Loading...
HomeMy WebLinkAboutSUNSTONE VILLAGE PUD SIXTH - Filed GC-GENERAL CORRESPONDENCE - 2005-07-19Develo• ent Services Engineering Department August 11, 1992 Land Development Services 309 West Harmony Road Fort Collins, Co 80525 RE: Sunstone Village, 6th Filing Dear Mr. Donovan: This letter is to inform you that the utilities to include sanitary sewer and water only, have been inspected and inspected and initially accepted by the City of Fort Collins pending the normal contractor's warranty period. Please be informed that this letter of acceptance does not relieve the developer or the contractors, lot owners, or their contractors of their responsibility for the repair of any damage which may occur as a result of the building construction. Sincerely, 54X Lance Newlin Engineering Construction Inspector LN/ltg cc: Schmidt Earth Builder, Inc. 621 Sherry Drive Fort Collins, CO 80525 2S1 \orth Collei;e A%enue • P.O. Box ';80 • Fort Collins, CO 50522-0�;80 • (303) 221-660� "hL&wtL, DEC () : 1992 Ennineprinn Dept November 30, 1992 David Stringer Chief Construction Inspector Engineering Department City of Fort Collins 281 N. College Ave. Fort Collins, CO 80524 RE: Sunstone Village PUD Subdivision Dear Dave, This letter is written to acknowledge that Geneva Homes, Inc. is committed to completion of trickle storm drainage pans on the 6th and 5th Filing of the referenced subdivision. The contractor's cost for the improvements are as follows: 1. 250 feet of 2 foot wide pan at $5.50 per linear foot = $1,375. 2. One each curb chase at $650. We have provided an Erosion Control Bond for the 6th filing of Sunstone in the amount of $3,108. All of the measures have been completed except a $200 sediment trap. The sediment trap, as well as the concrete pans are scheduled for completion when weather and ground conditions allow. We would like to continue to obtain building permits in the 6th filing as buyers for our homes allow. Therefore, we respectfully request that you place an additional constraint on our erosion control monies currently on deposit that none of the security is eligible for release from your accounts until the above mentioned drainage pan improvements have been completed. If this arrangement is satisfactory with you, please so indicate by initialing and returning a copy of this letter to our office. Please call me at 225-9810 if further information is required. Sincerely yours, k' Gary HmoVer - Vice-eiresident GH/jk Commi ty Planning and Environmental Engineering Department City of Fort Collins October 6, 1992 Geneva Homes, Inc. 344 E. Foothills Parkway Fort Collins, Colorado 80525 RE: Sunstone 6th To Whom It May Concern: rvices It is standard policy for the City of Fort Collins to accept for perpetual maintenance those public right-of-way constructions which have been approved by the City and which have passed all required guarantee periods. This includes the water main, sanitary sewer mains, storm sewer lines and facilities, street pavements, street lights, and street signs. Based upon our limited inspection and to the best of knowledge the subdivision improvements have also been constructed in accordance to City standards. Sincerely, -,,��,-fir David Stringer Chief Construction Inspector DS/ltg cc: Dennis L. Donovan Sunstone 6th '81 Vorth College Avenue • P.U. Boy 780 • Fort Collins, CO 80�2'-0580 • (303) '21-r,oc—