Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS PUD SECOND REPLAT - Filed GC-GENERAL CORRESPONDENCE - 2005-06-17ARTIER E MARCH, IN AMSEY 0 MYATT NOSIEST W. BRANDES, IN RICHARD S. GAST LUCIA A_ LILEY J. BRADFORD MARCH LINDA 5. MILLER JEEEREV J. JOHNSON MATTHEW J DOUGLAS VIA HAND DELIVERY MAACII & MYATT, P.C. ATTORNEYS AND COUNSELORS AT LAW 110 EAST OAK STREET PORT COLLINS, COLORADO 80524-2880 197014B2-4322 TELECOPIER 19701 4B2-303B December 23, 1996 Sheri Wamhoff City of Fort Collins Engineering Department 281 North College Avenue Fort Collins, CO 80524 Re: Ridgewood Hills PUD Easements Dear Sheri: ARTHVR E. MARCH 909-19BI MAILING ADDRESS. P.O. BOX 469 FORT COLLINS, CO BOS22-0469 In accordance with instructions contained in Jim Allen- Morl.ey's letter of December 11, 1996 (copy enclosed) enclosed please find three original easements for signature by the City of Fort Collins in the referenced matter as follows: 1. Non -Exclusive Temporary Vehicle Turnaround Easements. 2. Non -Exclusive Temporary Grading and Drainage Easements. 3. Non -Exclusive Temporary Emergency Access Easement. Do not hesitate to contact me should you have any questions. Very truly yours, MARCH & MYATT, P.C. By: Frances R. Begley, Legal Assistant to Ramsey D. Myatt /f Enclosures PC: Dan Jensen :33D,NC Engineering Consultants A dmnon of The Sra Brown Group 209 South Meldrum Fort Collins, Colorado 80521 (970)482-5922 FAX (970) 482-6368 Denver (303) 458-5526 TO: Mr. Ramsey Myatt 110 East Oak St. Fort Collins, CO 80522 DATE: I December, 1996 PROJECT: Ridgewood Hills PUD 2nd Filing PROJECT NO: 014-054 We are Please find enclosed descriptions for temporary easem order to sign the mylars for the above named project - turnarounds and grading and drainage. There are 5 to together by a number in the upper r-ght hand corner of for signature by the City will be there by the early pat Water District signs them. J After these are completed and signed they need to be Collins Engineering Department. Letter of Transmittal its required by the City of Fort Collins in hose descriptions are for both temporary 1, the descriptions and exhibits are keyed ie documents. I anticipate that the rmiars of next week after die South Fort Collins to Sheri Wamhoff at the City of Fort If you have .any questions please speak to Richard Thorton who will be faciliting the signing of the mylars. Sincerely, RBD, Inc. J' Allen -Morley P.E. roject Engineer cc' Dan Jensen - d. Jensen Enterprises Inc. ARTHUR E MARCH, JR- RAMSEYD-MYATF ROBERT WV BRANDES, JH. RICHARD S. GA9T IAICIA A. I ILE' J. BRADFORD MARCH IIN1)A S. MILLER JEFFBEY J-JOHNSON MAFTHEW J. DOUG[AS VIA HAND DELIVERY MARCH & MYATT. P.C. ATTORNEYS AND COUNSELORS AT LAW 110 EAST OAK STREET FORT COLLINS, COLORADO 80524-2880 (920) 482-4322 TELECOPIER (970) 482-3038 January 23, 1997 Sheri wamhoff City of Fort Collins Engineering Department 281 North College Avenue Fort Collins, CO 80524 Re: Ridgewood Hills PUD Easements Dear Sheri: ARTHUR E MARCH 1908-1981 MAILING ADDRESS. P.O. BOX 469 FORT COLLINS, CO 80522 0469 In accordance with instructions contained in Jim Allen- Morley's letter of January 10, 1997 (copy enclosed) enclosed please find a Non -Exclusive Temporary Vehicle Turnaround Easement providing two separate easements to the City as requested in Mr. Morley's letter. Do not hesitate to contact me should you have any questions. Very truly yours, MARCH & MYATT, P.C. - By Ramsey D.)Myatt RDM/frb Enclosure PC: Dan Jensen 33DINC. Engineering Consultants A division of The Sear-Brmrn Group 209 South Meldrum Fort Collins, Colorado 80521 (970) 482-5922 FAX (970) 482-6368 Denver (303) 458-5526 TO: Mr. Ramsey Myatt 110 East Oak St. Fort Collins, CO 80522 DATE: January 10, 1997 PROJECT: Ridgewood Hills PUD 2nd Filing PROJECT NO: 014-054 We are transmittinf- herewith: Letter of Transmittal Please find enclosed descriptions for two more temporary easements required by the City of Fort Collins in or to sign the mylars for the above named project. These descriptions are for temporary turnarounds, at the end of Strasburg Drive and Woodrow Drive. There are 2 total, the descriptions and exhibits are keyed to by a letter in the upper right hand comer of the documents. The City is now in the process of reviewing and signing the mylars, so it would be good to complete these by early next week. After these are completed and signed they need to be delivered to Sheri Wamhofi at the City of Fort Collins Engineering Department. If you have any questions please call me. Sincerely, RBD, Inc. 7 Zen-- rrrf Allen -Morley P:E. Project Engineer cc: Dan Jensen - d. Jensen Enterprises Inc.