March 20, 1998
Tess Jones O 1
Access Coordinator
Colorado Departme
1420 2nd Street nt of Transportation, Region 4 '
Greeley, Colorado 80631
K.
7
Dear Tess:
Attached is the pplication d pertinent information for a State Highway Access Permit at the
Symbois, Inc. site. The application is to request approval for a new access location
and the closure of an existing access adjacent to State Highway 68 ( Harmony Road ).
Thank you.
Sincerely,
Dave Stringer k
Development Review Supervisor
T c.,
LP
2t;I V'nrth CPllogc;AyonUP • PO. Bov O80 • Port Collin,, CO 80622-0580 • (970) 221-6605
Date: April 6, 1998
Exhibit E
Terms and Conditions
The Permittee shall refer to all additional standard requirements on the back of this Permit
and any enclosed additional terms, conditions, exhibits and noted attachments.
2. Incorporated as part of this permit are the following:
Application for Access Permit (CDOT Form No. 137)
Both sides of the Permit (CDOT Form No. 101)
Exhibits: "A" - A -Line Quit Claim Deed, CDOT
"B" - A -Line Quit Claim Deed, Symbois
"C" - Access Plan (utility plan sheets)
"D"- Site Plan
"E" - Special Terms and Conditions
3. This Permit is issued in accordance with the State Highway Access Code (2 CCR 601-1),
and is based. in part upon the information submitted by the Permittee. This Permit is only
for the use and purpose stated in the Application and Permit. Any changes in traffic
volumes or type, drainage, or other operational aspects may render this permit void,
requiring a new permit to be applied for based upon existing and anticipated future
conditions.
4. If necessary, minor changes, corrections and\or additions to this permit may be ordered by
the Department inspector, other Department representative or local authority to meet
unanticipated site conditions. Changes may not be in violation of the Code. All major
changes to the plans must be approved in writing by the Department prior to
commencement of any work on or within the State Highway right-of-way.
5. Reconstruction or improvements to the access may be required when the Permittee has
failed to meet the required design and\or material specifications. If any construction
element fails within two years due to improper construction or material specifications, the
Permittee is responsible for all such repairs.
6. The Permittee is responsible for obtaining any necessary additional federal, state and\or
City\County permits or clearances required for the construction of the access. Approval
of this access permit does not constitute verification of this action by the Permittee.
All costs associated with the installation of this access are the responsibility of the
Permittee. This includes the design, construction, utility relocation, testing of materials
and inspection.
8. Landscaping shall not obstruct sight distance at any state highway access point.
Terms and Conditions (Continued)
9. Permittee is responsible for any utilities disrupted by the construction of this access and all
expenses incurred for their repair.
10. Survey markers or monuments must be preserved in their original positions. Notify the
Department at (970) 350-2173 immediately upon damage to or discovery of any such
markers or monuments at the work site. Any survey markers or monuments disturbed
during the execution of this permit shall be repaired and\or replaced immediately at the
expense of the Permittee.
11. The Permittee or the contractor shall notify City of Fort Collins, Engineering Construction
Inspection at ( 970 ) 221-6605 at least two working days prior to beginning any access
improvements or construction of any kind within the state highway right-of-way. Failure
to comply with this requirement may result in the revocation of this permit.
12. The access shall be constructed 44.23 feet wide, with 50 foot radii as per Exhibit " C"
13. All required access construction shall be completed prior to the herein authorized use of
this access.
14. The access shall be surfaced immediately upon completion of earthwork construction and
prior to use.
15. Surfacing shall consist of 3 inches of Asphaltic Concrete Pavement over 11 inches of
aggregate base course or 2 inches of asphalt over 5 inches of plant mix bituminous base.
I & If frost, water or moisture is present in the subgrade, no surfacing materials shall be placed
until all frost, water or moisture is gone or removed.
17. The access shall be constructed and maintained in a manner that shall not cause water to
enter onto the roadway, and shall not interfere with the existing drainage system in the
right-of-way. Drainage to the state highway right-of-way shall not exceed the historical
rate of flow.
18. A COMPLETE COPY OF THIS PERMIT SHALL BE ON THE JOB WITH THE
CONTRACTOR AT ALL TIMES DURING CONSTRUCTION. If necessary, minor
changes and additions may be ordered by the Department or local authority field inspector
to meet unanticipated site conditions. FAILURE TO COMPLY WITH THIS OR ANY
OTHER CONSTRUCTION REQUIREMENT MAY RESULT IN THE IMMEDIATE
SUSPICION OF WORK BY ORDER OF THE DEPARTMENT INSPECTOR OR THE
ISSUING AUTHORITY.
Transpor on Services
Engineering Department
City of Fort Collins
April 26, 1998
Tess Jones
Access Coordinator
Colorado Department of Transportation, Region 4
1420 2nd Street
Greeley, Colorado 80631
Dear Tess:
Attached is the application and pertinent information for a State Highway Access Permit at the
Symbois, Inc. development site. The application is to request approval for a new access location
and the closure of an existing access adjacent to State Highway 68 ( Harmony Road ).
The right -in / right -out only access is identified in the SH68 - Harmony Road - Access Control
Plan. The plan identifies the access at 1150 ` west of the centerline of Larimer County Road 9.
The access is planned at Station 148+85 west ofLarimer County Road 9. The City deems this to
be a minor adjustment in the designated location, therefore, is acceptable.
Attached to the specific site plan for this project is the Overall Development Plan showing the
proposed access locations and traffic circulation routes at the time of final build out. There are
several access locations onto future Corbel Drive as well as County Road 9 for this site.
Consequently, the access at Harmony Road will function without traffic congestion at the
intersection. This ODP is in compliance with the "A"- Line amendment with the exception of the
access point at Station 144+45. This access location is currently being used by the ditch company
as an access to their maintenance road for the ditch. Therefore, the "A -"Line dedication was
shown as an opening for the ditch Company access.
.'F1 \arth College Avenue • CO. 13o,: 780 • Fort Collin., CO 80522-015B0 • (970) 221-6605
page 2
Please note that the Utility Plans 6hown as exhibit "Ccross sections show an easement for storm
water flows outside of the state right-of-way. In the Storm Water Design Report, the
calculations for determining the size of the storm water channel and detention pond included the
amount of water coming from the road way. It was anticipated in the design to take the drainage
from the roadway into the adjacent channel and be carried to the on -site detention pond.
Thank you for your prompt attention to processing this permit. If you have any questions please
call me at 221-6605.
Sincerely,
Dave Stringer
Development Review Supervisor
cc: File
Services
Engineering Department
City of Fort Collins
March 20, 1998
Tess Jones
Access Coordinator
Colorado Department of Transportation, Region 4
1420 2nd Street
Greeley, Colorado 80631
Dear Tess:
Attached is the application and pertinent information for a State Highway Access Permit at the
Symbois, Inc. development site. The application is to request approval for a new access location
and the closure of an existing access adjacent to State Highway 68 ( Harmony Road ).
Thank you.
Sincerely,
Dave Stringer
Development Review Supervisor
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
. --NS,4"
March 4, 1998
Tess Jones
Access Coordinator
CDOT, Region 4
1420 2nd Street
Greeley, CO 80631
Dear Ms. Jones:
Attached is the Symbios, Inc. application for a State Highway Access Permit to cover our project on East
Harmony Road in Fort Collins. The City of Fort Collins passed the applications onto us for additional
information and signatures. Symbios would appreciate it if you would give this application your attention.
The project has started and the work along Harmony Road is waiting your approval.
I wish to thank you in advance for your quick response. \/
Sincerely,
Don Rott
Symbios, Inc.
Project Manager
4k
9�9
r;-
2001 DANFIELD COURT FORT COLLINS. CO
A. ISO 9001 Registered CMfmny
80525-2998 9 7 0 - 2 2 3 - 5 1 0 0