September 1, 1999
Mr. Dave Stringer
City of Fort Collins
Engineering Department
281 North College Avenue
Fort Collins, Colorado 80524
Re: St- Joseph School Addition
Dear Dave,
I am writing to verify the as -built conditions for the east building addition at St. Joseph School.
The main school addition is still under construction, It is my understanding that the school is
requesting a C.O. for the east building only. The entry elevations and slopes away from the
building were shot and information was forwarded to Jay Barber at Stormwater Utility. The
other item of interest was the 0-inch DIWM fire protection water line that was installed off of the
12-inch main in Laporte Avenue. The tap was made approximately 10 feet further east than
shown on the drawings. Valves are on the appropriate lines, the fire hydrant is in its designed
location, and the fire department connection vault is in place. A second check valve was
installed on the riser pipe for further frost protection.
Enclosed Is a schematic of the area and as -built locations of the water line area. This letter and
information only identifies above ground facilities and their locations. i hope this provides the
information you require at this time. If you have any questions, please feel tree to call.
Sincerely,
Owen Ayres & Associates, Inc.
Chris Carlson, P,E.
Civil Engineer
CC:sp
Enclosure
cc: Mark Lyons, Engineering Dept.
Roger Buffington, Water & Sewer Utilities
Owen Ayres & Associates, Inc.
Engineers/Scientists/Surveyors
3665 JFK Parkway, building 2, Suite 300, P,O. BOX 270460, Fort Collins, CO 80527 STRIN9LT.DOC
(970) 223-5556, Denver Metro (303) 572-1806, FAX (970) 223-5578 34-0776.00
Pdn.d on ,o,.IW W ,:r
ition Services
Engineering Department
City of Fort Collins
May 3, 1999
Ric Hattman
Hattman Assoc
145 W. Swallow
Fort Collins, CO
80525
Dear Ric:
For your information, attached is a copy of the staffs "Building Permit Review/Utility
Plan Review" comments concerning the proposed addition to Saint Joseph Parish at
300 West Mountain.
The plans submitted were reviewed by numerous City departments and other agencies.
The comments are offered by Staff to assist you in preparing final plans for building
permit issuance and utility plan approval.
Please return all redlined plans and 4 site plans, 4 landscape plans, and 3 sets of utility
plans for review. If you should have any questions regarding these comments or if you
need to meet to go over them please feel free to contact us.
Sincerely,
Sheri Wamhoff
Civil Engineer II
Attachments.
cc: file