Loading...
HomeMy WebLinkAboutSPEIGHTS PUD - Filed GC-GENERAL CORRESPONDENCE - 2005-07-08Northern Engineering Services, Inc. June 23, 1992 Mr. Mike Herzig City of Fort Collins Development Review Center 281 North College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 re: Speights P.U.D. Cost Estimate for Street Oversizing Project No: 9201.00 Dear Mike: Northern Engineering has completed the cost estimate for the oversizing of Timberline Road at the Speights P.U.D. per your request. The street oversizing will cost approximately $2130. The items considered are for construction of the three feet of extra width sidewalk only. The additional street width is twelve feet or less, therefore it is not considered oversize. Sincerely, NORTHERN ENGINEERING SERVICES, INC. f-7 Terry McEnany 420 S. Howes • Suite 106 • Fort Collins. Colorado 80521 • (303) 221-4158 • Fax (303) 221-4159 Cost �1,r,�c�-rE ; —TPM T; 5,04ej,NE go4o OVg 5/zin1G Ex�rw midf� 5rc/Cc✓G-�K 354, Prep z. Co.�✓e7� 15700 To-r7v ry k e tQ ° z l 30 oo