HomeMy WebLinkAboutSYMBIOS LOGIC OFFICE BUILDING - Filed CS-COMMENT SHEETS - 2005-07-21PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 23, 1996 DEPT: Engineering - Ping
PROJECT: #5-9410Symbios Logic PUD -Overall
Development Plan
PLANNER: Steve Olt
All comments must be received by: May 3, 1996
❑ No Problems
0---Problems or Concerns (see below or attached)
• 1. Will need to confer w/ CDOT to verify the Harmony Rd. access is within code.
2. Make note about temporary access location and the future expectations for the
access.
3" Are any of the other accesses temporary?
/ s %e
D � e
oeC)
L r �N �PH No%�n'Di /NP
e Tv
(..,.i r ze�P/, es
Date: S - �;� Signature: J
C�S YUU WISHTO RECMVE U PLAT
COPIES OF REVISIONS SITE
❑ LANDSCAPE
❑ UTILITY
0
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 23, 1996 DEPT: Engineering - Ping
PROJECT: #5-940 Symbios Logic PUD - Overall
Development Plan
PLANNER: Steve Olt
All comments must be received by: May 3, 1996
❑ No Problems
Lam' Problems or Concerns (see below or attached)
• 1. Will need to confer w/ CDOT to verify the Harmony Rd. access is within code.
2. Make note about temporary access location and the future expectations for the
access.
3. Are any of the other accesses temporary?
e
t�s (-e
(fie <ee .voT�.vHMP
y( eT /
Date: S S - � Signature:
C�45TTQ�VE U PLAT
COPIES OF REVISIONS 0 SITE
❑ LANDSCAPE
❑ UTILITY
I
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: June 25, 1996 DEPT: Mapping
PROJECT: #5-94F Symbios Logic PUD - Final
PLANNER: Steve Olt
All comments must be received by: July 5, 19QA
,
�. Wliy,
two
11He5
a,s
SN68
Roy.) I —� iS
uhc.)egr-
40 w1 cti
is
tl"a.
Rto.
Z. -DC-C P-1P,6 0c9Ten.. f3our. 3A#Zy MONUme W rl ,
3. \AJ14RT 1 5 'Tt4a7 (-)igQ'A T�G'TWGt3N 'rj4S SM (D 8 JeUW
A,J,O THE= Ou-ce 2r3o%jN0An.7 7
E�4Jcmr�>✓Tj �`/•¢�� on A,2�
T C o 776 -7-4a; %3a ✓nrA,o on- Lor C i lv e-i -
So rYl a ntrArLl 11 .4 ae In tSJin7
Date:
Signature
CHECK IF YOU WISH TO RECEIVE
COPIES OF REVISIONS
0� PLAT CGu� e
❑ SITE
❑ LANDSCAPE
❑ UTILITY
PROJECT
COMMENT SHEET
City of Fort Colllins
Current Planning
DATE:9-18-96 DEPT: ENGINEERING
PROJECT„ Symbios Logic P.U.D. Final
PLANNER: Steve Olt
All comments must be received by:
eNo Problems
Problems or Concerns (see below or attached)
• SITE PLAN SET
l . Add notes as shown concerning the future use of the CR 9 access.
2 Sidewalk along CR 9 needs meandering or westward shifting around existing manholes.
• UTILITY PLAN SET
1. Need a signing/striping plan for the CR 9 access area.
2. Need a pedestrian access easement for sidewalk outside of ROW.
3. Need letter of acceptance from utility easement users if CR 9 sidewalk is shifted into the
easement.
5. Need to maintain CDOT clear zone requirements and check with CDOT on acceptance
of overhead utility poles in the clear zone and ROW (if applicable).
6. See comments I & 2, SITE PLAN SET.
7. Provide details of both accesses and a prelim. design of the future Corbett intersection.
9. Please provide existing Harmony Road data (lane widths before, after, & adjacent,
ROW, pavement edge, etc.).
10. Bike lane to be 8' wide and shoulder is to be 4' paved (hold adjacent slopes in ROW to
CDOT standards).
11. Need to adjust Harmony Rd. cross slopes to improve smooth driveability.
** See other comments throughout plan set.**
Date: q_ / 9- - s G Signature: Zaazn*�
PLEASE SEND COPIES OF MARKED REVISIONS: LAT 61)
G S`ITE
2--lffTI ITY
ANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 23, 1996 DEPT: Engineering -Mapping
PROJECT: #5-94E Symbios Logic - Preliminary
PLANNER: Steve Olt
All comments must be received by: May 3, 1996
❑ No Problems
® jProblems or Concerns (se(e� below or attached) l3&c1� .5eG 1��e.� SLha.PIRJ, JQA)VICItI
Date: Signature:
CHECK IF YOU WISH TO RECEIVE PLAT
COPIES OF REVISIONS ❑ SITE
❑ LANDSCAPE
0 UTILITY
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 23, 1996 DEPT: Engineering - Ping
PROJECT: #5-94E Symbios Logic - Preliminary
PLANNER: Steve Olt
All comments must be received by: May 3, 1996
❑l �No Problems
0 Problems or Concerns (see below or attached)
• OVERALL UTILITY PLAN !.lc,e5f.
1. Label temporary easawentand state the future expectations for the access.
2. Site will require a 15' utility easement along Harmony Rd. and C.R. 9, and a 9'
utility easement along Corbett.
3. 1 will need to confer w/ CDOT as to their acceptance of the Harmony Rd. access
location. It is a little short of the location planned in the state access code, but
we are assuming at this point, that it is within an acceptable proximity.
4. New Harmony Rd. Bicycle Transportation project would be greatly appreciative
of any addiitional R-O-W / easement space Symbios could provide to help
facilitate the bike lane desired along Harmony Rd.. Contact Kathleen Reavis @
221-6140 for info..
5. Site will require accel / decel lanes on Harmony Rd..
• PLAT
1. See comment 2 above.
2. Define Tract "N'.
3. R-O-W sufficient to provide 60' half R-O-W (66' w/ accel/decel lane) is required
Date: S— / S- - i 6 Signature: