Loading...
HomeMy WebLinkAboutSTANTON CREEK - Filed CS-COMMENT SHEETS - 2005-07-14PROJECT COMMENT SHEET City of Fort Collins Current DATE: 24 November, 1997 DEPT: Engineering PROJECT: Stanton Creek, Final ENGINEER: Michael Coley Plat No Problems Problems or Concerns (see below or attached) 3C Many offsite utility and temporary construction (grading) easements are needed. 3C There are several easements on this plat that are outside the platted boundary. This is not allowed, please dedicate these by separate document. 3B The minimum allowable centerline radius for residential streets is 240'. This criteria has not been met on St. John PI. And Basseterre PI. Utility Plans Sheet 6: • Basseterre PI. must be constructed along the frontage of Lot 36. • Show all easements on overall utility plan. Sheet 21: N Minimum intersection approach grade (2%) is exceeded. Sheet 22 & 23: R I am concerned about the crown transition of both St. John and Basseterre at St. Thomas Dr. Will the southern gutter contain the flow approaching the intersection, or will the water sheet flow across the pavement? Sheet 24: 3C Minimum intersection approach grade (2%) is exceeded. Sheet 25: 3C Minimum intersection approach grade (2%) is exceeded. Date: I j/Z6/9 -7 Signature: PLEASE SEND COPIES OF MARKED REVISIONS: E2r PL ® SITE ® UTILITY LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current DATE: 9 October, 1997 DEPT: Engineering PROJECT: 431-83G Stanton Creek Final PLANNER: Steve Olt ENGINEER: Michael Coley No Problems Problems or Concerns (see below or attached) Title Sheet: X Some minor modifications to the General Notes are needed. Plat: X Need statement of maintenance (and ownership) of all tracts. • Show existing conservation easement. • Offsite easements will be needed for grading, drainage and utilities in various locations. • A portion of Basseterre PI. must have dedicated ROW in order to build on lot 36. Overall Utility Plan: X Several offsite easements are needed. Santitary Sewer Plan and Profile: X Inadequate waterline clearance in one location. Storm Sewer Plan and Profile: Water quality ponds are not shown on all appropriate sheets. Street Plan and Profile: X Show sidewalk culverts on street plans, show CL station at intersecting streets. 39 Show crosspans in profile, maximum intersection approach grade is 2.0%. X `K' values are low for several vertical curves, show spot elevations at intersections per standard drawing D-19. **See redline plans for additional comments** Date: 10 /cl /' 7 Signature: PLEASE SEND COPIES OF MARKED REVISIONS: 4LAT SITE UTILITY LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current DATE: 18 July, 1997 DEPT: Engineering PROJECT: #31-83F Stanton Creek - Type I PDP (LUC) PLANNER: Steve Olt ENGINEER: Michael Coley All comments must be received by: 7/30/97 No Problems Problems or Concerns (see below or attached) Title sheet: Need North arrow on vicinity map, need to describe project benchmarks, need sanitary sewer plan and profile sheets, signing/striping plans for connectors and collectors. Preliminary Plat: 1) 15' of non-exclusive utility easement is needed beyond the ROW. 2) 50' of 1/2 ROW is not adequate for an arterial. Dedicate 57.5'. 3) Most bearings and distances are obscured by utility lines. 4) Label and dimension all easements and Rights -Of -Way. 5) Need a statement of ownership/ maintenance of all tracts. 6) Need a statement of dedication of easements, ROW, tracts, and any site for public use. 7) Need to show bearings and distances for ROW lines, easements, and lot lines. 8) Is there a conflict between proposed development and Conservation Easement? 9) Off -site easements are needed for some storm drainage facilities and sanitary sewers. 10) Clearly indicate block boundaries. Comments continue on next sheet. Date: 7 Signature: !�> PLEASE SEND COPIES OF MARKED REVISIONS: 0 PLAT ,"' [I'- SITE El'UTILITY E]-LANDSCAPE Preliminary Overall Utility Plan: 1) Local street intersections with arterial streets shall be provided at least every 660'. 2) Trilby Road is a future bus route. Note location and escrow funds for future bus stop. 3) Overall utility plans need: a) Complete horizontal street alignment showing centerline, curve radii, street, sidewalk, and ROW dimensions, driveway locations, and crosspans. b) Existing and proposed storm drainage facilities. c) Detention ponds, ditches, and swales. d) Floodplains, floodways, and 100 year water surface elevation. 4) Need a pedestrian/bicycle access easement or an access easement for the proposed future bike path. 5) The `bulge' on Antigua Drive serves no apparent purpose and should be deleted. 6) Trilby Road shall be designed and improved in accordance with current City standards for an arterial street.. An approved design is on record as a component of the Paragon Point PUD. It is your responsibility to carry out the improvements on the South half of the road or provide the funds for the improvement to be carried out in the future. The City is not ready to construct this portion of Trilby, therefore escow funds for the future improvements. Also, see that your street connections at Trilby both are compatible with the existing conditions and will be compatible with the future improvements. 7) Label all existing and proposed waterline appurtenances. 8) Show location and elevation of reference BM. 9) Design St. Thomas Dr. as a connector w/ I F bike/park lanes (need 63' ROW). 10) Amalie Way west of Stanton Ck. Dr. should be designed as comment 9 above. Amalie Way east of Stanton Ck. Dr. proceeding along Redonda and St. John Pl. should be designed as a local residential street with a 51' ROW. 11) See comments specific to traffic circles on the redline plans. Preliminary Overall Grading Plan: 1) Some sidewalks seem to conflict with proposed grading (max. Cross -slope is 2" per T) 2) Some grade lines don't seem to be correct. 3) Must show floodplain boundary on grading plan. 4) Incorrent matchline sheet reference. 5) Some sidewalks / bike path connections are misplaced. Storm Sewer Plan and Profile: 1) Show all utilities crossing in profile and plan. 2) Riprap should be shown on these sheets. 3) North inlet of St. John Place line conflicts with access ramp. 4) Inlets of Stanton Creek Drive line should be located at flowline lowpoints. 5) Saint Thomas Drive is labeled as Stanton Creek Drive on sheet 12. Storm lines (such as the one mentioned in comment 4 above) are likewise mislabeled. 6) Part of the proposed development is missing in plan view on sheets 12 and 12A. 7) Offsite easements are needed in some locations. Street Plan and Profile: 1) All street plan and profile sheets need: a) ROW and roadway dimensions b) CL stations of all intersecting streets c) Flow arrows d) Curb, gutter, and walk e) Driveway positions and dimensions i) Curve data (stationing and elevation of horizontal PCs and PTs in plan view) g) Crosspans h) Spot elevations at intersections per standard drawings D-18 and D-19. i) CL stationing at 100' intervals j) Property, ROW lines, tracts, and easements clearly labeled. 2) Provide access ramps at all pedestrian crossings. 3) Lot numbers are inconsistant with plat. 4) Incorrect matchline sheet references. 5) Maximun grade break (of 0.4%) is exceeded in several locations. 6) Incorrect stationing on Saint Thomas Drive (sheet 15) 7) Show all flowlines accurately, not just around perimeter of each block, but also where flow crosses the street (at crosspans). 8) Low point on South flowline of Saint John Place does not coincide with proposed inlet. 9) Lot configuration is inconsistant with plat. 10) Grades at Eastern end of Saint John Place do not match those at the corresponding end of Redonda Drive. 11) It is not clear (on sheet 20) how the flowlines, lowpoints, and inlets will work at the traffic circle. Show sufficient detail (i.e. spot elevations, accurate flowlines) such that the drainage scheme is clear. 12) Acording to the TIS, a left turn lane is required at Amalie Way to S.B. Lemay. 13) The eyebrow at Redonda and Amalie is not needed, especially on a 36' street. t-V brand fax transmittal memo 76711 # of Pr Z lv / i+ 1/01-7 Co. e� P+_ C—ff g Phone # — (o(�c>S # 49t-95o4 Fax # ZZI 37� COMMENT SHEET City of Fort Collins Current Planning DATE: July 2, 1997 DEPT: Engineering Pvmt PROJECT: #31-83G Stanton Creek - Type I Final (LUC) PLANNER: Steve Olt All comments must be received no later than the staff review meeting: Wednesday, July 30, 1997 This Soils Report is only the preliminary report. A final report will need to be submitted as required. See comments that need to be addressed with final report. ❑ specifications to mandate thourough mixing and processing of all fill material generated on site so that uniform embankments are constructed. This also holds for areas where utility trenches would generate potentially expansive backfill, such as the Western portion of the site. ❑ water content may need to be specified higher, such as 0 to 4 percent over optimum to ensure embankments remain wet long enough to permit swelling to occur prior to construction of pavements and/or foundations. ❑ Additional drilling, sampling and testing is warranted after grading and utility work to fully define the problem. ❑ Some information on the geology, including a map showing the Pierre Shale would be very helpful in defining the problem as well. ❑ Mitigative measures need to be included in addition to the addition of water during construction. In summary, this is exactly the type of situation we were anticipating in developing the new soils standards. Now we know there is a potential problem and can require further analysis to avoid problems such as those becoming apparent at Paragon Pt. This is a situation where it will be very important to require the final soils investigation after the earthwork has been completed. Expansive soils exist under the entire site at relatively shallow depths (< 10 feet). And need to be adressed. i� -7 Date: Ma HERE LF YOU WISH TO RECIlVE COPIES OF REVISIONS Plat -Site _hW Rep -Utility _ Redline U# _Lands* City of Fort Collins i , IZ, PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: July 2, 1997 DEPT: Mapping PROJECT: #31-83G Stanton Creek - Type I Final (LUC) PLANNER: Steve Olt All comments must be received no later than the staff review meeting: Wednesday, July 30, 1997 D.K. ,Rt� _ Am NoT 5,j2a 1F" W15 CAa Con,QlwCr' CCWDOIVIIJIuM r✓Cm�ntTs C)+J A Svt3n'v1Sl�U J�s�Z C ,.-��a ri d vd ��'�e IkPU P L�DUN�A2� OF T�5 �i ATl TllzsS� )Yl��T !3� 01CgTQo bGC i., YY' �—,T-A— i Am ! iHu �jN 114 THs ✓� 1•T OF" /,}C+ti..J CITI, /S3QUIRt3'VnL` T— PC-6,4Ro1n7 IYIoNUVn�I.'T �ciCoRoS Date: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS '✓PW _ Sk — — Oler Il0 _ Redline U9V _ IandSW City of FortCollins