Loading...
HomeMy WebLinkAboutSUNOL ACRES - Filed CS-COMMENT SHEETS - 2005-07-19PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 24, 1997 TO: Engineering Pvmnt PROJECT: #31-97 Sunol Acres (Lot 1, Strobel M.R.D.) - Type I (LUC) PDP All comments must be received by Ted Shepard no later than the staff review meeting;: Wednesday, December 17,1997 A final soils report and a pavement design will be required for the streets prior to construction. This report is only a preliminary report. The pavement recommendations in this preliminary report will need to be removed and the report resubmitted as per the City's requirements .New borings wilhneed to be made after utilities are installed and the streets are rough graded. The pavement design needs to be based on the new borings, and traffic information from the City's Engineering office. Date: Cffa HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ Sk _ Mnap Report _ Ok Utility _ Redline Utility — Landscape ^0=06M lei a I City of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current PlannjinV DATE: 19 December, 1997 PROJECT: :Sunol Acres ENGINEER: Michael Coley Plat DEPT: Engineering No Problems Problems or Concerns (see below or attached) • Provide a complete description of all control points. ICJ e . d We i ! 4 • Provide a legal description and label adjoining properties.,Ae • A 15' utility easement is required along arterial streets.,,, Utility Plans "'}" ' + �'• c ��. r " " Sheet 3: • Minimum tangent length between curves is 100'. lve�e • Show/label all easements, proposed storm drainage facilities, and important features within 150' of the project boundaries. u c .4. � -r ft; Sheet 4: % Is it actually an irrigation ditch that you propose to abandon? Sheet 5• +' 4 r .: n or w; �d A.I nave. • Reference/provide detail for proper driveway approach. we 6. [ D -/s v,.l.: ^ r. • Street Plan & Profile needs flow arrows, esmts, and centerline stationing. T .t✓,✓ r , Sheet 8: N This design of County Road 9 is not consistant with the approved ultimate design on file with the City. Please consult the approved plans and desiaccordingly. M';< , P JTer _5+; d -hc aye -r 4e **see redline utility plans for additional comments** 'i" C�.R � lit ;O-1 , C.-lY Fg lni .n Yi•1�`�4f vG• Date: Z I q/0%% u Signature: PLEASE SEND COPIES OF MARKED REVISIONS: ❑ LAT SITE UTILITY ❑ LANDSCAPE City of Fort Collins Current Planning DATE:11-8- 1999 ",ar V PROJECT COMMENT SHEET DEPT: Engineering PROJECT: 931-97 SUNOL ACRES PDP-TYPE 1 PLANNER: Ted Shepard ENGINEER: Dave Stringer All comments must be received by: Wednesday, November 24,1999 eNo Problems Problems or Concerns (see below or attached) 1. Need to include existing water well within 15 easement adjacent to County Rd. 9 2. Please provide reception number of existing road right-of-way for Charlie Lane 3. Show repair limits of asphalt repairs on Cty. Rd. 9. Add note re: final limits of repair to be determined by City Engineering Inspector 4. Stub and plug future sewer line outside of proposed asphalt pavement 5. Provide church information with this plan as reference 6. Add riprap at ends of curb and gutter. Show detail of curb and gutter transition into barrow ditch. 7. Request variance to street standards for design of Charlie Lane that do not meet City standards, based upon an existing gravel street being upgraded to pavement C&G and sidewalk 8. Straight-line cross slopes on Cry. Rd 9 as per 1.02.03.14 (d) 9. Other comments on red -lined plans c '� Date: // - , ) Signature: PLEASE SEND COPIES OF MARKED REVISIONS: PLAT SITE, UTILITY LANDSCAPE REVISION COMMENT SHEET DATE: June 7, 2000 TO: Engineering PROJECT: #31-97 Sunol Acres Subdivision — Type 1 — PDP (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, June 28, 2000 ElNo Comment EProbleims or Concerns (see below or attached) "*PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** zj2 Date: 'f5 — p G�i Signature: c CHECK HERE IF YOU WISH To RECEIVE COPIES OF REVISIONS Plat site _Drainage Report _ Other Ut hty Redline Utility — Landscape `j REVISION COMMENT SHEET DATE: June 7, 2000 TO: Mapping PROJECT: #31-97 Sunol Acres Subdivision — Type 1 — PDP (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: 1 Wednesday, June 28, 2000 No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** Date: Signature:_ CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat _ Site _ Drainage Report Other _ Utility _ Redline Utility _ Landscape REVISION COMMENT SHEET 4,&'eri ?p DATE: February 3, 2000 TO: PROJECT: #31-97 Sunol Acres Subdivision — Type 1 — PDP (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, February 23, 2000 ElNo Comment ElProblems or Concerns (see below or attached) "PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE" - U e a d jt 1 a n o, c c I u f'lQ I 4PI C s-�a �c� ' a c.�os1 �o %ra, 1 s ij 4-h,o-,A L o 1 4 °. Date: Signature:_ CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _ DisiW Report _ Other _ Utility — Redline Utility _ Landscape REVISION COMMENT SHEET DATE: September 8, 2000 TO: Engineering PROJECT: #31-97 Sunol Acres Subdivision - Type 1 — PDP (LUC) ST"ROUND OFREVIEW All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, September 20, 2000 ElNo Comment ❑x Problems or Concerns (see below or attached) "*PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE" 1. Please show size and class of irrigation line at ZEIGLER ROAD & TIMBERLINE, also head walls or junction boxes from ditch to pipe to ditch 9-22-00 Date: Dave Stringer CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _ Plat site _ Drainage Report _ Other — Utihty _ Redline Utility — IandsW `� REVISION COMMENT SHEET DATE: February 3, 2000 TO: Engineering PROJECT: #31-97 Sunol Acres Subdivision — Type 1 — PDP (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, February 23, 2000 No Cornment F—L—Probleims or Concerns (see below or attached) "*PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE" �-C�1k i l �r� � l.lt Li_L _.�C ��� 'lam• (F�"'-'\ Date: _-,) — r -� —�) : ' CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _ DreiW Report _ Other c-Utlty _ Redline Ul it _ Landscape RETEVISION COMMENT SHEET DATE: February 3, 2000 TO: IN PROJECT: #31-97 Sunol Acres Subdivision — Type 1 — PDP (LUC) All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, February 23, 2000 No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** o 4 - EvLiJ % �/IcT I-S is 0LzJV rj Lo - ik,/o ./T c CLrss %-2i 7A� -T- l J , Date: Signature:_ CHECK HERE IF YOU WISH TO ,'RECEIVE COPIES OF REVISIONS Plat site _ D�siW Report _ 011ur — Ub* _ My _ Inds*