion control cost estimate for Lindimer
Subdi vision:
Cost Option I:
1. Straw Bales — 2 @ $100.00 $200.00
2. Gravel Filters — 2 @ $100.00 $200.00
Cost Option II:
1. Reseeding — 153.767 S.F. @ $0.0149 $2291.00
The City's requirement of 150% of $2291.00 = $3437.00
If you have any questions regarding this matter, please call.
Sincerely,
6u-w-'k 0 c2akA,( -,
Richard A. Rutherford, P. E. & L. S.
President
irr
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Sox 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
�1lunurrr
• G f
° 5028 •
:P�,.,��To �• & 1L. .5 �QO,y,,�.
OF C OVpPi,,�'
�18III11111%,*
e P
PROJECT
COMMENT SHEET
City of Tort Coll
DATE: 8 June 1993 DEPARTMENT:
PROJECT: 26-93A LINDIMER SUBDIVISION - Final
PLANNER: Kirsten Whetstone
Please respond to this project by Friday, June 18,1993.
❑ No Problems 1�01-GC#;7 CO
❑ Problems or concerns (see below)
Date: Signature:
❑ T
CHECK IF REVISIONS REQUIRED: ❑ PLAT
SITE
❑ LANDSCAPE
❑ UTILITY
COS1MLNITV ri.anni�r. u
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLORAD0 80522-0580 (303)221-6750
PLANNING DEPARTMENT
City of Fort Collins
DATE:
TO:
FROM
RE:
Transl tation Services
Engineering Department
MEMORANDUM
December 12, 1994
Mark Linder
Lindimer Subdivision
Matt Baker
Civil Engineer
Escrow for Lindimer Subdivision
/g g
Because of the grade difference in the street design and the existing grade of the
adjoining parcel, Birmingham Drive could not be completed to the subdivision property
line.
In accordance with the City Code, the developer can fulfil his obligation for the
construction of this street by remitting 100% of the estimated cost to the City, or placing
150% of the estimated cost in escrow. I understand you prefer the first option.
Funds for this work are held by the City in a contribution -in -aid account, to be used only
for this future work. (Escrow accounts must be non -expiring and in a form acceptable to
the City.)
I estimatcthe cost of this construction at:
$167.00 3" Asphalt
$210.00 CG&W
$109.00 ABC
362.00 Embankment, grading, subrade preparation
$848.00 Construction cost
Receipt of this amount will release the engineering hold on the building permit issuance
for lots 10 and 11.
If you have any questions, feel free to call me at 221-6605.
2-41 X01 th College Avenue • f .0. Bus 580 • Fort Collins, CO 80522-0580 • (303) 221-6605
PROJECT
City of Fort Cole COMMENT SHEET
DATE: 8 June 1993 DEPARTMENT: h
PROJECT: 26-93A LINDIMER SUBDIVISION - Final
PLANNER: Kirsten Whetstone
Please respond to this project by Friday, June 18,1993.
❑ No Problems
❑ Problems or concerns (see below)
l�,iz� ,!IFS"%6'N x'�'C�i�'/�`l"7ni✓�',
/eo J IWIU C'� /C4 �.
Date: �/ ' �� Signature:
❑ PLAT
CHECK IT REVISIONS REQUIRED: ❑ SITE
❑ LANDSCAPE
❑ UTILITY
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.ROX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
4& PROJECT
City of Fort Collins
COMMENT SHEET
DATE: 4 May 1993 DEPARTMENT:
PROJECT: 26-93 LINDIMER S/D - Preliminary
Ted Shepard
PLANNER:
Please respond to this projectbyFriday, May 14, 1993.
No Problems tie
❑ Problems or concerns (see below)
Date:
Signature:
CHECK IF REVISIONS REQUIRED:
❑ PLAT
❑ SITE
❑ LANDSCAPE
❑ UTILITY
DEVELOPMENT SERVICES 281 NORT11 COLLEGE P.O.BOX 580 PORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPART ME.N"I'