Loading...
HomeMy WebLinkAboutREGISTRY RIDGE PUD - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-06-16City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: ifl' ')q Issuance Date: ' =/ -t) `7`l Project Name: Registry Ridge PUD 1" Filing - Off -site sewer, Trilby Road (on -site and off - site), Shields Street (on -site), and Phase 1 Project A.K.A.: Project Location: South West comer of Shields Street and Trilbv Road Permittee: City and developer contacts: See attached Exhibit "A"for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee ($ 300.00) $ paid Construction. Inspection Fee (paid prior to issuance of this permit) $ 74,104.10 Total $ 74,104.10 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 2,237,394.01 Form of security deposited with the City: L&y" C Y •'LeCI :.k' PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: AN CCNNE'1 RESOURCES, INC 4305 EAST HARMONY RD. FT. COLLINS, CO. 30525 BID PRCPCSAL ' U77LMES AA CHMEVT A ' PROJECT NAME: REGISTRY RIDGE F"Ii .ING I O\W, E:Z/CEVF?APER : U. S. HOMES B ID DATE: i' 418199 PRCPOSAL PREPAR.= BY: DAVID SLV(PSCN BID 310 SID ITN CESCRIPTICN QUANTITY UNIT UNIT PR/Cc- TOTAL SANITARY SEWER (ON -SITE; Io"PVC 309 LF .5..0 31712.30 3" PVC 7685 U =.35 1" SERVICE 145 EA 670.00 97,150.00 6"=VICE 260 LF 16.00 4,160.00 6" CLEAN-= I EA 46.00 46.00 . CI.1,'�fE: cI2 `."NHCLE iJ EA t. 430.00 1 sszo.ou DRCP.,L'I HCLE EA =100.00 6,300.00 ADJUS. :.(ANf?CL.PS :3 EA =a4.00 9.70000 TOTAL. SAl\IrrARY SEWER S53,. am Ll F—V--CN m v rs ua uu rr n�ort amc w.mm r imm FLING 1 PHAW 2 FLING ,e.1v .rorc 1 amor i C mom, IOIVMIIr NYIi. Wa.YO MY L'aDOR - ]a RK Q13104 � mwl FLING ' s r �r om a r" ." ass RNE 1 1. mam um FLNO 1 I j FLING 2 �. .o iwaart A t rmd SIN fo RM I�R J ` O YIDYIYM YY ]Y VLiL Omar FLING `C 4�� IYIf � IOMIM aWYi 4fIOR - lII-ul Wit I I �IN 11 m S R N o 0 p C r O � V (�DmOC7vG)tn KD�C)-i z7 (n v m X m_ m v v m . OCA m = cc o n p 3 0 N mD m s ^.m a to w <^�� acl) w m O`D mac, (n ; Om J ac7� m vm j �, m. cn cn = of �_ J m 4 C) m O 0 T O x m 3 a CD O= U) 3 -i m y r c� a n= m = w n CO - ;o o Q D p m o O m C) � � 3 O N Z O (n(n jr r Cnr rDD DDDD DrrrD DD C)0rr N ;o TTC)TT{m Cn C) C7 C) C) 000 TTT...� C)C){-<.7 EnU) � mz = =i==LL== m 1= �.,C) (n m z m vm m z�O' D� oA' zK Z T- i D in -{ m r 0 0 0 0 CDm o 0 0 O o o o m o o � o � 0 0 0 0 0 o v o r o 0 0 W W Z m v 0' 00 Om O O m z z (7! m -1 N n mv CA N m M O N to C':A rC m m N � C 0 m z ;n cn E»�, v+cA e»v3 cNn E»va <n En omi to <n�<n w <n yr e»E»tnw 2 0 0 0 0 0 A 0 c o 0 0 0 A o 0 o o m o 0 0 0 0 0 Z.� O 000 0CD Oro 0 0 0 0 0 o m m' th A > D D r n n4 En < m m T 1 En iWi c�ii mto to rnv+ 0 0 0 0 0 A 0 �En en cnw �Fn viv <n om Q 0 0 0 0 0 0 0 0 0( <»<n e»wtn es 0 0 0 0 0 0 C v. 0000000 o 0 0 0 0 0 0 0)o0000000oin 0 0 0 o 0 o 0 0 0 0 0 o00000 0 0 0 0 0 0 m Oq n - m < my m z =_ < m..0 rl —4 cn m cn cn cn cn rnm(n cn cn to cn cn cn(nmm LmCq Ep T T T T T T T T T r ZZZZ_�oz 0C)0C-)C7 C) Z ➢DDD:>oD (n cn m N m m (n (n (n m Cn 00000000000 Cn Cn Cl) Cl) cn Cn OOOC700 mZ-a 0 m 0 m m m C) z z c v m O n N f» N A 0 0 0 0 C7 A O 0 0 0 0 0 0 0 0 0 0 0 000000 O O O O O O O O 00000000000 00 0 0 0 0 O 0 0 0 0 0 0 0 0000000000 0 0 0 0 0 0 0 CITY FORT City of Fort Collins, Colorado COLLINS DEVELOPMENT CONSTRUCTION PERMIT ENUNEMINc uE'ART"ENT 281 NORTH COULEE Permit Number: 0A Issuance Date: `j% f303) 221-5_-05 Project Name: Registry Ridge PUD 1" Filing - Off -site sewer, Trilby Road (on site a r"" .1'C_......'" site), Shields Street (on -site), and Phase 1 euET 7rt'a .,- Project A.K_A.:1<<g,p . Project Location: South West comer of Shields Street and Trilby Road TC AI 4204.10 _ CHECK; 7° iN, iC ,a,•,NCE o.C: Permittee: Gre zSeeb//o//hµµm, Eagle Construction Services Inc �Double //// City and developer contacts: See attached Exhibit "A"for names and phone numbers of contact persons for this project. all Fees: Permit Application Fee ($ 300.00) $ paid Construction Inspection Fee (paid prior to issuance of this permit) 1 74,104.10 Total $ 74,104.10 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 2,237,894.01 Form of security deposited with the City: L&C 0 & eZ { PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: Ln M N v n O m m - y m { z r n 00 O n 3 m r O m ^ r z 0 z r A Om mzn no 9 r < z r m m - zMz new omz z 0 N i 0 'P ►�I u `1 m D =^ V = TT � 0 o n = C m a m -c g o° Y z 0 a Z -i A y 0 -i Z m 0 zn� Z O0 ul to ^r2 T rm C mz0 C z Ayb N m Ci r • T i v s 0 ;u b b z e v rn wa 0 o Z 0 C7 0 r rl W fn z (o 0 w m -O A > c 00 -O A z o o � BOX 2863, HOUSTON, TEXAS 77252-286 (713) 599-2575 OCTOBER 15, 1999 BENEFICIARY: CITY OF FORT COLLINS 300 LAPORTE AVE. FORT COLLINS, CO 80521 RE IRREVOCABLE CLEAN LETTER OF CREDIT 4 FGAC-99257 GENTLEMEN: WE HEREBY ESTABLISH, AT THE REQUEST AND FOR THE ACCOUNT OF U.S. HOME CORPORATION, 10707 CLAY ROAD, HOUSTON, TX 77041, IN YOUR FAVOR AS BENEFICIARY, OUR IRREVOCABLE LETTER OF CREDIT NO 99257, IN THE AMOUNT OF TWO MILLION TWO HUNDRED THIRTY SEVEN THOUSAND EIGHT HUNDRED NINETY FOUR AND 01/100 US. DOLLARS ($2,237,894 01) (AS MORE FULLY DESCRIBED BELOW), EFFECTIVE .IMMEDIATELY AND EXPIRING AT THE CLOSE OF BUSINESS ON SEPTEMBER 30, 2000, AT OUR OFFICE AT 10707 CLAY ROAD, HOUSTON, TX 77041. THIS LETTER OF CREDIT IS INTENDED FOR THE REGISTRY RIDGE P.U.D., IlT FILING, (PHASE 1) DEVELOPMENT PROJECT FOR THE ASSLRANCE OF THE COMPLETION OF THE CONSTRUCTION AND THE MAINTENANCE AND REPAIR OF THE PUBLIC INFRASTRUCTURE IN CONNECTION WITH THE AFORESAID DEVELOPMENT PROJECT AND ITS ASSOCIATED DEVELOPMENT AGREEMENT AND DEVELOPMENT CONSTRUCTION PERMIT. FUNDS UNDER THIS LETTER OF CREDIT ARE AVAILABLE TO YOU FOR ONE OR MORE DRAWINGS PRIOR TO THE CLOSE OF BUSINESS ON SEPTEMBER 30, 2000, AGAINST SIGHT DRAFTS IN AN AGGREGATE CUMULATIVE AMOUNT NOT TO EXCEED $2,237,894 01, DATED THE DATE OF PRESENTMENT, DRAWN ON OUR OFFICE REFERRED TO ABOVE, REFERRING THEREON TO THE NUMBER OF THIS LETTER OF CREDIT AND ACCOMPANIED BY YOUR WRITTEN CERTIFICATE SIGNED BY YOU AND ACKNOWLEDGED AS THEREIN PROVIDED IN THE FORM OF EXHIBIT I HERETO. PRESENTATION OF SUCH DRAFT AND CERTIFICATE SHALL BE MADE AT OUR OFFICE REFERRED TO ABOVE. UPON THE EARLIER OF (I) OUR HONORING YOUR DRAFT(S) TOTALING $2,237,894.01 IN THE AGGREGATE PRESENTED ON OR BEFORE THIS LETTER OF CREDIT EXPIRES PURSUANT TO THE TERMS HEREIN OR (II) THE SURRENDER TO US BY YOU OF THIS LETTER OF CREDIT FOR CANCELLATION, THIS LETTER OF CREDIT SHALL AUTOMATICALLY TERMINATE. IT IS UNDERSTOOD THAT THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED AS PUBLIC IMPROVEMENTS ARE CONSTRUCTED AND ACCEPTED BY THE CITY. AS COMPONENTS OF THE INFRASTRUCTURE ARE SATISFACTORILY COMPLETED IN ACCORDANCE WITH APPROVED UTILITY PLANS, THE VALUE OF THE COMPLETED COMPONENTS MAY BE ESTABLISHED FROM THE DEVELOPMENT CONSTRUCTION PERMIT WORKSHEET FOR DETERMINING COSTS OF INFRASTRUCTURE CONSTRUCTION AND INSPECTION FEES, WHEREUPON THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED BY THE VALUE OF THE COMPLETED COMPONENT(S), UPON EXECUTION OF AN AMENDMENT TO LETTER OF CREDIT Lti THE FORM ATTACHED HERETO AS EXHIBIT 2, THIS LETTER OF CREDIT SHALL BE SUBJECT TO THE UNIFORM COMLMERCIAL CODE AS IN EFFECT IN THE STATE OF COLORADO, AND, TO THE EXTENT NOT INCONSISTENT WITH THE TERMS OF THIS LETTER OF CREDIT AND THE UNIFORM COMMERCIAL CODE, THE UNIFORM CUSTOMS AND PRACTICE FOR DOCLMENTARY CREDITS, 1993 REVISION, ICC PUBLICATION NUMBER 500. THIS LETTER OF CREDIT WILL BE AUTOMATICALLY EXTENDED WITHOUT AMENDNIENTS FOR ONE YEAR FROM THE PRESENT, AND EACH FUTURE, EXPIRATION DATE THEREOF, UNLESS Ze? *� 9 9-37 ISSUER DELIVERS WRITTEN NOTICE AT LEAST SIXTY (60) DAYS PRIOR TO ANY SUCH EXPIRATION DATE TO THE CITY OF FORT COLLINS OF ITS INTENT NOT TO RENEW THIS LETTER OF CREDIT. ANY SUCH NOTICE SHALL BE IN WRITING AND SHALL BE DELIVERED WITH AN ACKNOWLEDGED RECEIPT, EITHER IN HAND OR BY CERTIFIED MAIL. ANY AMENDMENTS TO THIS LETTER OF CREDIT SHALL BE MADE IN THE FORM OF EXHIBIT 2 HERETO. THIS LETTER OF CREDIT IS NOT TRANSFERABLE. THIS LETTER OF CREDIT SETS FORTH IN FULL OUR UNDERTAKING, AND SUCH UNDERTAKING SHALL NOT IN ANY WAY BE MODIFIED, AMENDED, AMPLIFIED OR LIMITED BY REFERENCE TO ANY DOCUMENT, INSTRUMENT OR AGREEMENT REFERRED TO HEREIN, EXCEPT ONLY THE CERTIFICATE AND DRAFT(S) REFERRED TO HEREIN, AND ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE HEREIN BY REFERENCE ANY DOCUMENT, INSTRUMENT OR AGREEMENT EXCEPT FOR SUCH CERTIFICATE AND DRAFTS(S). VERY TRULY YOURS, G�J c WILLIAM D. GUNTRUM VICE PRESIDENT, ISSUER STATE OF COLE)PAD& ) La2�s ) SS. COUNTY OF LARIM R ) SUSCRIBED AND SWORN TO BEFORE ME THIS l 5 t DAY OF (-`c E Ck� \� By AUTHORIZED OFFICER OF W1T�SS.Art3t ,SEAL. eDONNA MONPOENotary Public, Stale of TeaasCommission Enires 03-26-2003 »»»»»»» » ...... »• NOTARY PUBLIC MY COMMISSION EXPIRES. CERTIFICATE The City of Fort Collins hereby certifies as follows with respect to the certain Irrevocable Letter of Credit No. dated established in favor of the City of Fort Collins, Colorado (the Letter of Credit): (a) He (She) is authorized to execute this Certificate of behalf of the City of Fort Collins, (b) The applicant/developer is in default under the terms of the development agreement and/or the development construction permit. (c) The sum of I which is the amount of the draft presented with this Certificate, is the amount currently due to the City of Fort Collins from (d) The amount of the accompanying draft together with all previous draws under the Letter of Credit do not exceed in the aggregate $ ; and (e) The Letter of Credit has not expired. IN WITNESS WHEREOF, the undersigned has executed this Certificate of behalf of the City of Fort Collins this day of THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation M STATE OF COLORADO ) ss. COUNTY OF LARIMER ) [Title] Subscribed and sworn to before me this day of by as authorized officer of the City of Fort Collins, Colorado. Witness my hand and official seal. Notary Public My Commission Expires: EXHIBIT 2 Amendment to Letter of Credit The City of Fort Collins certifies that the person signing below is authorized to execute this amendment on behalf of the City of Fort Collins, and further certifies with respect to the provisions contained in the Development Construction Permit dated and/or the Development Agreement dated between the City of Fort Collins (Beneficiary) and (Developer), the following: [Check applicable boxes.] 9 The Letter of Credit is to be reduced to $ 9 The maturity date is revised to be 9 The 60-day automatic one year renewal provision on longer applies. In witness whereof, the undersigned has executed this certificate on behalf of the City of Fort Collins this day of M. Attest: City Clerk STATE OF COLORADO ) ) ss. COUNTY OF LARINIER ) CITY OF FORT COLLINS, COLORADO a Colorado municipal corporation (Name and Title) Subscribed and sworn to before me this day of I by as authorized officer of the City of Fort Collins, Colorado. Witness my hand and official sea]. Notary Public My Commission Expires: 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If constriction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, Whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancies will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans and the ,'as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2 2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. No work (including grading) shall be started in State Highway right-of-way until a permit is 2 01 6ZS'OOSS a3As3s a NL1 rds 7- 0f 00'00Z- 0o"o0Z, S'l 1 101:LNOD DlddF'L 00000'I1 o0"0;;'I Z)V OZ DNI333s 00'089 00"i AS 089 a:Zl/m DKIEDLFd::21F'8OA'e3 00'r8S'L OS'C l.s 089 11b'3dSTY aA0;^:El: 00'ICS 00"11Z F'3 : 31=2rcR 31OH7vV3N 00"996'S 06"i d1 Or1Z 3DN3d_1Is 00'000't: 00'000't, 31 I SS3ODF' 3Sls 00'OSYI 00"DSZ'I VE I 31Od h=vOd Q1OH 0o'09L'1 007 d1 089 3DN_ 3Db'1d321 'S 3AO14-.-d 00"009Z 0:0 is 000ZI 1IOSdO13DF'ida�'-3ADIk32I 00'88L'r 09'; is ;;S dF'2id12I 81 M 00'00Z'S ; i't Is OOOZ dF'2iM ZI 7) 09'OZ6'OZ D67 dS rIZL d`.tidi219":D 00'000'91 00"000'S1 SZ 1 ON30'VOd sstldlE 00'000'r 00'OOt F'3 OI S=7OHN'F91 ONr? s::33AON,� 00'06Z'TZ DC i1 00 33A`3S DN -T sl" aAOIF32I 00'002"0L 00'19C _ I OOZ L=-= S ==S) 3210E .0Z 00 089 ;� 00'"C 31 OZZ 3210E _rZ 00"006'6 00";91 1109 DfIlsyD _r: 00"090'S 00"OCO'r F3 Z -PVMQP$I 00'OSL Z 00'1169 Y3 r -IPN d3� :D A` -:) 00'01r . 0o'OZr — F3 l :itlk, ddO-_1D Do"oot'r 00"0or'r V31 611:D Z)NOD.9 00'08C'I 00*0251 YU I ONI?SD3 O__-.I 00000'O I 00'005 -� Y3 r = 10_-3KV'11 dO2iC 2i=IFTQ .r 00"OZ6'6r 00"09;'1 V3 Zi 3103NF'N ZF=j%,jc.r 00'09;'rl 0r"9Z d'1 ODr OAd.9 0 C8--LOI 0i"8C d7 IOBZ DAd-01 o:iEZ'L6 Oi"8C d1:;;Z DAE _Zl 00'0-06961 09"6C a- D;6r :)Ad .;I r tS COI ERAUS.(NV_LINVE pxxix)3y IJAH /� � e�vts3 tsav r�osiniaa�e ls� mew r py 2 �r ....:.a '7 yo i 213M3g 3.09 4?o d �� \ � ! k # { / / \. ) , /| 7 e ) | _ m � `\ j / ) # * \| / !■ } m■ k A k 0. -- --- - mm!\}m,mmm„ as _ f \ mƒ k ) # \ \ 3 3 S Citv of Fort Collins Transportation Services lin.�gineenog Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: i ; Issuance Date: 5/I L / oe Project Name: Registry ridge PUD, 1" Filing (Phase 2) Project A.R.A.: Project Location: Southeast corner of Shields Street and Trilby Road Permittee: Gregg Seebohm, Double Eagle Construction Services Inc City and developer contacts: See attached Exhibit A' for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee ($300.00) $ paid Construction Inspection Fee (paid prior to issuance of this permit) $ 25,572.00 Total $ 25,572.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 401,228.00 Form of security deposited with the City: 5 c PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all P design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 'NI Anrih ( nllc,>c Acome • t'O, Iiox Stio • Fort Collins, CO 80522-0I;8(1 • (970) 221-0605 • FAX (970) 221-6'�78 ��-�r %%. ci. (n rt-col l i n>.co.0 s 3. Construction time 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: �" I" Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property. as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's SignaEure: Date: 5 i5 16,9 Approval for issuance. City Engineer Approval: M (Permit Issuance Date) EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Registry Ridge PUD, I" Filing (Phase 2) Project A.K.A.: Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 x7140 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) 217-8899 Current Planner: Ted Shepard 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970) 221-6854 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6815 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Exhibit "A" page 1 of 3 Forestry: Light and Power: Developer' Contact Persons: Project Manager: Developer/Owner: Project Engineer: General Contractor: or All Other Contractors: Concrete/ Flatwork: Landscape: Other: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970)221-6361 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Gregg Seebohm Double Eagle Construction Services, Inc 400 E. Horsetooth Road, suite 300 Fort Collins, Co 80525 (970)223-3500 cell (970) 227-7775 fax (970)206-1134 dbleaconstgaol.com Ed Zebrowski Dalco Land, LLC 6000 S. Greenwood Plaza, Suite 200 Englewood, Co 80111 (303)779-6100 cell (303) 517-9982 Fax (303) 221-1436 Zebrowskkushome.com Bud Curtis, Northern Engineering 420 S. Howes, suite 202 Fort Collins, Co 80521 (970)221-4158 Fax (970) 221-4159 Exhibit "A" page 2 of 3 FLING 1 FHASE i I I JI I it I. FLNQ 1 mM 6fCf1C FLING 1 1�MEN��sa J oil�rr� FLNO i \ .n ssua coo ro.rawm nwrwsau FLING 4 wawn vivn. � .o I I aww.x aoort � � .a mo,ca .ml m < vrum rm ao rua w I � �i II issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: This permit does not cover the inspection fees or include the infrastructure costs for Shield Street Improvements north of Trilby within the security provided A separate permit for that work is required Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the iproperty which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signatttr�j`�\��� 1tr�� Date: Approval for issuance: A City Engineer Approval ( }� ��_ t v Date: (Permit Is uan& —�- Date) It d a ' N N ' U Z 'I N a7 r j O rn a m w W 7 Y 3 w r 7 � Q w w m T � I y W U : Z u Q. ly o GI N O J Y d' 3 w Z y K Q W u s � w 1 _.. _- O O O I O O O O I O L H O N O N I O O O N N ID O O It] O ! N C N O O N N N N LL m In Ip cp P D N N m O O O O O O O O O O O O O O Q O O O O O O O O O Y y O O O O IV M N O O O OO I O O N In O O O C O O O j 0 N W y ! Q a w y a m a ff w a 3 Z LL O i� W coin a ro W 3 IL W (� Y y Z O Z a = H � W jy�j Z Q M K M K W y y W I .> m ',, 1 U U m W Q 0 m C a` _ —_i 0 0 0 0 0 0 (D O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '} N N 7 M p `- W 0 0 0 0 O (D EA N3 Ln EA O O I-� O O O O O O O Vi V3 O H3 EA d3 V3 EA V3 V3 O (fJ c0 m r to p EA (D N COcow p n w v (o LO O x Z O N bL J U Z J U W ~W 0 m OZLL 0 (OD (OD O O O O O O O O Cl O O O U) 0 >> U) > > Q O OM OM 00 O O _ J } O O M M O O Uj to 69 EA U O U> U J> U U U U Z EA EA EA H3 EA tF} O = W U LL L U LL LL LL fn u F K ❑ W ❑ Z U w j= R: I w W a0E- CL R} J U W W W W <L m W W LL > Z - LL 0 0 0 0 0 0 0 0o0000 0 000g�ooboo Z p IL w orn.-0000 F -� p g H M EA Hj F9 N H3 O 69 m O to M O (D V3 F9 (D N a7 r O W — W U M M M N V QJ (0 M. N O of m O W N d ❑ W wto co O N W co N .- N 0 ������ 1� m Ln N ��� Z Q H F- J N J Q to LL H LL f n F 0 W 0 WZO p - H w w m00000 orno Do o�ovo nv ornoDo O Z V fH EA EA O fA M N EA (D O M N O N (A (D EA .-- fA M EA ER Z W El-1 M 69 6? f� Ln M� I� V3 El-T 0 W � jr e» i» efl H ❑ LU viaQ OJ U Z w Z yw - WLL 0 O LU ? U U O M co (M') m co O V O M M 7 C Ln r• Q) M O O 7❑ M (n co D) co —7 (D .-- Zr W F W fn Z J o ❑ Lu F J ? N Z Lu OOZ ~ ❑ U. W 1 Z 0� N xx =xxxxxx ZO u U LL LL} i U U LL LL LL U U U U U U U (n } LL LL LL LLLL m ~Q Z W JJUUQQ W W JJJQ QQQQQQ W W W W W W W J(nJJJ(n (n }� H D ❑� ULL C7 �' J Z N O m U m Q > U 0 (L a w aN Qt- Z � �D ❑ w U a C r W a o o 2 (n U> - N .0 U U U > m c 3 o 0 3 a Z < z (L u O w ill (n O E LL J a 6. JLW- > �H 3 m o. m 2' Q Q N Tm ..co L d �U-Uo m c pL N N t0 �O Q cn N rr C 0 L N O C G C L T C m O 0~ t"Z 4 ❑tea � W HU�Q (n>��LL �>�ll> 0CLu dQU Ln O m m ➢ m o` a 7 Z o0 fD j m _ O ITJ 1 Ox yy c mm i m p w w � y 0 0 (A r 0 a o C7 X rm 77 m 77 V7 �+ C - n y m m m < n i o m a o y < r < r 2 m r x m r C y O y M � � 0 e N m o < m p Z b �C < m o s m i v a Z 0 0 0 0 0 o o J 0 O 0 0 v o 0 O m o m Y `'' n 00 N x u P � ➢ O O � O O FIDELITY GUARANTY AND ACCEPTANCE CORP. Box 2863, Hoi;sToy, Ti.x As 77252-2863 1'110NI; (713) 599 2575, FAx (713) 599-2570 MAY 4. 2000 BENEFICIARY: CITY OF PORT COLI,NS �� IORrPORAVE.C® FORT COLLINS.NS. CO SOS I RE: IRREVOCABLE CLEAN LETTER OF CRFDIT # FGAC-00089 GENTLEMEN: WE HEREBY ESTABLISH_ AT T1IF REQUEST AND FOR THE ACCOUNT OF U.S. HOME CORPORATION, 10707 CLAY ROAD, HOUSTON, TX 77041, IN YOUR FAVOR AS BENEFICIARY. OUR IRREVOCABLE. I_FTFLR OF CREDIT NO. 00089. IN THE AMOUNT OF FOUR IIUNDRED ONE THOUSAND TWO HUNDRI-D TWI N I FIGHT AND O0 100 U.S. DOLLARS (5401,228.00) (AS MORE FULLY DESCRIBED BFI,OW). 1 11 LCTIVE. IMMEDIATFLY AND EXPIRING AT [HE CLOSE OF BUSINESS ON MAY 12, 2001, Al OIJR 01 HOT AT 10707 CLAY ROAD. HOUSTON. TX 77041. THIS ILL HER OF CRFDIT IS INTENDED FOR THE REGISTRY RIDGE P.U.D., Ise FILING, (PHASE 3) DI`VELOPMEN I PRO.IECF FOR THE ASSERANCE OF THE COMPLETION OF THE CONSTRUCTION AND I [IF MAINTENANCE AND REPAIR OF THE PUBLIC INFRASTRUCTURE IN CONNECTION WITH 'III[ AFORESAID DFVELOPMFN F PROJECT AND ITS ASSOCIATED DEVELOPMENT AGREEMENT AND DEVFLOPMENTCONSTRUCTION PERMIT. FUNDS UNDER IIIIS LETTER OF CREDIT ARE AVAILABLF'10 YOU FOR ONF. OR MORE DRAWINGS PRIOR TO THE CLOSE OF BUSINESS ON MAY 13, 2001, AGAINST SK3H"F DRAFTS IN AN AGGREGATE CUMULATIVE AMOUNT NOT TO EXCEED 5401 '28.00. DATED THE DATE OF PRESENTMENT. DRAWN ON OUR OFFICE REFERRED TO ABOVE. REF;-RRING I HEREON TO THE NUMBFR OF THIS LETTER OF CREDIT AND ACCOMPANIED BY YOUR WRITTEN CERTIFICATE SIGNED BY YOU AND ACKNOWLEDGED AS THEREIN PROVIDED IN THE 1'ORM OF EXHIBIT I HERETO. PRESENTATION OP SUCH DRAFT AND CERTIFICATE SHALL BE MADE AT OUR OFFICE REFERRED 10 ABOVE. UPON THE EARLIER OF (1) OUR HONORING YOUR DRAFT(S) TOTALING $401228.00 IN THE AGGREGATE PRESENTED ON OR BEFORE THIS LETTER OF CREDIT EXPIRES PURSUANT TO THE "TERMS HEREIN OR (11) THE SURRENDER TO US BY YOU OF THIS LETTER OF CREDIT FOR CANCF.LI.AI [ON, THIS LETTER OF CREDIT SHALL AUTOMATICALLY TERMINATE. IT IS I_INDGRSTOOD THAT THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED AS PUBLIC IMPROVEMHNI'S ARE. CONSTRUCTED AND ACCEPTftD BY THE CITY. AS COMPONENTS OF THE INFRASFRUCTC'RL ARE SATISFACTORILY COMPLETED IN ACCORDANCE WITH APPROVED IJ IILITY PLANS.I HE VALUE OF TI IE COMPLETED COMPONENTS MAY BE ESTABLISHED FROM THE DI_VI LOPMFNT COWS"FRUCIION PERMIT W'ORKSHEET FOR DETERMINING COSTS OF INI R.AS,1'RUC'Tl!t2E C'ONSTRCCTION AND INSPECTION FEES, WHEREUPON "TIIF AMOUNT OF THIS 11Il ll[R OF CREDIT MAY BE REDUCED BY "I -HE VALUE OF THE COMPLETED COMPONENT(S). UPON IPXIfCU"IION OI AN V'v FNDMEVF "FO I,I TTER OF CREDIT IN THE FORM ATTACHED HERETO AS F.XHIBFI'3. THIS LETTER OF CREDIT SHALL BE SUBJECT TO THE UNIFORM COMMERCIAL CODE AS IN EFFECT IN HIF STATE OF COLORADO..AND. TO THE EXTENT NOT INCONSISTENT WITH THE TERMS OF THIS I I FP.R OF CREDII AND THE UNIFORM COMMERCIAL CODE. THE UNIFORM CUSTOMS AND PRAC I R F, FOR DO( UMEN I-ARY CREDITS. I993 REVISION. [CC PUBLICATION NUMBER 500. THIS LFI FER OF CREDIT WILL BE AUTOMATICALLY EXTENDED WITHOUT AMENDMENTS FOR ONE YEAR FROM THE PRFSENI. AND EACH FUTURE. EXPIRATION DATE THEREOF. UNLESS ISSUER DELIVERS WRITTEN NOTICE Al LEAST SIXTY (60) DAYS PRIOR TO ANY SUCII EXPIRATION DA"FE W-KiRt"1 CERTIFICATE The City of Fort Collins hereby certifies as follows with respect to the certain Irrevocable Letter of Credit No. dated established in favor of the City of Fort Collins., Colorado (the "Letter of Credit"): (a) He (51ie) is authorized to execute this Certificate of behalf of the City of Fort Collins; (b) The applicant/developer is in default under the terms of the development agreement and/or the development construction permit, (c) The sum of $ , which is the amount of the draft presented with this Certificate, is the amount currently due to the City of Fort Collins from (d) The amount of the accompanying draft together with all previous draws under the Letter of Credit do not exceed in the aggregate $ ; and (e) The Letter of Credit has not expired. IN WITNESS WHEREOF, the undersigned has executed this Certificate of behalf of the City of Fort Collins this day of THE CITY OF FORT COLUNS, COLORADO A Municipal Corporation 0 [Title] LETTER OF TRANSMITTAL City of Port Collins To: �f:7AV1.15I109407:14:1WilMi9:IVA.1:8 Date: Project: ❑ Redlined Utility Plans See attached sheet for number of copies to resubmit. Resubmit copies to: ❑Current Planning ❑Engineering ❑ Redlined Storm Drainage Report See attached sheet for number of copies to resubmit. Resubmit copies to: ❑Current Planning ❑Engineering ❑ Development Agreement Please sign, seal, date, and return all copies of this agreement. Changes in the agreement take two (2) days to process if they are acceptable to the City. Please take this into account in your schedule. Again, all copies must be returned. ❑ Original Mylars Needing Revisions Please return with the "post -it" notes intact. ❑ Original Mylars with City Signatures Please return one (1) mylar and four (4) signed and stamped blueline print copies for our files. Li Development Construction Permit Application Please fill out and return to Engineering counter with application fee and all required attachments. ❑ Development Construction Permit for your Signatures Please sign (but do not date) and return. ❑ Attached is your Copy of the Development Construction Permit ❑ Draft Developmlent Agreement For your review and comments. Please call with your comments or questions. Let me know if everything is okay. ❑ Attached is your Copy of the Development Agreement. ❑ Other: Transportation Services — Engineering Department 281 North College Avenuc P.O. Laos SRO Dort Collins, CO 80522-0590 (970) 331-6750 Memo To: Sheri Wamhoff From: James Vick CC: Date: 04/24/00 Re: Registry Ridge Filing I, Phase II Please see attached. Everything should be in order, let me know if I need to make any changes. Can we still get a pre -con meeting scheduled for May 3, 2000 for phase 11? I do not think that we will be ready for the North Shields pre -con on May 3"' , but I will have everything ready and submitted by May 1" for pre -con on May 101". If you have any questions rn act me at your earliest convenience. James Vick L • Page 1 _ .i I I tin •.t i` �IUK ii rt, iuli 1 ��i� na !Y) }1i �>>� r<I 1 ._ '�i! )'.I': 1 )—I` %J !i: �', To: Sheri Wamhoff From: James Vick City of Ft. Collins — Plan Review Double Eagle Construction Services, Inc. 281 N. College Ave. 400 E. Horsetooth, Suite 300 Ft. Collins, CO. 80522 Fort Collins, CO.80525 Fax: Fax: (970)206-1134 Phone: Phone: (970) 223-1122 Project: Registry Ridge Filing I, Phase II Date: 04/24/00 ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle We are sending you the following items: • Development Construction Permit Application, #A015-00 • Permit Application Fee, $300.00 Tran"Portation Services I- .nI;iIWOIillI I)cp1rtIII cnt Cite of Fort Collins City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: O'(- 2-9 Issuance Date: Project Name: Re ist Rid e PUD I"Filin Shields Street rruu nvau Drive Project A.K.A.: Project Location: Shields Street - Trilby Road north to Fossil Creek Drive Permittee: Gre " = Seenonm City and developer contacts: See attached ched E hibthis ifor names and phone numbers of all conta pers for $ paid Fees: Permit Application Fee ($300.00) 8,992.40 Construction Inspection Fee (paid prior to issuance of this pT al $ 8,992.40 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 600,321.11 j- i ✓ „ i [✓fee: s Form of security deposited with the City: L e- PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications orthe City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. (III,.,.,�. Acrnur • t'( ). 1• Inrt Cnllin,, ( 0 So-,22-11680 • (970) 221-660 • FAX (070) 221-6378 %% c I rni-rAiII1i1 U. u, 3. Construction time restrictions: N/A 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional band Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 2 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Registry Ridge PUD 1" Filing - Off -site sewer, Trilby Road (on -site and off -site). Shields Street (on -site), and Phase 1 Project A.K.A.: City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 x7140 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) 217-8899 Current Planner: Bob Blanchard 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 Water Utilities Engineer: "Perry Farrill, Fort Collins Loveland Water District/ South Fort Collins Sanitation District 4700 S. College Ave, Fort Collins, Co 80525 (970) 226-3104 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mircles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Exhibit "A" page 1 of 3 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditi Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property.. as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Approval for issuance: �I P City Engineer Approval: V Cate: �JZ-7 � O (Permit Issuance Date) Exhibit "A" page 3 of 3 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Registry Ridge PUD, I" Filing (Shields Street, Trilby Rd to Fossil Creek Drive) Project A.K.A.: Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 x7140 Construction Inspector: Jeff Baldwin 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6605 Cell (970) 218-2157 Current Planner: Steve Olt 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 Water Utilities Engineer: Terry Farrill 4700 S. College Ave, Fort Collins, Co 80525 (970) 226-3104 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6815 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Exhibit "A" page 4 of 3 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970)221-6361 Light and Power: 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Developer' Contact Persons: Project Manager: Gregg Seebohm Double Eagle Construction Services, Inc 375 E. Horsetooth Road, Building 6, suite 102 Fort Collins, Co 80525 (970) 223-3500 Cell (970) 222-3875 Fax (970)223-5454 Dbleg194 c(e msn.com Developer/Owner: Jerry B. Richmond Dalco Land, LLC 6000 S Greenwood Plaza Blvd, Suite 210 Englewood, Co 80111 (303)779-6100 Cell (720) 350-2070 Fax (303) 221-1436 richmondi gw£ ushome. com Project Engineer: Bud Curtiss Northern Engineering 420 S. Howes, Suite 202, Fort Collins, Co 80521 (970)221-4158 Cell (970) Fax (970) 221-4159 New2214158@aol.com All Contractors: Grading/Utility/ Paving Contractor: Dave Simpson Connell Resources 4305 E. Harmony Rd, Fort Collins, Co 80525 (970) 223-3151 Cell (970) 222-3575 Fax (970) 223-3191 Exhibit "A" page 5 of 3 Utility Contractor: Dave Simpson Connell Resources 4305 E Harmony Road, Fort Collins, Co 80525 (970)223-3151 Cell (970) 222-3575 Fax (970) 223-3191 Concrete/ Structures: Wayne Schell Concrete structures, Inc. 4325 Hilltop, Longmont, Co 80504 (970)535-0202 Cell (303) 591-0372 Fax (970) 535-4382 Paving Contractor: Dave Simpson Connell Resources 4305 E Harmony Road, Fort Collins, Co 80525 (970)223-3151 Cell (970) 222-3575 Fax (970) 223-3191 Landscape: Mark Stock Alpine Gardens 7029 S. College Ave, Fort Collins, Co 80525 (970)226-2296 Cell (970) 215-9483 Fax (970) 223-6348 Surveying: Mike Lang The Sear Brown Group 5285 McWhinney Blvd, Suite 482-5922 Traffic Control: Joe Brandt Testing: Earth Engineering Co, Lester Litton Exhibit "A" page 6 of 3 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970)221-6361 Light and Power: Janet McTag 700 Wood Street, Fort Collins, Co 80521 (970)224-6154 US West: Developer' Contact Persons: Project Manager: Gregg Seebohm, Double Eagle Construction Services, Inc. 400 E. Horsetooth Road, Suite 300 Fort Collins, Co 80525 (970) 223-3500 Fax (970) 206-1134 Cell (970) 227-7775 Dbleaconst@aol.com Developer/Owner: Ed Zebrowski, Regional VP -Mountain Operations Land Division U.S. Homes 6000 S. Greenwood Plaza Blvd, Suite 200 Englewood, Co 80111 (303)779-6100 Fax (303)221-1436 Architect/Planner: Project Engineer: General Contractor: or All Other Contractors: Grading/ Utility: Roger (Bud) Curtis Northern Engineering Services 420 North Howes, Suite 202 Fort Collins, Co 80521 (970) 221-4158 Fax (970) 221-4159 Dave Simpson Connell Resources, Inc. 4305 E. Harmony Rd Fort Collins, Co 80525 (970)223-3151 (970)223-3191 Exhibit "A" page 2 of 3 Concrett, .,'lat work: Lloyd Lawson Lawson Construction Company, Inc. P.O. Box 1318 Longmont, Co 80502 (303) 776-3456 Fax (303) 938-9955 Pager (303) 419-3178 Concrete/ Structures: Wayne Shell Concrete Structures, Inc. 4325 Hilltop Longmont, Co 80504 (970)535-0202 Fax (970) 535-4382 Paving: Bill Schrader Lafarge 1800 N. Taft Hill Road Fort Collins, Co 80522 (970) 407-3627 Fax (970) 407-4700 Cell (970) 481-5222 Landscape: Mark Stock Alpine Gardens 7029 S. College Ave. Fort Collins, Co. 80525 (970)226-2292 Fax (970) 223-6348 Cell (970) 566-1071 Surveyor: Mike Lang The Sear -Brown Group 209 S. Meldrum Fort Collins, Co 80521 (970) 482-5922 Fax (970) 482-6368 Testing: Lestor Litton Earth Engineering Consultants 2301 Research Blvd. Fort Collins, Co 80526 (970)224-1522 Fax (970) 224-4564 Bore (Drill): John Stute Store Construction Co 6025 S. Shields Fort Collins, Co 80526 (970)226-6846 Exhibit "A" page 3 of 3 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ❑ �n U3 P O cp FA tH FA M t9 to 69 fA to eA t9 fA FA m P P I� m O w ❑ NN 69 fH Vi _ Z fA fH EA U O 2 N _ Q W m a LLJ N ul � ? z O O O O O O Q p p 0 m o o o 0 2 0= Q O O O O O O J J ~ 3F- 3 Z M m m m U J� O J U J J O J O I- K3 bi ty fA m m m m m EA fA fA fA EA bi O m: W U LL LL 0 LL LL LL F- t� (r ❑ IL W UJCL oI vi:. Lu > LLJ m. z a. Z 0 w '. o 0 0 0 0 0 0 0 0 0 m 0 0 0 o o N o N O o o o 0 0 0 �n ipa to 0 0 0 IlI- �: W m r m � � N o �'' Q ❑. ❑ co co m M P ai � co co vi � of m o (�. w. a. VT W. w O h > rw_U t" W 3 Lm o000000 oMomoo NOMoo ocO ono Moen :;O ct. Z m o 0 0 0 o m M o m o co 0 o m o co o m o m M m o r_ N. O O m m O N P 1� O P O P �O O N �IJ N O O m m LO O M F. p P m fA fA 69 �A t9 :❑ pp Z W e> P m o m F» F» co P co m P M m F» FA :. w 16 CIA co vl h. a U fn LLJ c p p m Z U U O to O m ❑ : W Q Z O U ❑ O O P M M m r m .- M O m t0 N^ O m {i c0 Z W O. Q._ W a LU w p a w zp m T U c cn 'n LL LL>> U U (7 U) >' LL LL LL LL LL r a' O- ~ Q J J U U Q Q J > J J J Q Q Q Q Q Q Q n N Z O c O v t m CC U LU C z = w t- ii Z� � y c U) U CO W 9 O. m UJ N V r J O C w IX N d N y U— of N C = V U p N m U m > w z c Z a O 3 E a J < .5 �U) wH p N ad cE v10 Q rS~ Nd :_? m LE No m mE > W Vw❑I COm N mN !_' Nm W Cm mNj N '.-. m wd zWiU-I �CL mOC —NC '° a a am z 0cnir u3a. 30,3 > omm QUOTATION: REGISTRY RIDGE FILING 1 PAGE3 BID BID BID /T511 DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL STORM SEWER I5" RCP 138 LF 29.00 5,452.00 18" RCP - 488 LF 30.40 14,335.20 21" RCP 136 LF 33.00 4,433.00 24" RCP 984 LF 40.40 39,753.60 27" RCP 1168 LF 68.50 80,008.00 30"RCP 72 LF 49.50 3,564.00 36' RCP 1112 LF 60.00 66,720.00 48" RCP 38 LF 117.00 10,296.00 66" RCP 24 LF 188.00 4,512.00 is" FES 3 EA 3M.00 1,050.00 24" FES I I EA 400.00 4,400.00 '_T FES 1 EA 660.00 660.00 30" FES 1 EA 570.00 570.00 36" FES 12 EA 660.00 7,920.00 43" FES 2 EA 320.00 1,640.00 66'FES 2EA 1,330.00 3,660.00 REMOVE ZMSTLVG 36" RCP 60 LF 9.00 540.00 CONCRETE ENCASEMENT 380 LF 52.00 19,760.00 FDIAMETER vLA\TICLE 4 EA 2,030.00 8,120.00 5' TYPE R INLET I EA 2,240.00 2,240.00 _ 10' TYPE R INLET 4 EA _20.00 12,380.00 1 F TYPE R INLET 13 EA 3.960.00 51 480.00 _ 28' TYPE R INLET. I EA 7,360.00 7,360.00 _ OVERFLOW S U=-RE I EA s,900.00 4,900.00 r4LET POND 602 1 EA 3,300.00 3,300.00 OVERFLOW WEIR 1 EA 1,320.00 1,320.00: 36" FES TRASH RACK 2 EA 3"'0.00 1,640.00 TYPE L RIPRAP',UBEDDING 276 CY 59.00 16,284.00 TYPE NI RIPRAP'a"BEDDING lu CY 81.00 9,963.00 TRI-LOCI: 3LCC 'VTABR1C 2:280 SF 12.40 23,"'72.00 PEC-MAT 11547 SF 0.90 10,392.30 TRAFFIC CONTRCL 1 LS 5,000.00 5,000.00 RE(cVE.1SP1?4L` 1066 SY 3.30 4,050.30 TFNWORARY PATCH WRAP 1066 1.00 1,066.00 TOTAL STORM SEWER S439,096.90 QUOTATION: REGISTRY RIDGE FILING 1 PAGE 2 BID BID BID ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL WATERLINE !ON -SITE! 1S" DIP _ 410 LF 42.50 17,425.00 16" DIP 290 LP 41.00 11-180.00 I -PVC 460 LF 2120 11,132.00 10" PVC - 3030 LF 17.00 51,510.00 3" PVC 5775 LF 15.25 83,068.75 6" PVC 4". LF 14.00 5,950.00 24'I3 TtE I EA 3.170.00 3,170.00 IS" BUTTERFLY VALV2,2OX 1 EA _00.00 2,300.00 24'Bli==YVALVE'BOX I EA 3,650.00 3,650.00 24" SOLID SLEET 1 EA 1; 10.00 1,210.00 TIE TO EXISTING 1 EA 1-i53.00 2,355.00 18'IO IVELDED WET TAP 2EA 3,340.00 7,680.00 16"VALVEBOX I EA 1,300.00 1,800.00 12' V.ALVEBOX 2 EA !,-0.00 1. 40.00 10"VALVEEOX 6 EA 1.310.00 6,060.00 8" VAL%: BOX Z3 EA 714.00 16,422 00 6" VALVE BOX I7 E.A. 520.00 8,340.00 FIRE HYDR.A�,T I7 EA 1470.00 24.990.00 I"AIR RELEASE .'=EARLY 2EA 3.540.00 7,080.00 8.6 TEE '. EA 10.00 1,550.00 10.10 TEE 2 EA 404.00 308.00 10.6 REDUCER 1 EA "-'".00 _5.00 10'5 TEE 6 EA 366.00 2,196.00 10.1 REDUCER 5 EA 196.00 980.00 I S•S CRESS 1 EA 1,370.00 I,S70.00 16'5 :cE ! EA M.00 325.00 I6' 16 TEE 1 EA 940.00 940.00 16'3 REDUCER i EA 445.00 445.00 16'12 REDUCER I EA 445.00 445.00 L'^i<E ! EA 473.00 473.00 12'10 REDUCER '_ EA 230.00 560.00 10.3 TEE 4 EA 340.00 1,360.00 12-S TEE 1 EA 497.00 497.00 3'3 T'cE 3 EA 310.00 930.00 3.8 CRCSiS 2 EA 360.00 720.00 3-6 REDUCER , EA 170.00 1,190.00 I3'16 REDUCER I EA HMO 380.00 10.8 CRCSS 1 EA 420.00 420.00 10" 45 BE',-D 4 E.A. 232.00 1,123.00 3' 45 SEND 2 EA 210.00 420.00 10' PLUG I EA 240.00 240.00 3/4" SERVICE- 143 EA '.95.00 35,085.00 I"SERVICE I EA 1.190.00 1,190.00 .ADJUST VALVE 3O.te.S 50 EA 186.00 9,300.00 ASPHALT P.iTC:7tiG 20 SY 75.00 1.500.00 TRAFFIC=,TRCL 1 LS L950.00 1,950AO TOTPl SVA7F-U1,,£ (ON -SITE) 5392,499.75 r