June 23, 1992
Mr. Mike Herzig
City of Fort Collins Development Review Center
281 North College Avenue
P.O. Box 580
Fort Collins, Colorado 80522-0580
re: Speights P.U.D.
Cost Estimate for Street Oversizing
Project No: 9201.00
Dear Mike:
Northern Engineering has completed the cost estimate for the
oversizing of Timberline Road at the Speights P.U.D. per your
request. The street oversizing will cost approximately $2130. The
items considered are for construction of the three feet of extra
width sidewalk only. The additional street width is twelve feet
or less, therefore it is not considered oversize.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
f-7 Terry McEnany
420 S. Howes • Suite 106 • Fort Collins. Colorado 80521 • (303) 221-4158 • Fax (303) 221-4159
Cost �1,r,�c�-rE ; —TPM
T; 5,04ej,NE go4o OVg 5/zin1G
Ex�rw midf� 5rc/Cc✓G-�K 354,
Prep
z. Co.�✓e7� 15700
To-r7v
ry k e tQ ° z l 30 oo