Loading...
HomeMy WebLinkAboutSTANTON CREEK SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-07-14Development Construction Permit, Page 115 DEVELOPMENT CONSTRUCTION PERMIT Permit Number: C 11 ' C' 75 Issuance Date: ' l Project Name: Stanton Creek Filing 2 - Phase 5 Project A.K.A.: Project Location: _ Southeast corner of Trilby Road and Lemay Avenue more specifically Stanton Creek Drive and Stanton Creek Street Permittee: Richard i Ray, James Co (303)443-6666 City and developer contacts: See attached Exhibit "A "for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee $ 300.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 10,057.20 Total $ 10,357.20 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 202,315.00 Form of security deposited with the City: U L - 4+ PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permitter shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. N N a t U U p m 7 N � Z N m N W N W N O � O a n w U o .- — O W 0 � i'y m FTy o W COOy W 0 3 N O V' c n � N N d a coW U M z.............................................................................. ........................................................................................... t o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 "67 u N a o a a m m i-D .- F cr o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Y 0 W lD O� OI M M O t0 N N t� N t0 O Ip y u� N U y U UI °1 0 m - �m y E 0 H a y m U N O N d g E 3 D 0 4 c 4 w u m o a u c H c y 5 w LL y c m ¢ = w a U E c7 a a w LL mo ci m o f L 0 o = U m y O p v T M N � U N a � o N N N 6 V Q O H N W m O v a N_ p HI w � a. O H d N W m ll ICI N � q U a� LL N O F N F N N d N C C M N T a o N nU N � C N _o � N � N y L C N O U d � o m ma"io N N E N T d a � N a m U cl N Ol N N N a °o n m �n e Q m a r n � m a N d _N � N N O w m W N 110 a O F N ,h d O � �rrh F BI __.. _..... _.. __.... _. N N d_ OI N rYi m E a a W N N R K a U a LL N O � a F N N N d a N � m d N a` i C n N T n o a N aU N � C N O U r fn N � N L C w O d R1 w O d d y E � N 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, Whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancies will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 2 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: L,, A Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and 1 agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: `— Date:Ifl Approval for issuance: City Engineer Approval: l C� ' -Date: (Permit Issuance Date) EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Stanton Creek, 2" Filing (Phase 3) Project A.K.A.: City Staff Contact Persons: Development Engineer: Sheri Wamhoff Construction Inspector: 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 x7140 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) Current Planner: Steve Olt 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6854 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6815 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Exhibit "A" page 1 of 3 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970)221-6361 Light and Power: Bruce Vogel 700 Wood Street, Fort Collins, Co 80521 (970) 221-6700 Developer' Contact Persons: Project Manager: Richard J. Ray, James Company 2919 Valmont Rd, Suite 204 Boulder, Co 80301 (303) 443-6666 Fax (303) 443-6777 Cell (303) 931-3292 Developer/Owner: James Postle, James Company 2919 Valmont Rd, Suite 204 Boulder, Co 80301 (303)443-6666 Fax (303) 443-6777 Architect/Planner: Project Engineer: Robert Almirall JR Engineering 2620 East Prospect Rd, Suite 190 Fort Collins, Co 80525 (970)491-9888 Fax (970)491-9984 General Contractor: James Postle, James Company 2919 Valmont Rd, Suite 204 Boulder, Co 80301 (303) 443-6666 Fax (303) 443-6777 or All Other Contractors: Grading: Gary Gerrard Gerrard Excavating 1739 S. County Rd 13C Loveland, Co 80537 (970) 669-1463 Fax (970) 669-1964 Exhibit "A" page 2 of 3 Utility: Gary Gerrard Gerrard Excavating 1739 S. County Rd 13C Loveland, Co 80537 (970) 669-1463 Fas (970)669-1964 Concrete/ Flatwork: CG & S Don Wadsworth (970) 353-9573 Fax (970)352-9349 Paving: Bob Toos La'Lrge (970) 407-3600 FaN (970) 407-3900 Other: Colo. Erosion Control We.. aer Kelly (9 7 1 1) 686-0838 El '(Soils Engineer) Le.,tcr Litton (97)) 224-1522 Exhihit "A" page 3 of 3 o 0 0 o 0 0 ',0 0 '0000000 0 vvo0.0i0 10 o 0o( 0 (Do .w 0 (r,000'0 co m 0( voto00 0 O V V E EA 1� .-- EA w N Vj V EA V 00 V' V N i O q M EA EA a) d�� •VyV) N N 00 fA Eli Eli fA fH N T C LL N O F O O'O O O O O O O O O O O O O N (fl (D O O O O (0 (D O M M N 00 0) OER En V3 fA-m m EA EA ELJ EA Uj Vj EA EA fA C O. EA EA O 0) U WLL N S (D O O O O O O O O M O (D O O O N iAO.O 'O (n O (f) M O O O O n U w W - MI �' coi U '.. �. 7 MiN N co W fA fA fA (H fA'fA w mu •I F - ~ c � y N O O O O 0 0 O O M (D (O O (O O (D W (D O O O', O O O (D O (D M O N O M O W +� V 0 0 O EO M 00 (O M I- m 0 O (O U F UC V EA fR Ef3 EO O EA N fA fAIfA N EA'M 0 N M m 7 atS c � O (D W W . N � F Q W E m wco Ci ~ _ — — m U.._ (u 0 Cl) E� a S a 0 0 d z U) E Y a U) o i� a L U 'p j W E� R j o « a w ° o U 3' NU I� oa Z ISO (D!y z Q C C c 4.] C C -O L .D a) O 0 C f/i I Of F ( QU(02QU Ij 1 L IA, 1 Y ee aE Ba I ] r r �s cc j au meme � a B MWA MVE ii 9V/r' .pjs ] 7 >: movi _ ,. gos Wi p 1Z4 - y�f 9 f+A 00 ti (yM l.¢1¢ 5r i qi mz ssE rosff i ]� a 1 E � 3I� a ezr i s iZ i s a- �1y /pf. f L h eTAI CbE" peNe E x y� i 9]Be] x ff y �'" eoeos I i+4 se 49 "rt xEisams ua aE�Y .d..tlsswt 1 3e 9.LOi Se 9 9F iu9 IE- i e,s uqr � icxa v ma Ip z F+1 2 9 f�5q 1 a.oso sr RE aaWV� I y e0 eEX I ee i 1 r az ss k or _ nmT.h- -- _ e� 1 e. ....... a ..., fit i see ode �x ea 9 lass' oo sr �.E x" c¢o°s el A AHUOAFIAHE r eaa 4.e. v30 M¢ M I / a`.e a\ ] e0tl sv�s'f� sr'r^ n �` ]e u t ]0 i sr y s _l_ _ __ ____ WACTe .TM:WCT IF WA 00:91 HU, 66/1£/90 Development Construction Permit, Page 2/5 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2 2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any — Z 0 n 0 N_ � N O m O 0 M 0 0 I ,1 r N � m 0 rn 0 d m 0 m � o a m m - O> ............ Qq p I, 3 N N F p G r ^ I O .- V N 0 n o a m E o 0 w o v z m rn m m m rn m m rn rn m rn rn m o 0 0 0 0 0 0 0 0 H m rn m m m rn rn m rn rn m rn rn m o 0 0 0 0 .o 0 0 0 - 'o N IN QI @ m m rn m o 0 0 o 0 0 0 o io Mo 0 0 0 0 0 0 0 to rn m rn o 0 0 rn rn '.rn m rn m 1'm_ rn m ''rn rn 0 �o 0 0 0 0 N y � b � I O I 1 � N 6 N 6 O � � a o o n U m m o w c m <n , U O m N in ''. N c� U in in a w c7 a a U a U U m m m N O_ N M V b t0 1� OJ Q� O N` V N (O r W Ol E O N N N N _U E-�o O O N O O O O a Q o v 0 N O O N N N M O m O O N O a � o n 7 a a x r F N O W � O N x a 3 a� a� 0 rh O N > w o E M a u � ' z 0 os I t0 m F � o � o N O O O N N N N C N O m m N i U � QN h T O C N O 6 E 0 m U O U T � N N O 'Um �� K�o City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 99-32 Issuance Date: I Project Name: Stanton Creek 2"d Filing (Phase 3) Project AX A.: Project Location: Southeast corner of Lemay Avenue and County Road 34. Phase 3 located east of Tortola Way and North of Barbuda Place Permittee: Richard J. Ray, James Company City and developer contacts: See attached Exhibit "A"for names and phone numbers o. contact persons for this project Fees: Permit Application Fee $ 300.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 8,980.00 Total $ 9,280.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 226,988.76 Form of security deposited with the City: Letter of Credit CITY FORT COLLINS ENG NEErNC C3o3; 10_,s-09 #1 EAJ' SUET11 #i2,,, cr!Ec!• 3on.. _ CHE : _2980& CH;aP!CE n.!k PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: iJ k K O ^' OxO.0 To - D mx,< mm 17 h] n *=o�y1-7 +O c m O I-'- H. *z m < H O G rt *!" n m rt N `G *�;, E ( ) no o o "*��0z0 O X (D Fh *P r —I O r t) h] *tom *o, y on N r-m(D O moo G Oro fi (n 0 rt tm 0- * mm� n * w C n � O y*- — m O Q (D r r * O rt H. * Z ] co �:5 O N * 0 J n * O ] N J N * V ] o cn * Z cn (D 10 * n co CD J CD * m * I-S m * H r �3' o m (D 7 (D � � G ° a am n ,n D ox Li = a E o oR g gD O ND to w * Iy * * In �N * a oq * * n o O a * * c w 0 o 0 o n W o m N rt O rt A En oo�v oD m2 j mm F— 1-1ro �T o; D ro n *oc h OC rt *m �mnm rr a l< *w D (1) - O w G n o n o * o r1 0 * oz n O oxmrn *gOmo r cn t) '_] Y:nLW *m > On N r-mm o o ITJ *moo m Om co w rt w (n O N acrt O m o n O (D r th - o �:l r ,a ' O �p Z OW co rt —0 O cn n x O o N N 0 J I O o co N Z ru cn (D N 0 O a (D o (D g �. O y m 1 r G O 0 r �o R � O ° � (D Ln 1O a ti D � X m H- m n am - x O> rt ox w m K zo w x 0 a 0 2 0 gR r uD O r vg in W * n * * m o* w * O a OD c o o o n W CD � N O rt W N C) Development Construction Permit, Page 3/5 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: « 2� �'` Date: e`? > Approval for issuance: City Engineer Approval: C 10-AV— Date: (Permit Issuance Date) Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Stanton Creek, Filing 2 - Phase 5 Project A.K.A.: City Staff Contact Persons: Development Engineer: Sheri L. Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 x7140 Construction Inspector: 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6605 x Cell (970) 222- L,�'j Z--1 Current Planner: Steve Olt 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6341 Water Utilities Engineer: Terry Farrill Fort Collins Loveland Water District and South Fort Collins Sanitation District 4700 s. College Ave, Fort Collins, Co 80525 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Development Construction Permit, Page 515 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970) 221-6361 Light and Power: Bruce Vogel 700 Wood Street, Fort Collins, Co 80521 (970) 224-6700 Developer' Contact Persons: Project Manager: Richard J. Ray, .Tames Company 2919 Valmont Rd, Suite 204 Boulder, Co 80301 (303) 443-6666 Fax (303) 443-6777 Cell (303) 931-3292 Developer/ Owner: James Postle, James Company 2919 Valmont Rd, Suite 204 Boulder, Co 80301 (303) 443-6666 Fax (303) 443-6777 Architect/Planner: Project Engineer: James Wright JR Engineering 2620 East Prospect Rd, Suite 190 Fort Collins, Co 80525 (970) 491-9888 Fax (970) 491-9984 General Contractor: James Postle, James Company 2919 Valmont Rd, Suite 204 Boulder, Co 80301 (303)443-6666 Fax (303) 443-6777 or All Other Contractors: O'.o 0 0 0 0; o �.o 0 0 00 0 0 0 0 O '.O C. O OBI IN 0 ;O O O lD O lD O N OHO O'O O O O l0 O I- (O I` O n C O ffi (A (A,I uj E£i EA . N m N N V In (O M W LA U N N N r 00 N O fA (A eq 0 O V C L � (0 O H I O O O O O O O O 0 0 0 0 0 0 0 N C !� O C (O (0 O O O O '' (O O (0 O O O�O M W O CO O M O O O N LL O�O EA (A M EA,(A M O O'' V3 fA to V) E9i(fl EA (A O M d N U C LL - O_ O O S O O O O O O 0 'O o In O m O'�0 m O O O O O O O LO 0 (� I- :O N O W 00 O O Oi6 O O''O '. (O I� CA N M . (D O O @ 7 U 61 (A'(fi V1 (A to V M O m w (U (A N O H O 00 O V V m V F M W w lL W m — U) a) _ O N O O O 0 �.f - 0 — O O O 0 O 00 fq DLO OIO o o 'O O (A O LO l0 M MHO N N OjM 0 W .� V O O O I M M 00 (O m� W O o LO (� EA' LIB O (A m fA (A fA N (A m CIDU 7 fH CO EA Ui Vi ` 0 v M » n l69 u WO1O 0 Ir OHO O'. I(O �'.O (D (O N LD O -O N iL N N V (D I(U E mcc Ili Q CY NI' ! 0 W w F CY I -.. —_,. uiQ) w N Nwww Niw F LL cTi LU W LU N N K Q C N I (L 2 �� a 0 z �. In LL o 3 nll 2 v w U) W U) Nil _ C C L N � W N U d UiN m, 0- U o _ � c U 08 m y� V% m z U. a@i!.i aNi !.j 0 '.� N Z L N-N O L N,: Ol ... U' Q U '.G C C O L L 4J O N lu fn f-U3: Q2w',, F- v U' QUU)=QU z La W U W o z CNO s _000 II J c 00 z _ oF ��m� W J w V) LL N Q = Q U rl Aw 0 .�_ azz ti 2rn F� w U U N � � W 500� wD�ccQ 96 112 m 110 109 108 107 114 113 95 BARBUDA DRIVE 94 93 92 a 3 a' 91 y v1 a z 90 69 STANTON CREEK DRIVE ��FIQRo—SVOyYlS\c6ui�o.p\LOYyl6[\Ilo�pppOl6C\ �% 3lid 'OO.YI 3rvu 'pp/ao/ep Grp 'os-I 31vJ5 101d 118 106 97 128 128 117 105 98 ne 104 99 W N = 2 a a 118 103 z z 100 J J FL O 120 702 101 U U W W U) fA n Q � � m U N N � U N O O � OLL N Q O _ > Q OZ U O vi y v 0 Oa a S 7 0 r1 N w O m W Q Icy ¢ 1 W � O m LL m o N r i a W o E w v W o 0 0 0 U az O o A FN ... . ...... ..... .. ......... ....... ......... ............... L O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Y N in h � N a r N M f0 Pl N N � N f0 y m C U I m � Y � m o> n O u n m a o i m E > ai - u a p n y o U c m 0 N m U = Q E m m m o au E a ci o d w a �, a a m nE V- o` 2 y rn C rn CO a. m J Y d � Y LL LL C 0 r ❑ m to (n N LL m Uc c m y0 R m O N t f d N tp p� d N N O� N d N fD O 0 E N N th th Pl th d y N � O v M a N d L U a rn ❑ � O 2 N r� rn N N O a` n U O O Ix w o� �Ty O {Si W � a� 3 � O F � N O y� !r ^ Y N N rl N d D1 z°' ... � l...... ................................................................................................................................................................................................................ 1 L O O O O O O O O O O O O O O O O O O O O O O O Z VI aD � N �O !p N t0 t0 O I� N t� N � 1� M N [•l I� O� O O O O O O O O O O O O O O O O O O p y � H N p d a` r (L d C O J 3 3 R' LL ti U) LL rn y y J J m c 0 `o ma E `m o VI d O O o 10 N IO W N mmo N J in N 3 r 0 N U U 0¢ C 00 - J � N O, a Y li LL h o H co im N 1 U) J (J f1 N N Q_ N 17 V N fp h N OI O N CI V N �D h CC W O N th O W E N N N N 1n