HomeMy WebLinkAboutSPRING CREEK CENTER PUD - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-07-13Transportation Services
I n�inccriln, Departn;ent
CitN of Dort Collin,
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: t' 1 -' r Issuance Date: I
Project Name: Spring Creek Center PUD (Phase 1)
Project A.K.A.:
Project Location: Southeast corner of Prospect Road and Timberline Road — specifically the
southwest corner of Spect Point and Prospect Road
Permittee: Gerald P Lec Sharp Point Properties LLC (303) 442-8687
City and developer contacts: See attached Exhibit A "for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($300.00) $ paid
Construction Inspection Fee (paid prior to issuance of this permit) $ 4,869.40
Excavation Permit in Row (paid prior to the issuance of this permit) $ 357.50
Total S 5,226.90
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$140354.74
Form of security deposited with the City: V
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and 'Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
1F1 � rlh l dhI A�cnur I'.( 1_ Rn� nF!1 I-n1 (A I I I I,,C O 80,,22-M80 • t970) 221-6605 • FAX (970) 221-6378
.c �cr,_ i.h ui-rol lin._i o.us
-71*>O:g ww
Z D w C D::�:Zi
=T=Wmmm�
;D-
�Z-{FTG-
O DOmm-O
m Z� Z C O D - Di
�
�mT Zfm 7.
m
"D
D
Z
A
N
W
X�cxul
X I
V
X^ L,
CO
n
;1l
c
C
m
m
O
m
D
�
<
�
�
n
n
n
Icn
�Dr
D�mDT
D9
mmmID
Xm-ig
MO-
�mv=DDaommZv'-mml
mimmm
m<m
mlxmlx
m(
mon
zmz��
0
221
Z
z
'
1
Gj�
>XMZ
ZzI��
n
Z
n
Imm�
n
'Zc
Dm
mmL
iZln
Oc
c-zx
zZzm
�
am
cn
n
mm
Amm
C
O
Kim
m
m
p
ccnOE<OOONAn*
z
T
X
z
m
mn
l
I
m
z�c
n
cc,
vc
mm
Cl)IZ
Dn�
m
n
O
m
c
�m
Dm
D
n-n-t-<cnDDDDDDTmDTDTm�"nmDZrO
tn
r-
mmmmmmrrmrmir
7r!r$IC
'
m-n
mmm
co
AIC
s
C
C
_CDOD0000
0CD
OD
D zr
EOI
A
V
fOA�
EOA<�
b
dONc9
f�NWArA�
dA�WlA9
(OfAA1O9Of1
O
ODOCON�O
M
O)
fA
V)
O
i�g
C
0TOONAO
t`DJ
CV
V+Cn
Cn
00000
OOO
O
W
OOOON
N
VO
WOV
Cn
OCT
I)00000
OO
OD
CT
fAOArzD
fWfCOAUA0n
ArEtO1n9)
fNf�ANArA
fWN
fVW
�Vf
69
fA
W
fs
03-N0
N
fA
f
A
V
fA
N
0QCAS
QCn
W
WD)
OCJA
O
CV
ACDO
V
08CD
WN
W
0OWD
-4W
ONO
CN7A
tDV
cnD
A
O
OCOCI
O
O
O(Vr
NO
OO
CAD
O
O0
V�
V
0
O
O
O
0IO
O
O
O
W
O
O
O
W
O
00C)CJi
O
ojA
I
C)
OV
O
OfNAAc
Om
CD
OCNnc
V
OfOA�r
TA
OCAT_y
OAf
OVEA�
CZ�J
W
CO
fA
fAA
ffAfAfA
ffO)
0
CO
foA
fcA
fA
Co000O0000
m
O
OCD
0I00
DC")
0EI
000000
ob)oc)ob
QO
nn
A
fA
fA fig
rV
CAA7)
fA
fA
NO
fA
G
fACCAD
fA! CA
CA)
W'O
D
OAN
fA
fA
m
NW
fA
c)NW
fA
VOO
fA fA
ffA
W
Dr
fA
T
m-i
O
CO
OaDODCb
a
N
mD
A
0
O
0
O
0
O C7
0
0
A
0
O
0
O
0
O O
0 0
O
0
O
0
N
0
N'0
0
Cl)
0
0
0
0
0
0
O
0
C)
O
dD
O
CD
O
r
4WADW
'how
ACCOUNT HOW
PAID
AMT.OF
CASH
2.
Engineering Department
281 North College Avenue - PO Box 580
Fort Collins, CO 80522-0580
(970)221-6605
FAX (970) 221-6378
PERMIT FOR EXCAVATION ON PUBLIC PROPERTY IN THE RIGHT-OF-WAY
Minimum of 5 Working Days Required for Approval.
Emergency Excavation Permits may be obtained next business day.
Applicant: Fill
Applicant Name: _
❑ Company:
Address:
City/State/Zip: _
❑ Sub -Contractor:
1-5
Phone: _
Phone: d '
Do both contractor and sub -contractor possess license & proper
endorsement to work in the Public Right -of -Way? Yes _ No
Is this a City project? _ Yes No
If so, Project Manager's Name:
Field Contact Name:
3.
Excavation Address: _
Scheduled Start Date: _
Temp. Patch Date: _
Excavation Type: Open Cut:
Excavation Size:
Width Length _
Total Sq. Ft. Pavement Removed:
Existing Surface Type: Asphalt: _
Gravel Soil
Purpose of Excavation:
4.1
Phone:
Final: _
Back Fill
Boring:
Sq. Ft. _ Depth
Concrete
Grass
Water Sewer
Gas Communications
Telephone Electric
Other
Applicant is responsible to notify the following departments:
❑ Utilities - 700 Wood St., 221-6700
For coordination of new utilities with existing utilities
❑ Traffic -625 Ninth St., 221-6630
For traffic control plan submittal and coordination of signalized
Intersections.
❑ Parks (if applicable) - 413 S. Bryan, 221-6660
For work in the park system
❑ Parking -210 E. Olive, 221-6617
For work downtown or at CSU
❑ Forestry - 413 S. Bryan, 221-6660
For trees, shrubs or other vegetation
Mark box next to department after notification.
faty Use
Permit #
Approval [late:
Expiration Date: 30 OAYS FROM
APPROVAL
Reviewed By.
Review Date:
Cf! Development Review Permit
Project Name.
j,
Fees:
Application Fee:
$ 25,0
Non -Refundable
Inspection Fee.
$
$45.00/1000 ft2
Pavement Impact Fee.
$ 1' '
Excavation It' x Cost/ ft2
1 to 100 $ 3,50
101 to 500 2.60
501 to 3,000 2.00
over 3,000 1.50
❑ impact Fee Tripled if
pavement is less than
5 years
Pavement Aga.
Sub -total
$ -:
Previous Payments
$
Total: Due:
$
Date Paid:
Cash - Check #.
Accountit
Field verification of excavation size:
Conditions:
Engineering Approval:
Date: . l
55. Applicant has read this permit and agrees to abide by the City of Fort Collins Standard Plans and Specifications and to any ordinances,
special conditions, restrictions, and regulations that may be imposed by the Department of Engineering.
.r,
Applicant's Signature: Date: ''
Notify the Engineering Inspection Recorder at 221-6609
48 hours prior to any construction in the public right -of way.
White - Engineering Yellow - Inspection Pink - Applicant Gold - Revenue
3. Construction time restrictions: N/
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the "as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
Lis defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: �c _Date:
Approvalforissuance:
City Engineer Approval:
(Permit Issuance Date)
Exhibit "A" page 3 of 3
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Spring Creek Center PUD (Phase 1)
Project A.K.A.:
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Wamhoff
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6750 x7140
Construction Inspector: Dave Burke
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6605
Cell (970) 218-1740
Current Planner: Steve Olt
281 N. College Avenue, Fort Collins, Co 80524
(970) 221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970) 221-6681
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, Co 80521
(970)224-6063
Natural Resources: Kim Kreimeyer
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6641
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970)224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, Co 80524
(970) 224-6140
Exhibit "A" page 4 of 3
Forestry: Tim Buchanan
281 N. College, Fort Collins, Co 80524
(970) 221-6361
Light and Power:
700 Wood Street, Fort Collins, Co 80521
(970)221-6700
Developer's Contact Persons:
Project Manager: Gerald P. Lee
Sharp Point Properties LLC
4875 Pearl E. Circle #300, Boulder, Co 80301
(303) 442-8687
Cell
Fax (303) 442-8757
Developer/Owner: Gerald P. Lee
Sharp Point Properties LLC
4875 Pearl E. Circle #300, Boulder, Co 80301
(303)442-8687
Cell
Fax (303) 442-8757
Project Engineer: Bud Curtis
Northern Engineering Services
420 S. Howes, Fort Collins, Co 80521
(970)221-4158
Cell (970)
Fax (970) 221-4159
General Contractor: Michael Blank
Rincon Development Inc.
4875 Pearl E. Circle #300, Boulder, Co 80301
(303)442-8687
Cell (303) 591-5913
Fax (303) 442-8757
Exhibit "A" page 5 of 3
Y � I �.
---- --___ � I
� _ 1, T 1�� l� ,1
zees=d 200:319HJ -10NA3d MMCOI Cd31 Wd9T:20 T002-22-ddW
TIMBERLINE
9
ch
3
CD CDCD(oO
0-00CD00oaa
m
N ti n
m� -moo o
p
CD
O f1D 0 M O �� CD N 7r
-�
CD
ni—
m
C
0
CD
O_T CD Q d�
N
CL
�
O
m
.o
I
SPECHT DR.
I
I
I
I
I
I
i
X
O
m
0
0 M�0�
4 �.. ma
wcnvm,��W�'m
oG).... cD ZNO-I
m2 �an�,z0
mom+ CD CD Z
1 6cm m p dO
ANC OZ
03 Imo
N o=rO
a vw Z: co
x Cz m�
0 Ns....� =r.
a C) � n
`i rno
Cl) pZ
�. �7
wco y
W
0
A
rr
i.id-=:= n1117.7-,.dH[
;a a er a mm! r-171i wZ r<0502
w�§2>7
=o�■—
\!)�(n /ƒ2§§/
rc
�0 E »E/ §2
`rn
z� q //E /7
n\ m r
§ .. CD§ r
2§�
)ƒ
\�
0
SPECHT OR
»raK)w 9
§/\\
§
■
CO(a%E
/)/
o
\}§
/
#C
CD
CL
N
.PAOb r&rM ne- -Z,A8 8ASF, MA#�-QtACS
?-NA�e _l.__a_._