December 23, 1996
Sheri Wamhoff
City of Fort Collins Engineering Department
281 North College Avenue
Fort Collins, CO 80524
Re: Ridgewood Hills PUD Easements
Dear Sheri:
ARTHVR E. MARCH
909-19BI
MAILING ADDRESS.
P.O. BOX 469
FORT COLLINS, CO BOS22-0469
In accordance with instructions contained in Jim Allen-
Morl.ey's letter of December 11, 1996 (copy enclosed) enclosed
please find three original easements for signature by the City of
Fort Collins in the referenced matter as follows:
1. Non -Exclusive Temporary Vehicle
Turnaround Easements.
2. Non -Exclusive Temporary Grading and
Drainage Easements.
3. Non -Exclusive Temporary Emergency
Access Easement.
Do not hesitate to contact me should you have any questions.
Very truly yours,
MARCH & MYATT, P.C.
By:
Frances R. Begley, Legal Assistant
to Ramsey D. Myatt
/f
Enclosures
PC: Dan Jensen
:33D,NC
Engineering Consultants
A dmnon of The Sra Brown Group
209 South Meldrum
Fort Collins, Colorado 80521
(970)482-5922
FAX (970) 482-6368
Denver (303) 458-5526
TO: Mr. Ramsey Myatt
110 East Oak St.
Fort Collins, CO 80522
DATE: I December, 1996
PROJECT: Ridgewood Hills PUD 2nd Filing
PROJECT NO: 014-054
We are
Please find enclosed descriptions for temporary easem
order to sign the mylars for the above named project -
turnarounds and grading and drainage. There are 5 to
together by a number in the upper r-ght hand corner of
for signature by the City will be there by the early pat
Water District signs them. J
After these are completed and signed they need to be
Collins Engineering Department.
Letter of Transmittal
its required by the City of Fort Collins in
hose descriptions are for both temporary
1, the descriptions and exhibits are keyed
ie documents. I anticipate that the rmiars
of next week after die South Fort Collins
to Sheri Wamhoff at the City of Fort
If you have .any questions please speak to Richard Thorton who will be faciliting the signing of the
mylars.
Sincerely,
RBD, Inc.
J' Allen -Morley P.E.
roject Engineer
cc' Dan Jensen - d. Jensen Enterprises Inc.
ARTHUR E MARCH, JR-
RAMSEYD-MYATF
ROBERT WV BRANDES, JH.
RICHARD S. GA9T
IAICIA A. I ILE'
J. BRADFORD MARCH
IIN1)A S. MILLER
JEFFBEY J-JOHNSON
MAFTHEW J. DOUG[AS
VIA HAND DELIVERY
MARCH & MYATT. P.C.
ATTORNEYS AND COUNSELORS AT LAW
110 EAST OAK STREET
FORT COLLINS, COLORADO 80524-2880
(920) 482-4322
TELECOPIER (970) 482-3038
January 23, 1997
Sheri wamhoff
City of Fort Collins Engineering Department
281 North College Avenue
Fort Collins, CO 80524
Re: Ridgewood Hills PUD Easements
Dear Sheri:
ARTHUR E MARCH
1908-1981
MAILING ADDRESS.
P.O. BOX 469
FORT COLLINS, CO 80522 0469
In accordance with instructions contained in Jim Allen-
Morley's letter of January 10, 1997 (copy enclosed) enclosed please
find a Non -Exclusive Temporary Vehicle Turnaround Easement
providing two separate easements to the City as requested in Mr.
Morley's letter.
Do not hesitate to contact me should you have any questions.
Very truly yours,
MARCH & MYATT, P.C. -
By
Ramsey D.)Myatt
RDM/frb
Enclosure
PC: Dan Jensen
33DINC.
Engineering Consultants
A division of The Sear-Brmrn Group
209 South Meldrum
Fort Collins, Colorado 80521
(970) 482-5922
FAX (970) 482-6368
Denver (303) 458-5526
TO: Mr. Ramsey Myatt
110 East Oak St.
Fort Collins, CO 80522
DATE: January 10, 1997
PROJECT: Ridgewood Hills PUD 2nd Filing
PROJECT NO: 014-054
We are transmittinf- herewith:
Letter of Transmittal
Please find enclosed descriptions for two more temporary easements required by the City of Fort
Collins in or to sign the mylars for the above named project. These descriptions are for temporary
turnarounds, at the end of Strasburg Drive and Woodrow Drive. There are 2 total, the descriptions
and exhibits are keyed to by a letter in the upper right hand comer of the documents. The City
is now in the process of reviewing and signing the mylars, so it would be good to complete these by
early next week.
After these are completed and signed they need to be delivered to Sheri Wamhofi at the City of Fort
Collins Engineering Department.
If you have any questions please call me.