Loading...
HomeMy WebLinkAboutSILVER OAKS PUD - Filed GC-GENERAL CORRESPONDENCE - 2005-06-28Coma,_.tihv Plannin, and fi nkineering Departrnerd Rom City of Fort Cc�llin� November 10, 1993 Rick Armitstead Tri-Trend P.O. Box 40 Timnath, CO 80547 RE: Silver Oaks, 1st Filing Dear Mr. Armitstead: This letter is to inform you that the utilities to include sanitary sewer, water and storm sewer as well as 'the asphalt paving and sidewalks, curbs and gutters have been inspected and initially accepted by the City of Fort Collins pending the normal contractors warranty period. With the exception of Auntie Stone Street from the existing street where the new construction begins north approximately 200 lineal feet. Correction of street grades at this area will be necessary to comply with approved plans. Please be informed that this letter of acceptance does not relieve the developers, contractors, lot owners, or their contractors of their responsibilities for the repair of any damage which may occur as a result of the building construction. Sincerely, � Steve Biegler Engineering Construction Inspector '�I \.vtn. enuc I'll f{,.� cat; �., -t,., dhr- (t Home Federal Savings Bank Date: February 23, 1993 TO: City of Fort Collins Engineering Department Matt Baker 281 N. College Fort Collins, CO 80521 Gentlemen: Please find attached copy of the assignment of utility installation :reimbursements for subdivision improvements located at Silver Oaks P.U.D. First Filing as more fully described in legal description as attached. According to 'the terms and agreement by and between Tri-Trend, Inc., a Colorado Corporation "Borrower" and Home Federal Savings Bank, all future utility reimbursements are to be made to Home Federal Savings at its primary business offices: Home Federal Savings % Construction Loan Department 300 W. Oak P.O. Box 2182 Fort Collins, CO 80522 Please return a copy of this letter acknowledging the receipt of the assignment. I have enclosed a return envelope for your convenience. Thank you for your cooperation. Cordially, Joseph A. Zahn, Jr. Vice President Construction :Loan Manager Receipt,of Assignment acknowledged j Da e Fort Collins Loveland Estes Park JJ Nest O,r Co.l, t, rJ DrS'irce: Fm C"li r.: - C,.ii. C nio 3C571 �d(L5'.! ^ic