HomeMy WebLinkAboutSOUTH GLEN PUD FIFTH - Filed CS-COMMENT SHEETS - 2005-07-08PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE:10-7-96
DEPT:
ENGINEERING
PROJECT:
South
Glen P.U.D. 5th
Filing
PLANNER: Steve Olt
All comments must be received by:
No Problems
Problems or Concerns (see below or attached)
I Please provide complete curve data for all curves on the Plat.
2 Restate "to be; replaced" easement language as shown on the Plat.
Date: '< Signature:,' � - / I- /
PLEASE SEND COPIES OF MARKED REVISIONS: 0 PLAT
[3 SITE
0 UTILITY
0 "LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 20, 1996 DEPT: Engineering - Ping
PROJECT: South Glen PUD, 5th Filing - Final
PLANNER: -'S4e ve- o (-I'
All comments must be received by: May 31, 1996
❑ No Problems
[Problems or Concerns (see below or attached)
• SITE PLAN
1. Show utility easements
• COVER SHT.
1. Per Roger Buffington of City Water/Wastewater Dept., this site will be served by
the City. Please correct General Note #1 and #12.
• PLAT
1. Please label, define and delineate the Tracts.
• UTILITY PLAN
1. Please show planned entrance configuration and a detail.
See other comments on the plans.
Date: 4, Signature:Z� �
CHECK IF YOU WISH TO RECEIVE a' PLAT
COPIES OF REVISIONS Q`SITE
COY LANDSCAPE
[a,. -UTILITY