Loading...
HomeMy WebLinkAboutSTORYBOOK SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-08-02CAA (if ` _i _oi n- Transportation Services DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 05-19 Issuance Date: Project Name: _ Storybook, 2°d Filing, Phases 1 and 2 Project A.K.A.: Project Location: Northeast comer of Mountain Vista and Little John Lane Permittee: Garr Mackey, Nebarado Construction Company City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 300.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 14,637.05 Total S. 14,937.05 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 196,381.25 Form of security deposited with the City: Letter of credit # 1200083677-3 Farmers Bank PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the t Iti I ity flans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and -Frigincer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. General Contractor ( The contractor in overall charge of the public infrastructure construction): Individual Name: Gary Mackey Company Name: Neharado C onctn rtion Company _ Address: 6804 Aaron Drive, Fort Collins, CO 80524 Phone number(s): Office: (970) 482-4590 Cellphone: (970) 566-9890 Fax number: (970) 482-6317 Email: fcbigguy@frii.com If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Utility contractor: Individual Name: Company Name Address: _ Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for structures: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Paving contractor: Individual Name: Company Name: — Address: _ Phone number(s): Office: Cellphone: _ Fax number: Email: Landscape contractor: Individual Name: Company Name Address: Phone number(s): Office: Cellphone: Fax number: Email: Other contractors and parties involved in the project: SUMMIT THE FOLLOWING ITEMS (Required for all projects): • 81 /2"x I I " copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled 'Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): u Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings u Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Gary Mackey Jerry Robinson Title Developer/Owner Engineer ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $ Private infrastructure, estimated cost: t certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in tiling this application 1 am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. r Applicant Signature342� � �L/�ti(� Date: D?' 07 —dS� Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 ofthe Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 9. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted bN the City, (2) punch list items from the final inspection are completed and accepted by the City, and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans: and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature,,'; — ` i -,' • Date Approval for issuance: City Engineer Approval: L `ter - e2 Date: 7 (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Storybook, 2Id Filing Project A.K.A.: City Staff Contact Persons: Development Engineer: Construction Inspector: Current Planner: Name, address and numbers Katie Moore, 281 N. College Ave., Fort Collins, CO 80522 (970) 221-6605 281 N. College Ave., 221-6605 Ted Shepard, 281 N. College Ave., 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Ft Collins, CO 80521 970 221-6854 Stormwater Utilities Engineer: Glen Schlueter 700 Wood Street, Ft Collins, CO 80521 970 224-6065 Erosion Control Inspector: Bob Zackley 700 Wood Street, Ft Collins, CO 80521 970 224-6063 Natural Resources: Doug Moore 281 N. College Ave, 221-6750 Traffic Operations: Eric Bracke 970 224-6062 Street closures: Syl Mireles 625 Ninth Street, Ft Collins, CO 80524 970 224-6815 Transportation Planning: Kathleen Bracke 215 N. Mason St, Ft Collins, CO 970 224-6104 Development Construction Permit, Page 5/5 Forestry: Tim Buchanan 215 N. Mason St, Ft Collins, CO 970 221-6641 Light and Power: Doug Martine 700 Wood Street, Ft Collins, CO 80521 970 224-6152 Developer' Contact Persons: Project Manager/Developer/Owner/General Contractor: Gary Mackey Nebarado Construction Company 6804 Aaron Drive, Fort Collins, CO 80524 Office: 970 482-4590 Cell: 970 566-9890 Fax: 970 482-6317 febigguy@frii.com Architect/Planner/Project Engineer: Franklin D. Blake Stewart & Associates, Inc. 103 South Meldrum Street, Fort Collins, CO 80521 970 482-9331 fax 970 482-9382 stewarts(a�frii.com PE License # 7839 N�MJ:1(1b15NOJ bOJ 03J�1tlk1Y .c6+� siwl xM I BtiJ ,no uia �•1 ®. A rcu Jus � 6tlOA8AN(IS dYY 5891NI'Jlp .]f6l'l(ISNO] rMYOW '9lJW Wy ]Aw an /�.yMlS - = S�lvi-,ossv 81avM-liS IV :I °l Yssk2� ti .w_e Ligg�e k: ° sxLs x n 5hgko fll P1 I�ii { 11 I fa�5v g. O�eP 2 J'[ 1 tg a "IJ k11 1 III .#'t p a20 y�Ti ,.I� �I 1 WI II a�a��i�3ki�y��g3i 1JMi0a M:MU NJ1LL1 � I` �, 8•��4� 3�+ I�22 T! R 's�sd%b L x p pp s pp g�— psi€ [,-lilTa_ijlrT $ iyYM 34tp Y15N NM1Nf10X 8 F- LU W 2 N W r r LU W 000000 co cD0000 0000000000 000000000o �n00000 a000000 r+:. ,Q ri c+ioovio N 07 Vi fA � fA 000000000o fA fA fR fA lA fA fA EA fA fR voi iri rio ri' I� W M � kA O ti �: m LjJ di fA Ki O V O cli Z e to Z O r U JLU w m b fL 0 bow °Zlwi Z O W ". r w �w2 .. Z W UJ 0. K } W' LL w N w am CL 2 > O Zw _ W o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o N o 0 0 o r N NCL $ O O O O O O 0 0 0 0 0 0 0 0 0 0 kA EA fA fA fn fA fA fA fA O O O M O M fA I� O N EA '7 wW: - W r (O V EA fA O di to (O (D M 7 O co O O A a. V) �Ly. n _ Z � = w ¢ m A i A A Q1: 1¢- w U ~w O U Z O O > r W - U LU w w W 2 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v o 0 0 0 O N O O O O N V O Q = � Z F, w r' O �fl O O O O 0 0 0 0 0 0 0 0 0 0 a O O �- O �- W rOz U w m w r ix U � j ❑ n Q ix 7 N � W � D y�nw.¢ w>Oj <z(nmJ)(L >z w00u. °aF- '.IX W Z V¢ m U U O U :y ��oo�no 00000a0000 o��`mo^ Q, ~ w n om� LL'0 W Z�vv Z;w w _ r O tsi Z W •=J o mr m- w}ov13 w w fD m j �z° ma 4i0 F, ¢ O 1-;, r C7 waa Ouj ao U. w U) °D xx m c U -(iicuoouUU n >-¢ �' U J 0 Z W WW0 wWWWWWW U LL N O N w coZ-a0 J oiS U � m a o Oa U U ar Jam N w v)U ar QO V n rD W d ` ` � C N C W is_ c ¢ > _ fn c cNi U > w W J IR it 2 m a 3 w- -o Z m a c .0 0 �a, '� I- N E m a J N Oaf mc) a`°i.� m 3 -U fmun LU �rr p aJw ~ U) CO _...m n y� U� O r1- a UF> nomCd d i w a' 6mm waN >2ii c�aUoa il0 ? DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/i 6/99) For City use only: Application Number: Application Date: permit application fee: $ 300,00 INSTRUCTIONS: I. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer,— ,,�r ;.at221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Storybook 2nd Filing Project A.K.A. (Marketing name if different from Project Name): Project Location: SW 1/4 of Section 32, Township 8 North, Range 68 West of the 6th P.M. Property Owner(At the time of this permit issuance): Individual Name: Gary Mackev Company Name : R F I M of Fud Collins 1.1 C Address: 6804 Aaron Drive, Fort Collins. CO 80524 _ Phone number(s): Office: (970) 482-4590 Cellphone: (970) 566-9890 Fax number: (970) 482-6317 F•mail: fcbigguy(a)frii.com Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Gar "i Maekev Company Name: Neharado Construction C'omnanv _ Address: 6804 Aaron Drive, Fort Collins, CO 80524 _ Phone number(s): Office: (970) 482-4590 Cellphone: (970) 566-9890 Fax number: (970) 482-6317 Email: fcbigguy(tj),frii.com Permittee (Person who is to sign the Development Construction Permit): Individual Name: Gary Mackey Company Narnc : Neh.rado Cnn stn ctinn Cor mnnu)� Address: 6804 Aaron Drive Fort Collins. CO 80524 Phone number(s): Office: (970) 482-4590 Cellphone: (970) 566-9890 Fax number: (970) 482-6317 Email: fcbigguy@frii.com Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible lbr the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Individual Name: Franklin D. Blake Company Name : Stewart Rr Assoeiates, Inc _ Address: 103 S. Meldrum St., Fort Collins CO 80521 _ Phone number(s): Office: (970) 482-9331 Cellphone: N/A Fax number: (970) 482-9382 Email: stewarts@frii.com Professional License Number: 7839 Architect/Planner (The person responsible for the site design of this project) Individual Name: Franklin D. Blake _ Company Name : Stewart & Assnriatec, hs Address: 103 S. Meldrum St., Fort Collins, CO 80521 _ Phone number(s): Office: (970) 482-9331 Cellphone: N/A Fax number: (970) 482-9382 Email: stewaris(dpfrii.com Professional License Number: 7839 Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement -add additional names below): Individual Name: Gary Mackey _ Company Name : R F 1. M of Fort Collins I I C Address: 6804 Aaron Drive, Fort Collins, CO 80524 _ Phone number(s): Office: (970) 482-4590 Cellphone: (970) 566-9890 Fax number: (970) 482-6317 F,mail: fcbigguy@frii.com