HomeMy WebLinkAboutRIGDEN FARM FIFTH SETTLERS GREEN PDP - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-06-20City of Dort Cc] in
Transportation Services
Engineering l:)eparhncnz
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: _ 01-43 Issuance Date: /.. -7 0
Project Name: _ Rift Farm Fifth Filine — Tract I (Settler's Green)
Project A.K.A.:
Project Location: Northeast corner of Rigden Parkwav and Custer Drive
Permittee: Bob Hand, RND Development LLC
Go, and developer contacts: See attached Exhibit 'W' for names and phone numbers of all
contact persons far this project.
Fees: Permit Application Fee (paid at the time of application)
Construction Inspection Fee (paid prior to issuance of this permit)
Total
300.00
$ _ 7.518.80
7,818.80
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 1g2702.75
Form of security deposited with the City: Letter of Credit
PERFORMANCE REQUIREMENTS OF TIIIS PERMIT:
I . The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions
to the litility Plans and related documents. The Permittee shall have an Engineer represent, as
required by the CnN in the Development Agreement_ that the improvements are constructed in
contormance with the approved Utility Plans and the standards and specifications of the City. The
Permittee shall provice "as -constructed" plans prepared by an Engineer prior to the City's acceptance
of the constructed pudic improvements. (All references above to the terms "Project Engineer' and
"F.ngincei'" shall me�.n a Professional Engineer licensed in Colorado.)
?. All contractors who perform work on this protect must be bonded and licensed in conformance
tA ortli:�.�L. �,_ .•. rn,i v,. 1m „o °�•r C.�ilin;. ,td1.= JSs,fi. <r0)=.' ,6(1� I i�i J)12`1-',,.7;1
This letter of credit shall be subject to the Uniform Commercial Code as in effect in the
State of Colorado, and , to the extent not inconsistent with the terms of this Letter of
Credit and the Uniform Commercial code, the Uniform Customs and Practice for
Documentary Credits, 1993 revision. ICC publication number 500.
This Letter of Credit will be automatically extended without amendments for one year
from the present, and each future, expiration date thereof, unless Issuer delivers written
notice at least sixty (60) days prior to any such expiration date to the City of Fort Collins
of its intent not to renew this Letter of Credit. Any such notices shall be in writing and
shall be delivered with an acknowledged receipt, either in hand or by certified mail. Any
amendments to this Letter of Credit shall be made in the form of Exhibit 3 hereto.
The Citv may at any time request that the Bank amend this Letter of Credit by submitting
to the Bank a fully executed certificate in the form of Exhibit ?. The Bank shall
thereafter promptly issue an amendment to the Letter of Credit corresponding to the
change or chamres requested in such certificate.
This Letter of Credit is not transferable.
This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in
any way be modified, amended, amplified or limited by reference to any document,
instrument or a(_,reement referred to herein, except only the certificate and drafts)
referred to herein; and anv such reference shall not be deemed to incorporate herein by
reference anv document, instrument or agreement except for such certificate or draft(s).
Sincerely,
Catherine E Costlow
Assistant Vice President -Real Estate
First National Bank
STATE OF COLORADO)
�,,�. �N6i Y OF LARI:VtER)
�irbgC bed and sworn 2Q before me this day of.�d�e
assistant Vice President, First National Bank.
' ,
s my hand and official seal.
`Iotary Public
-My C:btii fission Exoires.
RND DEVELOPMENT. LLC
Robert T Hand
EXHIBIT I
CERTIFICATE
The City of Fort Collins hereby certifies as follows with respect to the certain
Irrevocable Letter of Credit No. dated
established in favor of the City of Fort Collins, Colorado (the "Letter of Credit"):
a) He(She) is authorized to execute this Certificate of behalf of the City of Fort
Collins:
(b) The applicant/ developer is in default under the terms of the development
Agreement and/or the development construction permit.
(c) The sum of S which is the amount of the draft presented with
This Certificate. is the amount currently due to the City of Fort Collins from
(d) The amount of the accompanying draft together with all previous draws
Under the Letter of Credit do not exceed in the aggregate $ and
(e) The Letter of Credit has not expired.
IN WITNESS WHEREOF. the undersigned has executed this Certificate of behalf
of the Citv of Fort Collins this day of
THE CITY OF FORT COLLINS, COLORADO
A Municipal Corporation
Title
STATE OF COLORADO)
COUNTY OF LARIMER)
Subscribed and sworn to before me this day of by
_ as authorized officer of the Citv of Fort Collins.
Colorado.
Witness my hand and official seal.
Notary Public
My Commission
EXHIBIT 2
Amendment to Letter of Credit Y
'The Citv of Fort Collins certifies that the person signing below is authorized to execute
this amendment on behalf of the City of Fort Collins, and further certifies with respect to
the provisions contained in the Development Construction Permit
dated and/or the Development Agreement dated
between the City of Fort Collins (Beneficiary) and
(Developer), the following:
(Check applicable boxes.)
The Letter of Credit is to be reduced to S
The maturity date is revised to be
The 60-day automatic one year renewal provision no longer applies.
Release Onainal Letter of Credit upon receipt of separate replacement
Maintenance Letter of Credit in the amount of
(current value).
Release Letter of Credit.
In witness whereof, the undersigned has executed this certificate on behalf of the Citv of
Fort Collins this day of
CITY OF FORT COLLINS. COLORADO
a Colorado municipal corporation
mzrri..sra+.r..rrrriir
Transportation Services
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: _ 01-43 Issuance Date: l /- -7 c /
Project Name: _ Rigden Farm Fifth Filing — Tract I (Settler's Green)
Project A.K.A.:
Project Location: Northeast corner of Rigden Parkway and Custer Drive
Permittee: Bob Hand, RND Development LLC
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 300.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 7,518.80
Total $ 7,818.80
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 149,702.75
Form of security deposited with the City: Letter of Credit
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions
to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as
required by the City in the Development Agreement, that the improvements are constructed in
conformance with the approved Utility Plans and the standards and specifications of the City. The
Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance
of the constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
Development Construction Permit, Page 2/6
with City requirements.
3. Construction time restrictions: N/A
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations
or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3 2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there
is no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the Ciry; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
Development Construction Permit, Page 3/6
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
OWN
Permittec's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature:%/v> �� 1� Date:
Approval for issuance:
City Engineer Approval: ��� Date:
(Per t Issuance Date)
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Name, address and numbers
Project Name:
Project A.K.A.:
Citv Staff Contact Persons:
Development Engineer: Marc Virata
281 North College Avenue
Fort Collins, CO 80524
970 221-6605
Construction Inspector: Lance Newlin
281 North College Avenue
Fort Collins, CO 80524
970 416-2011
Current Planner: Troy Jones
281 North College Avenue
Fort Collins, CO 80524
970 221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street
Fort Collins, CO 80521
970-6854
Erosion Control Inspector: Bob Zakely
700 Wood Street
Fort Collins, CO 80521
970 224-6063
Natural Resources: Doug Moore
281 North College Avenue
Fort Collins, CO 80524
970 224-6163
Development Construction Permit, Page 5/6
Traffic Operations: Eric Bracke
625 Ninth Street
Fort Collins, CO 80524
970 224-6062
Street closures: Syl Mireles
625 Ninth Street
Fort Collins, CO 80524
970 221-6815
Transportation Planning: Tom Reiff
215 North Mason
Fort Collins, CO 80524
970 416-2040
Forestry: Tim Buchanan
281 North College Avenue
Fort Collins, CO 80524
970 221-6361
Light and Power:
Developer' Contact Persons:
Project Manager/
Developer/Owner:
Architect/Planner:
Doug Martine
700 Wood Street
Fort Collins, CO 80521
Robert Hand
RND Development LLC
1901 Avery Court
Fort Collins, CO 80525
Office: 970 224-0575
Cell: 970 566-2174
Fax: 970 224-0575
Email: rhandfam@cs.com
Mikal S. Torgerson
MTA Architects, PC
211 Jefferson
Fort Collins, CO 80524
Office: 970 416-7431
Cell: 970 567-7431
Fax: 970 416-7435
Email: mikal@architex.com
Development Construction Permit, Page 6/6
Project Engineer: Dave Sneesby
Advances Professional Engineering, Inc.
212 W. Magnolia
Fort Collins, CO 80522
Office: 970 484-0533
General Contractor:
Fax: 970 484-5086
Email: dsneesby(c�advancedpe.com
Tim Coonce
Barnabas Team - CDC LLP
d.b.a Paragon Builders
3000 Pearl Street, Suite 210
Boulder, CO 80301
Office: 303 442-8453
Fax: 303 938-1703
•r�--�
II
2e i
Fso
CASH
AHT. i I I CHECK
anurace ORDER REdFORM e1800
®First
National
Bank
November? 2001
City of Fort Collins
300 LaPorte :avenue
For, Collins. Co 80521
Dear Sirs:
We herebv establish. at the request and for the account of RND Development. LLC in
vour luvor as heneficiarv. our Irrevocable Letter of Credit No.3126 in the amount of One
hundred Port%— Nine Thousand Seven Hundred Two and 73i 100 Dollars (1, 19,70?.7ti
(us more fully described below), effective immediately and expiring at the close of
bankin,, busitiCss on November ?.'_002. at our office at 1 �� E. Boardwalk Fort Collins.
Co 8'J 2 5.
This Letter of Credit is intended for the tlmdim, required for the TRACT I RIGDEN
FARM AKA: SETTLER'S GR"'N PROJECT Development Project(" Development
Project') fbr the assurance of the completion of the construe€ion and the maintenance and
repair of the public infrastructurc in connection with the aforesaid development project
and its associated dcyeiopment agreement and development construction permit. Funds
under this Lerte- of Credit are available to you for one or more drawines prior to the close
of business on November 2. '00=. against sight drafts in an aggregate cumulative amount
not to exceed `$1 J9 t Od.73. dated the date of presentment. ,drawn on our offic referred to
above. referrim_ thereon to the number of this Letter of Credit and accompanied by vour
written certificate signed by %ou and acknowledged as therein provided in the form of
Exhibit 1 hereto.
Presentation of such draft and certificate shall be made at our office referred to above.
Upon the earlier of 6') our hororinI, vour draft(s) totaling `$1 49.702.75 in the aggregate
presented on or before this Letter of Credit expires pursuant to the terms herein or (ii) the
surrender to us by you of this Later of Credit for cancellation. this Letter of Credit shall
automatically terminate.
[t is understood that the amount of this Letter of Credit muv be reduced as public
improvements arc constructed and accented by the City. As components of the
infrastn uctu c are satisfactoriiv completed in accordance �.vith approeed utility plans. the
valu: of the completed components man be established !Lom the Development
CIrutrucnon P.!-rniL rksheet for dcter-ninin-, USIS of intiasuucture construction and
inspection lees. whereupon the amount of :his letter of credit mtay be reduced oy the
vniue of the :omplcted componem(s). up(ln execution of a "Rcqucst for Amendment to
LCltcr of vin" iorni ii iaclie'd hereto as '"anblt
copy