REGISTRY RIDGE PUD - GENERAL COMMENTS:
Sheet 1 of 2: Final Plat
• Provide either a match line or make sure that the site is on one page instead of
splitting it up.
• Label the adjoining properties.
• Show ROW dimensions on all of the public streets.
• Need to show 2 ties to the section corners.
• The access at the north end of the property needs to be contained within an
access easement. Part of the easement will be offsite, therefore we will need to
see the appropriate documents prior to receiving final approval.
• Show all necessary offsite easements and ROW dedications and provide the
proper documentation prior to final approval.
Comments are continued on the next page v-
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_✓ Plat _✓ Site _ Drainage Report ✓ Other e55po� m
Utility ✓Redline Utility ✓ Landscape 00OWaO5
Registry Ridge - Final plan review (page 2 of 2) July 2, 1997
Utility Plans
10_ See plans for comments on conflicts between the plat and the plans.
Overall Utility
11. Is all of Trilby being done with Phase I? It is not clear.
Plan and Profile sheets
12. The curb through the traffic circle is vertical (collector) and as such still don't have a 2.0%
cross slope in the traffic circle.
Striping plans
13. See plans for comments on Bon Homme Richard striping.
14. See plans for additional comments. I tried to circle the page numbers on all the sheets that I
had comments on.
Off street work
15. Are the two existing 72 inch culverts (under Taft Hill) going to be structurally sound with the
decreased cover?
16. Still believe that the x-section of Trilby Road should be twelve foot travel lanes and 6 foot
bike lanes (on both sides). I understand that you believe that this is not a part of the approval, but
the approval was for bike lanes and three travel lanes. I need to check into this some more to
determine what our position on this is.
17. Trilby road x-sections
• Easements are needed for all work outside of the row. This may just involve construction
easements or permanent slope easements.
• Showing a side slope of 3:1 is this stable? Typical require a slope of 4:1 or flatter. Is this
the only location that this occurs? Need to provide us with enough information to clearly
indicate that this is a stable slope and can support the roadway.
18. See plans for additional comments.
City of Fort Collins
Current PlanninP
DATE:
PROJECT: 1
PLANNER:
ENGINEER:
PROJECT
COMMENT SHEET
DEPT: Engineering
8 No Problems
Problems or Concerns (see below or attached) July 2, 1997
Registry Ridge - Final plan review
In General
No Plat or site plan was received with this submittal, therefore the plans can not be checked
against them. And do not know what easements are needed by separate documents.
A variance request for the traffic circle needs to be submitted along with the layout showing that
it accommodates a SU-30 vehicle.
Utility Plans
l . Wainwright Drive should have vertical curb and gutter with detached sidewalk as should all the
streets classified as collectors.
Overall Utility
2_ Is all of'rrilby being done with Phase 17 It is not clear.
3. It appears that Forestel Drive as shown as part of the Phase I improvements may be exceeding
the 660 foot maximum Fire Code requirement for access from a single point of access. 1 don't
know what the parameters are for measuring it
Still need a sight distance easement across lot 47_
5 Wainwright Drive at the intersection of Trilby Road needs to have a 50 foot flowline to
towline width to accommodate the left turn lane and the bicycle lanes
(Continued on next page)
A
Date: Signature —
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑
SITE
❑
UTILITY
❑
LANDSCAPE
Registry Ridge - Final plan review (page 2 of 2) July 2, 1997
6 The turn around at the end of Bon Homme Richard Drive needs to be only a 40 foot radius -
not a 80 foot radius-
? The Island in the traffic circle is not to be a separate tract, but a part of the Row.
Plan and Profile sheets
8 Access points to the club house - max radius allowed for these drives is 15 foot. A detail for
this driveway cuts needs to be provided.
Striping plans
9 These plans need to be reviewed by the transportation department. I would imagine that all of
Ranger Drive should be a collector with parking to accommodate the on street parking needs of
the park.
Culverts
10 Need to allow for a min of 1 foot approx flat area on each side of the path.
I I See plans for additional comments. I tried to circle the page numbers on all the sheets that I
had comments on.
Off street work
12. Need to define how the work is to be done - Is any of the existing road to be milled, overlaid,
or is it all new construction?
13. As per conversation with George Schock regarding the x-section configuration of Trilby
Road Twelve foot travel lanes and 6 foot bike lanes (on both sides) need to be provided This
requires that pavement be added to the northern side of trilby road adjacent to the property. The
plans as reviewed do not show this.
14_ Trilby road x-section should be modified to show the required x-section.
• Easements are needed for all work outside of the row This may just involve construction
easements or permanent slope easements.
• Showing a side slope of 3 1 is this stable? Typical require a slope of 4:I or flatter. Is this
the only location that this occurs? Need to provide us with enough information to clearly
indicate that this is a stable slope and can support the roadway.
15 See plans for additional comments.
PROJECT
COMMENT SHEET
Citv of Fort Collins
Current Planning
DATE: February 6, 1997 DEPT: Engineering
PROJECT: REVISIONS #32-9513 Registry Ridge PUD,
Phase I - Final
PLANNER: Mike Ludwig
All comments must be received by: Wednesday, February 26th, 1997
Registry Ridge - Final plan review March 1997
Attached are a copy of the comments from the county
Questions that had been asked:
Can irrigation structures/ lines and utilties remain in the ROW?
Yes - unless there is a conflict with the improvements to be done. If there is a conflict
then they should be moved. We prefer private utilities such as irrigation lines to out side
of the ROW.
Are we going to require fencing to be moved out of the ROW if it is currently within the existing
ROW?
We will only require the fencing to be moved out of the row if it will be disturbed by the
improvements Any fencing that is disturbed by grading or improvements shall be
replaced in kind at the back of the ROW line.
At the neighbor hood meeting it was indicated that a pole fence is to be provided along Trilby.
This fence needs to be placed outside of the ROW and at least two feet behind the sidewalk.
(Continued on next page)
Date:Signature
CHECK IF YOU WISH TO RECEIVE PLAT
COPIES OF REVISIONS SITE
LANDSCAPE
UTILITY
Registry Ridge - Final plan review (page 2 of 5) March 1997
A variance request is needed for the Traffic circle - with the request provide drawings showing
that the traffic circle accommodates turns in accordance with the SU-30 template and that a
moving van will be able to get through the intersection_ This can be on 8'/2 x 1 1 paper.
As per my previous discussions with Bud Curtis and Kathy Mathis the following aply to the street
system. A collector connection is needed north to Trilby Road. It is suggested that Wainwright
Drive could be continued south to Tnrxtun Dr and then Ranger Drive between Truxton and
Forestel can be eliminated as a vehicular connection (a pedestrian connection trhu there should be
retained). Wainwright needs to be 50 feet flowline to flowline from Trilby road south to
accomidate stacking for left and right turns. Beyond that Wainwright can be a 36 foot flowline to
flowline street as parking and access will not be allowed off of it. If this is not done Ranger
should be continued as a 50 street to Forestel and Forestel is to be a 50 foot street from Ranger to
Wainwright. Reeves Drive between Ranger and Hancock and Hancock from Reeves to
BonHomme can be a 36 foot street. These roads will probably function as more of a connector
than a collector. Bon homme Drive should be a 50 foot flowline to flowline street to the end of
this filing.
In General
*** A striping plan for the collectors needs to be provided.
Plat
• Note 5 shall be modified to read as follows 5. Tract B is to be used as shown on the Plat
and is to be owned and maintained by Peace with Christ Lutheran Church, a Colorado
non -Profit Corporation, heirs, successors, grantees or assigns.
• If the Church does own Tract B and it is being plated they will need to sign the plat as a
owner and interest. If they don't own it yet it may be better to address this as note 6 does.
What happens if they don't buy it or they eventually sell it-
• Delete note 7 The traffic circle is to be a part of the ROW, but will be maintained by the
homeowners assoc-
• Add the following note: 7. Lots 63, 69, 70, 75, 76, 1 l 3, 119 shall not have access off of
Ranger Drive. Access shall be taken off of the local street adjacent to the lot.
• Add the following note: 8. Lots 9 and 10 shall not have access off of Wainwright Drive.
All access shall be taken off of the local adjacent street. (Note: the additional 4 lots that
will be adjacent to Wainwright should be added.
• Add the following note: 9. All lots within this development have frontage on a public
street and in accordance with the City Code property owner(s) are responsible for
maintaining the Right-of-way exclusive of the public street. Lots 63 thru 67, 78 thru 81
have multiple street frontages adjacent to each of said lots and, as a result and in
accordance with City Code, the owners of said lots are responsible for the maintenance of
all street frontage(s) adjacent to each of said lots.
• Add the following note10. All Landscaping placed in medians/ traffic circles within the
right-of-way shall be maintained by the Homeowners association.
• Notes regarding easements- need to make sure these are clearly shown on the drawings.
(Continued on next page)
Registry Ridge - Final plan review (page 3 of 5) March 1997
• Note 4 (and 5 and 6) under the easements states that the 9 foot utility easements adjoining
Ranger and Reeves Drives are also to be used for landscape purposes. - So are you stating
that these are to be utility and landscape easements? These need to be clearly defined on
the plans to indicate where the landscape easement ends.
• Add the Sight Distance Easement Restrictions to the plat:
SIGHT DISTANCE EASEMENT RESTRICTIONS
THE AREA WITHIN SIGHT DISTANCE EASEMENTS IS RESTRICTED TO THE FOLLOWING'
I FENCES SHALL NOT EXCEED 42" IN HEIGHT AND SHALL BE OF OPEN DESIGN. IF FENCES
EXCEED 32'' IN HEIGHT, THEY SHALL BE CONSTRUCTED OF SPLIT RAIL WITH A MINIMUM
DIMENSION OF 1 2'' BETWEEN HORIZONTAL MEMBERS.
2, BERMS, HEDGES. AND SHRUBS SHALL NOT EXCEED 32" IN HEIGHT.
3. TREE PLANTING SHALL BE RESTRICTED TO DECIDUOUS TREES ONLY. THE LOWEST BRANCH
OF ANY TREE SHALL BE NO LESS THAN 42" FROM GRADE.
• The water district and the tri-state electric need to sign the plat.
• The individual sheets do not have north arrows or a scale indicated on them.
• Label the row widths on Shields Street and Trilby Road.
• Provide reception number for tri-state easement if it is an existing easement.
• Need to define where the utility and drainage easements end- Do these back lot easements
go all the way to the street or do they end earlier.
• A nine foot easement shall be provided along all local and collector streets ROW. This
includes areas that are not being plated at this time but are adjacent to dedicated ROW.
These will need to be dedicated by separate document.
• What row is being dedicated north and south of Bon Home Richard DO Is what is shown
adequate for the improvements that are needed?
• Tract G is indicated as being a blanket pedestrian, access, drainage and landscape
easement there is no problem with this other than at the time you wish to build the club
house, pool etc- these easements will need to be vacated where the buildings sit.
• See plat for additional comments.
Utility Plans
Overall Utility (in general), sheets 2 - 7
• Need to indicate how the utilities will be phased and the limits of construction for each
phase.
• Show the location of barricades necessary with the phasing.
• Easements don't necessarily agree with the plat. Show the sight distance easements.
• The right turn lane at Truxtun should not extend all the way to the intersection. It should
be bumped out and then tapered in
Plan and Profile sheets
• The vertical curves need to be designed to meet the proper design requirements, crest
vertical curves are controlled by stopping sight distance and sag vertical curves are
controlled by headlight sight distance. See the attached sheet for these minimums. Many
of the vertical curves provided do not meet the minimums. Local streets have a design
speed of 30 mph and the collectors have a design speed of 40 mph_
• The centerline on Bon Homme Richard Drive west of Nimitz does not meet the collector
standard minimum. A variance would need to be requested for this if it is not changed.
(Continued on next page)
Registry Ridge - Final plan review (page 4 of 5)
March 1997
• Indicate the radius for the traffic circle. It does not appear that there is adequate slope
provided around the circle, but I didn't know what the exact pavement width was and
what type of curb and gutter is being proposed on the circle. A variance request for the
traffic circle needs to be submitted along with the layout showing that it accommodates a
SU-30 vehicle.
• See plans for additional comments.
Culverts, plans and profiles, sheets 43 and 44
• Need to allow for a minimum of 1 foot of approximately flat area adjacent to sidewalks
before sloping down or up.
General Details, sheet 92
• Add additional information to the details as shown on the plans.
Need a mid block detached walk ramp detail. We don not currently have a standard one.
You will need to create one.
Off -site Arterial Street Improvements
Shields Street Plan and Profile
• Indicate what grade you are tying into.
Shields Street Grading Plan
• Easements are needed for all work outside of the row. This may just involve construction
easements or permanent slope easements.
Shields Street Cross -Sections
• Is this all new construction? Does any milling need to be done? Are portions an overlay?
Need to indicate what is to be done and how this is to be constructed.
Shields Street(interim) striping and signing plan
• Need to show the proper signing and striping for the shoulder area to be used as a bike
lane.
• Need to indicate the width and the colors to be used for the striping.
• Show where the roads intersect Shields Street-
• Indicate where the tapers begin and the taper length.
Shields Street Arterial plan And Profile
• Need to show limits of construction for phase 1 and how the road will be transitioned
back to the existing width. The left into Truxtun will need to be provided with the first
phase improvements. How is this to be built? Is it all going to be done at once or in
phases? If it is to be phased with the development, need to see how that is proposed to
work.
• Need to show how the limits of construction tie into the existing pavement section at the
south end of the property.
Shields Street Arterial Striping plan
• Is the left onto Bon Homme Richard Drive adequate? Is it being designed to
accommodate this filing only or full build out of the entire preliminary?
• If this is not to be built all at one time - stripping plans will need to be provided for each
phase.
Trilby Road Arterial Plan and Profile
• The future typical cross section should reflect the striping for a minor arterial.
(Continued on next page)
Registry Ridge - Final plan review (page 5 of 5) March 1997
• You are showing 5 foot bike lanes on Trilby. I don't know if this is going to be
acceptable. My previous comments called for 6 foot bike lanes. I need to check with
transportation. I know they did not comment on it, but I don't know if they noticed it or
if the right person got to take a look at it.
Trilby Road cross sections
• Provide a I foot approximately flat area behind the sidewalk before sloping up or down
Trilby Road intern cross sections
• Is this all new construction? Does any milling need to be done? Are portions an overlay?
Need to indicate what is to be done and how this is to be constructed.
• Showing a side slope of 3: I is this stable? Typical require a slope of 4:1 or flatter. Is this
the only location that this occurs? Need to provide us with enough information to clearly
indicate that this is a stable slope and can support the roadway.
Trilby Road interim striping plan
• Indicate the location of the transition beginnings and the transition lengths.
• Show the Railroad crossing location - I don't imagine the striping will be carried over the
tracks.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: February 6, 1997 DEPT: Eng Pvmnt
PROJECT: REVISIONS #32-9513 Registry Ridge PUD,
Phase I - Final
PLANNER: Mike Ludwig
All comments must be received by: Wednesday, February 26th, 1997
A preliminary Geotechnical Engineering Report was not submitted. The report
is required with a final submittal.
Date: Signature
r
EIVE
COPIES OF REVISIONS
❑ SITE
❑ LANDSCAPE
❑ UTILITY
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: June 25, 1996 DEPT: Engineering - Ping
PROJECT: #32-9513 Registry Ridge PUD, Phase I - Final
PLANNER: Mike Ludwig
All comments must be received by: July 5, 1996
Registry Ridge - Final plan review August 2, 1996
A full resubmittal of all utility plans in not necessary on revision date (unless it is
required to address issues brought up by a department by revision date).
Provide information to address the indicated concerns that are marked with three
asterisks by revision date and a full submittal addressing the rest of the
comments noted can be submitted at a later date. This is an effort to clearly
identify those items and issues that need to be addressed by revision date and
yet allow more time for the Engineers to address the more minor comments.
As was discussed in a prior meeting Revisions need to be submitted on:
August 21 for review to be considered for the September P&Z meeting.
September 4 for review to be considered for the October P&Z meeting.
(Continued on next page)
-oil SI ga
CHECK IF YOU WISH TO RECEIVE PL T
COPIES OF REVISIONS ❑ SITE
❑ LANDSCAPE
0 UTILITY
Comments continued from the previous page...
• Please modify the Attorney's Certificate as shown on the attached sheet.
Sheet 2 of 2: Final Plat
• Provide either a match line or make sure that the site is on one page instead of
splitting it up.
• Label the adjoining properties.
• Show ROW dimensions on all of the public streets.
• Need to show 2 ties to the section corners.
• If the portion of the project south of Bon Homme Richard Drive is not a part of
the 2"d Filing, please eliminate it from the plat.
Sheet 1 of 3: Preliminary Overall Utility Plan
• Show the other side of Bon Homme Richard Drive with all of the accesses.
• You need to provide handicap access ramps at all of the pedestrian crossings.
• The handicap access ramps and pedestrian crossings around the traffic circle
need to be out of the travel lanes.
• If this filing is constructed before the 1s` Filing, the following improvements will
need to be completed:
1. Bon Homme Richard Drive along the property frontage
2. Nimitz Drive along the property frontage
3. Truxtun Drive along the property frontage
4. Shields Street north to Fossil Creek Drive.
• Offsite requirements needed if this filing is constructed before the 15` Filing:
1. ROW needs to be acquired
2. Offsite easements for grading, utilities, drainage, etc.
• I'm concerned with the design of the gas station. It appears that the entrance is
too small for a semi -truck to get in and out effectively. Please provide more
information and prove that this will work.
• See sheet number 1 of 3 for additional comments and concerns.
Registry Ridge - Final plan review (sheet 2 of 12) August 2, 1996
The remaining items can be addressed at the time a full submittal is made.
Traffic study
`** The traffic study needs to be updated to address the following
items:
1)There is now only one road intersecting Trilby out of this de✓elopment.
2)The traffic study states that all four roads (now only three exist) that connect
out to the arterials are collectors. The current plans show only two of the
three roads being collectors, how does that effect things.
4)The traffic study addendum states that shields will have a five lane cross
section and as such the auxiliary lanes will be provided/required as a part of
that ultimate cross section. Yes a left will be provided, but this does not
address if a dedicated right turn lane would be needed at these access points
when a 5 lane cross section occurs. ( I talked To Matt about this and he said
that yes dedicated right turn lanes would be needed with the ultimate x-
section)
Site plan
** Sight distance easements should be provided as shown. Sight
distance easements appear to be needed across lots 3, 447, 416,
89, 94, 130, 131, 344, 206, 333, 327, 297, 510, and Tract G.
*`* Indicate what type of barrier is to be used to limit vehicular traffic
on the emergency access road at King Court and Kearsarge Court.
*** Note 5 states that 'Landscaping of common open space areas shall
be included with this phase'. There are thirteen phases to this
project, which one are you referring to.
**" The following note needs to be added to the plans (if traffic circles
are to be used): Landscaping in all traffic circles shall conform to
sight distance restrictions as provided on the plat.
Landscape plans
*** The phase lines need to be modified to show the entire street width
that is to be included in that phase. This should also indicate if
planting are to be done on both sides of the road in that phase.
(Half roads are not built)
*"* Indicate all the sidewalk ramp locations as indicated on the plans.
Phase 5 has been mislabeled phase 1.
(Continued on next page)
Registry Ridge - Final plan review (sheet 3 of 12) August 2, 1996
*** With the current phasing a temporary turnaround will be required
with phase 3 and phase 10 as shown. At the beginning of Phase
5 Ranger Drive will need to be completed from Reeves Drive to
Truxton Drive. At the beginning of Phase 8 Bon Homme Richards
Drive and Ranger Drive From Bon Homme Richards Drive to
Reeves Drivf- will need to be completed with Road base to meet
emergency access requirements.
• A suggestion - Why not in phases 9 and 10 bring the green space path up to
the sidewalk (along the street) where a ramp is required.
*** Indicate what type of barrier is to be used to limit vehicular traffic
on the emergency access road at King Court and f<earsarge Court.
*** The paths are shown in different locations on the utility plans.
*** The following note needs to be added to the plans(if traffic circles
are used): Landscaping in all traffic circles shall conform to sight
distance restrictions as provided on the plat.
• The Blue Spruce will not be allowed in the traffic circle turn around.
In General
*** The following roads will function as collectors and should be
designed as such: Ranger Drive from Trilby Road south to Reeves
Drive, Reeves Drive from the west property line to Hancock Drive,
Hancock Drive from Reeves Drive to Bon Homme Richard Drive,
and Bon Homme Richard Drive from Shields Street to Hancock
Drive.
*** We are in the process of developing criteria for traffic circles
(roundabouts). Until that criteria is developed traffic circles will not
be allowed. Based on the vehicle size that will need to pass
through the circles they may need to be about twice the size that
has been shown on this project.
*** Ranger Drive and Bon Homme Richard Drive need to be widened
out at the intersection with the Arterials to a 50 foot flowline width
to accommodate a dedicated right turn and left turn lane. The
roads need to be widened out for a distance necessary to
accommodate the stacking and vehicle volumes and provide for a
oroper taper. Additional ROW would need to be provided if the
same width of parkway is desired as is shown now or if the road is
widened to one side. Due to the volumes and striping on Ranger
Drive access to Wainwright Court may end up being somewhat
limited.
(Continued on next page)
Registry Ridge - Final plan review (sheet 4 of 12) August 2, 1996
*** Lots 108 thru 112 need to have a common drive provided for them
since Ranger Drive is being proposed as a 36 foot collector. Any
other lots fronting on a collector street would be required to have
common drives unless a 50 foot flowline to flowline width is
provided.
**' Twelve feet of additional ROW needs to be provided along Shields
Street prior to each access point to provide for a dedicated right
turn lanes. The curb returns off of Truxtun and Bon Homme
Richard Drive need to be put in at the ultimate flowline location.
The sidewalk along Shields Street needs to be placed where it will
exist ultimately.
• A striping plan for the collectors needs to be provided.
Plat
• Note 6 shall be modified to read as follows: 6. Tract B is to be used as shown
on the Plat and is to be owned and maintained by Peace with Christ Lutheran
Church, a Colorado non -Profit Corporation, heirs, successors, grantees or
assigns.
• If the Church does own Tract B and it is being plated they will need to sign the
plat as a owner and interest. If they don't own it yet it may be better to
address this as note 7 does What happens if they don't buy it or they
eventually sell it.
*** Add the following note: 9. Lots 62, 87, 88, 89, 94, 95, 100, 101,
107, 32, 61 and 416 shall not have access off of Ranger Drive.
,Access shall be taken off of the local street adjacent to the lot.
*** Add the following note: 10. All lots within this development have
frontage on a public street and in accordance with the City Code
property owner(s) are responsible for maintaining the Right-of-way
exclusive of the public street. Lots 70-88, 90-92, and 103-107
have multiple street frontages adjacent to each of said lots and, as
a result and in accordance with City Code, the owners of said lots
are responsible for the maintenance of all street frontage(s)
adjacent to each of said lots.
• Notes regarding easements- need to make sure these are clearly shown on
the drawings.
• Note 4 under the easements states that the 9 foot utility easements adjoining
Ranger and Reeves Drives are also to be used for landscape purposes. - So
are you stating that these are to be utility and landscape easements? These
need to be clearly defined on the plans to indicate where the landscape
easement ends.
(Continued oc i next page)
Registry Ridge - Final plan review(sheet 5 of 12) August 2, 1996
• Label the easements on the plans.
• Additional easements for drainage and utilities need to be provided as
indicated on the plans.
*** ,Add the Sight Distance Easement Restrictions to the plat:
SIGHT DISTANCE EASEMENT RESTRICTIONS
THE AREA WITHIN SIGHT DISTANCE EASEMENTS IS RESTRICTED TO THE FOLLOWING'
FENCES SHALL NOT EXCEED 42" IN HEIGHT AND SHALL BE OF OPEN
DESIGN. IF FENCES EXCEED 32" IN HEIGHT, THEY SHALL BE
CONSTRUCTED OF SPLIT RAIL WITH A MINIMUM DIMENSION OF 12° BETWEEN
HORIZONTAL MEMBERS.
2. BERMS, HEDGES, AND SHRUBS SHALL NOT EXCEED 32" IN HEIGHT.
3. TREE PLANTING SHALL BE RESTRICTED TO DECIDUOUS TREES ONLY. THE
-OWEST BRANCH OF ANY TREE SHALL BE NO LESS THAN 42" FROM GRADE.
*** You have two Tract G's shown and no Tract F. Tract G is dedicated as
utility, access, :andscape and drainage easement per notes on page 1. I
don't think you want the multifamily area defined as that.
*** Provide additional Row along Shields Street for future right turn lane.
*** The intersections of Row should be provided with radii. IE. Corner of
Shields and Trilby, Ranger and Trilby, Truxtun and Shields and Bon
Homme Richard and Shields.
• Need to define where the utility and drainage easements end Do these back lot
easements go all the way to the street or do they end earlier. (See between lots 47 and
48)
*** A 15 foot utility easement shall be provided along Trilby Road and Shields
Street
*** General locations of sight distance easements are shown_ Lots 89 and 94
have a good portion ofthe lots taken up with sight distance easements, this
will be reduced some with the elimination of the traffic circle.
*** Lots 108 thru 112 will need a common drive with access easements
covering that area, unless a 50 foot street section is used.
*** Should the strip of land between lots 424 and 425 be its own tract? Does
the park want to own and maintain this piece?
• Tristate Electric needs to sign the plans for the easement dedicated to them.
(Continued on next page)
Registry Ridge - Final plan review (sheet 6 of 12) August 2, 1996
*** Coral Sea Court, Shark Court, Wasp Court, Sea Wolf Court, Trout Court,
Scamp Court and Tang Court are shown with the ROW in the cul-de-sacs
having square corners- The Row needs to have rounded corners and
extend 9 feet beyond the flowline in the cul-de-sac. We do not want all the
additional RO`wi' shown These type of cul-de-sac were provided in
Fairbrooke Tract A that was done by Northern - that is a good example of
what is acceptrble- Some of the lot lines will have to be extended or
redrawn as they won't appear to have frontage with the reduction of ROW.
In addition some of the bulb cul-de-sacs appear to have excess row - these
should also only have row that extends 9 feet beyond the flowline of the
cul-de-sac.
*** A nine foot easement shall be provided along all local and collector streets
Row
*** Tract Q provides for no access for maintenance, how is this tract going to
be maintained.
*** An off site utility easement is needed at the South end of Kearsarge Ct.
Utility Plans
Cover sheet
• Corrections on the general notes should be made
• The following note shall be added to the General Notes: The developer is responsible
for all costs for the initial installation_ of traffic signing and striping for this development
related to the.. development local street operations. In addition the developer is
responsible for all costs for traffic signing and striping related to directing traffic access
to and from the development (e_g. All signing and striping for a right turn lane into the
development site).
Construction Phasing Plan, sheet 947
• With the current phasing a temporary turnaround will be required with phase 3 and
phase 10 as shown- These don't necessarily need to be shown on this plan.
• At the beginning of Phase 5 Rangy=er Drive will need to be completed from Reeves Drive
to Truxton Drive At the beginning of Phase 8 Bon Homme Richards Drive and
Ranger Drive From Bon Homme Richards Drive to Reeves Drive will need to be
completed with Road base to meet emergency access requirements- This needs to be
shown or indicated somehow
• The right turn lane southbound on Shields Street onto Truxtun Drive will need to be
built with Phase 10. This needs to be shown.
Overall Utility I'in general), sheets 2 - 10
• The phasing needs to be shown and need to indicate how the utilities will be phased and
the limits of construction for each phase. Need to show the barriers indicated
necessary for each phase and the temporary turnarounds_
(Continued on next page)
Registry Ridge - Final plan review (sheet 7 of 12) August 2, 1996
• The curb, gutter and sidewalk needs to be shown on Trilby. The sidewalk needs to be
shown along, Shields Street. All internal paths need to be shown.
• Show the sidewalk ramps as indicated on the plans
-
• Lot lines and easement lines don't necessarily agree with the plat_
• Make sure manholes stay out of the curb and gutter.
• It is recommended that the paths connect into the sidewalk at a ramp location if this is
possible.
• Show curb stops in Legend.
Plan and Profit(,- sheets
• Label the flowlines on profile - east, west, north, south
• The cross slopes on the streets all appear to be less than 2.0%- Need to remember that
this is calculated from the lip of gutter to the crown, see 1.02.03 14 of the street
standards
• Show the curb returns and slope for the intersecting streets on the profiles.
• Show the location of the sidewalk ramps.
• The street intersections where a cross pan is not used need to be designed in
accordance with detail D-18 with a transition to start the crown line instead of taking
the crown into the intersecting road The through road needs to keel its 2.0% slope
through the intersection with other streets.
• The vertical curves need to be designed to meet the proper design requirements, crest
vertical curves are controlled by stopping sight distance and sag vertical curves are
controlled by headlight sight distance. See the attached sheet for these minimums -
Many of the vertical curves provided do not meet the minimums. Local streets have a
design speed of 30 mph and the collectors have a design speed of40 mph.
• In several intersections with out cross pans the elevation at a point along the flowline of
the through street is too close to the elevation in the flowline. From the flowline to the
lip of gutter a rise of 1 1 i occurs for rollover curb and gutter and is even greater for
vertical curb and gutter_ With these elevations being too close together this will not
allow for the pavement to be straight graded out to the centerline, but instead to fall
from the lip of gutter down to the point indicated and this rise up to the centerline.
These elevations need to be modified so that a straight grade from the lip of gutter to
the centerline can be achieved
-
• Provide more detail and elevations in the intersection of Ranger Drivn and Trilby Road,
Truxtun Drive and Shields Street, and Bon Homme Richard Drive.
• Ranger Drive at Trilby Road, showing a sump condition without provisions for
drainage, while other plans show Ranger Draining onto Trilby-
• The flowlines at the traffic circles don't appear to correspond with what is shown on
the plan view.
• The curb returns at Bon Homme Richard Drive and Truxtun Drive need to be designed
to accommodate the future right turn lanes That is a right turn lane in addition to the
ultimate arterial cross section.
(Continued on next page)
Registry Ridge - Final plan review (sheet 8 of 12) August 2, 1996
• Bon Elommc: Richard Drive and Truxtun Drive need to be built to the curb returns on
Shields Street-
*** The centerline on Bon Homme Richard Drive west of Nimitz does not
meet the collector standard minimum. A variance would need to be
.requested for this if it is not changed.
• In many of the cul-de-sacs the high point needs to be moved so that the cross slopes in
the cul-de-sacs are reduced or increased to meet minimums as the case would be. The
minimum cross slope in a cul-de-sac is 1 0% and would like to see th , slopes minimized
where at all possible.
• The approach grades of a street intersecting another street shall not exceed a slope of
2.0% for 50 feet from the Row of the intersected street. It is currently exceeding it on
Trout Court and Scamp Court.
• In Kearsarge Court (south end) there is two low spots. This needs to be modified or
another inlet. provided.
• See plans for additional comments
Grading Plans, Sheets 63 -71
*** Curb and gutter should be provided along Trilby Road and no swale should
exist between 'he curb and walk.
• Is the grading to be done in phases or all at once" Erosion control estimates should
reflect any phasing so that an amount for the entire site doesn't need to be deposited.
• Lot lines in certain areas don't necessarily reflect what is shown on the other plans.
*** The sidewalk on Shields Street north of both entrances needs to be moved
over to accommodate the future right turn lanes-
• Some of the path locations differ from what is shown on the landscape plan. In
particular the path near the corner of Trilby and Shields.
* ** Ofl' site easements will be needed for the grading work on the east side of
Shields Street.
• Sheet 71 has the wrong area shown on it.
Drainage Plan, Sheets 72 - 80
• Easements are needed for all the swales shown. Not all have easements shown for
them now.
• some of the sidewalk locations are shown sitting on top of the swales.
• Swale section AA - where does the sidewalk go as in swale 9.
Culverts, plans and profiles, sheets 81 - 82
• Culvert 19 will need to go to the curb and gutter.
*** Can culvert 51 be built without getting onto the property to the east?
Storm Sewer lines, Plan and Profiles, sheet 85
• Don't need interim storm sewer line 1 as curb and gutter should be put in with this
project.
General Details, sheet 92
• The new sidewalk ramp details need to be used, see attached for new details
(Continued on next page)
Registry Ridge - Final plan review (sheet 9 of 12) August 2, 1996
• On the street intersection approach details indicate what the transition length for crown
removal is based on your design.
• If traffic circles (medians) are used the detail for outfall curb and gutter is needed.
• Provide detail D-25 Asphalt paving at crosspans.
Off -site Arterial Street Improvements
Cover sheet
• Correct mistakes in the General notes and add note regarding stripping. See above for
wording of note
Shields Street Existing Conditions
• Label the existing edge of ROW.
• Label all items going tinder the roadway.
Shields Street Plan and Profile
• Indicate what grade you are tying into
• There are seine irrigations structures and other items being shown in the path of the
detached bike/ped path. How does this interact with the path, are modifications
needed?
*** the design of the vertical curves need to meet the requirements for the
stopping sight distance. If there is some reason why you are unable to do
so please discuss this with me Arterials should be designed for a 50 mph
speed. (This applies to the design of both Arterials-)
*** The curb return at the corner of Shields Street and Trilby Road needs to be
built with this project.
*** A right turn lane at Tr xton Drive will need to be built with phase 10- This
needs to be shown and designed
*** The sidewalk needs to be moved 12 feet to the west to accommodate the
future right turn lanes at Truxtun Drive and Bon Homme Richard Drive.
• Need to show how the pavement will transition off the curb returns at each access
point.
• Need to show limits of construction for phase I and how the road wi.l be transitioned
back to the existing width The left into Truxtun will need to be provided with the first
phase improvements.
*** Need to show how the limits of construction tie into the existing pavement
section at the south end of the property-
*** What are the existing grades that are being tied into.
*** Provide a cross section detail that shows the right turn lane.
Shields Street Grading Plan
*** The Row line needs to be labeled.
*** Casements are needed for all work outside of the row. This may just
involve construction easements or permanent slope easements.
*** Need to show now the grading ties into existing contours at the south end
of the project.
(Continued on next page)
Registry Ridge - Final plan review (sheet 10 of 12) August 2, 1996
Shields Street Gross -Sections
• Label the edge of ROW, and indicate easement locations.
*** Indicate what the slope of the road is at each cross section. If it is always
2.0% indicate that and call it out as typical Want to know if the slope
varies and how it varies.
• Is this all new construction? Does any milling need to be done? Are portions an
overlay? Need to indicate what is to be done and how this is to be constructed.
• Make sure the cross sections accurately show what is to occur and that the sections
that go through where the roads intersect reflect that.
*** Need to show how the pavement widens out for the right turn lanes and
how the sidewalk moves over.
*** Along the property you are showing a Row width of 100 feet. Does the 50
feet of Row on the east side exist or is it being dedicated with this project?
If it doesn't exist the Row will need to be dedicated and deeds of
dedication provided. This will need to be done prior to the property being
given or purchased by the City_ Slope casements will also be needed for
the slope of the road that extends past the Row_
Shields Street Interim Stripping Plan
• Need to show the intersection with Fossil Creek Drive and how the s`riping ties into
the existing striping. Don't appear to show the transition that occurs at this
intersection.
• Need to indicate the width and the colors to be used for the striping.
• Show where the roads intersect Shields Street.
• Indicate where the tapers begin and the taper length.
• Need to show the right turn lane and how the striping will need to be done for that. It
should probably be a different detail since it will be done with a later phase.
• How the striping should be done for the phase 1 work should be shown and then for
how it should be done for the phase 4 work_ This again may need to be done with
separate details/plans
• Need to show how the striping ties and transitions into the existing striping.
Trilby Road Existing Conditions
• Label the existing Row and the street intersecting the road.
• The overhead power line is shown just ending Does it do that/
• Is the line that is shown running down the middle of the road existing? (I think it is the
sewer line) If it is not existing it really shouldn't be shown on the sheets that say
existing conditions -
Trilby Road Interim Plan and Profiles
• What is the slope of the road at the point you are tying in? Is a transition needed to get
back to the existing width.
• babel the ROW line -
(Continued on next page)
Registry Ridge - Final plan review (sheet 11 of 12) August 2, 1996
• The south edge needs to be the flowline profile as the curb and gutter will be built on
the south site with this project.
• Will the design of Trilby Road east of Shields Street work with the preliminary design
that RBD did for the futurr overpass? (Part of the Ridgewood Hills 1 st filing plans)
*** On the cross sections - A 6 foot bike lane needs to be provided on both
side of the road It is not acceptable to provide a combined bike path/walk.
Therefore a 5 foot walk only need to be provided. The curb and gutter
needs to be built on the south side.
Trilby road interim Grading Plan
*** No swale shall exist between the curb and the walk.
*** Provide any necessary off site easements
Trilby Road intern cross sections
*** Indicate what the slope of the road is at each cross section_ If it is always
2 0% indicate that and call it out as typical. Want to know if the slope
varies and how it varies.
• Is this all new construction? Does any milling need to be done? Are portions an
overlay? Need to indicate what is to be done and how this is to be constructed.
• Make sure the cross sections accurately show what is to occur and that the sections
that go through where the roads intersect reflect that
*** Show the curb and gutter in the cross sections.
*** Along the off -site work you are still showing a Row width of 80 feet.
Does the 50 feet of Row on the south side exist or is it being dedicated
with this project? If it doesn't exist the Row will need to be dedicated and
deeds of dedication provided_ This will need to be donL prior to the
In operty being given or purchased by the City Slope easements will also
be needed for the slope of the road that extends past the Row.
*** Showing a side slope of') 1 is this stable? Typical require a slope of4.1 or
flatter Is this the only location that this occurs? Need to provide us with
enough information to clearly indicate that this is a stable slope and can
support the roadway -
Trilby Road interim striping plan
• Need to show how the striping connects with the existing striping and how the center
turn lane transitions out (at the west end)
-
• Indicate the location of the transition beginnings and the transition lengths.
• Show the Railroad crossing location - 1 don't imagine the striping will be carried over
the tracks.
• Contact the Transportation Department for questions regarding striping.
Shields Street Arterial plan And Profile
*** Need dedicated right turn lanes designed southbound oi.to Truxtun Drive
and Bon Homme Richard Drive -
(Continued on next page)
REVISION
COMMENT SHEET
DATE: June 17, 1997 DEPT: Engineering Pvmnt
PROJECT: #32-95D Registry Ridge PUD, 2nd Filing -
Preliminary (LDGS)
PLANNER: Mike Ludwig
All comments must be recieved no later than the staff review meeting:
Wednesday, July 2, 1997
A preliminary Soils Report will need to be submitted with the final project submittal.
Date: ( o —
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
-PIS _ Sid _ Dram p Repot _ Offer
_ Ugly — Rwlme tUq
Registry Ridge - Final plan review (sheet 12 of 12) August 2, 1996
*** :How does the design tic into the existing grades° A off -site design needs
iio be shown for an adequate distance to show that it works. As mention in
prev ious comments per 1.02.03 05 'The grade and ground lines of all
Arterials shall he designed to continue a 1000 feet beyond the end of
proposed construction'
Shield Street Arterial Cross Sections
• Basically .see previous comments on cross sections
Shields Street z%rteiial Striping plan
• Show designated right turn lanes.
Trilby Road Arterial Plan and Profile
*** I IoA does the design t!e into the existing grades? A off -site design needs
to he shown for an adcuuate distance to show that it works. As mention in
previous comments per 1,02 03 06 `The grade and ground lines of all
Arterials shall he designed to continue a 1000 feet beyond the end of
proposed construction'
*** 'I rilby Road Cross section- Both bike lanes need to remain on the roadway
per the latest discussions with transportation and that cross section will not
work within the 100 of Row. Trilby Road is currently proposed to be a
minor arterial with the new street standards This has yet to get through
Che Council It is scheduled m go in !ate August if it become a minor
atrterial this will solve ,our problems as tar as fitting the cross section into
the ROW without requiring additional ROW to the north, but we have to
go with the current master street plan until a change is approved. If you
want to wait and see ;fit is approved that is an option, otherwise you need
to loo!c at othc, options as mentioned in prior comments Anv ideas should
he discussed with Eric Bracke and myself We can certainly try and meet
to discuss this prior to any submittal
Trilby Road Arterial Cross Sections
• Basically see prcv ious comments on cross sections
Details
• Provide Detail D-20 additions to existine walk.
• The sidewalk ratnp details need to he the new approved ones - see details attached.
City of Fort Collins
Plannina
DATE:
PROJECT
COMMENTSHEET
DEPARTMENT:
All comments must be received by:
No Problems
LJ'Problems or Concerns (see below)
GENERAL COMMENTS
• IT IS NOT CLEAR WHAT IMPROVEMENTS TO SHEILDS AND TRILBY ARE BEING SHOWN
• IMPROVEMENTS TO SHEILDS AND TRILBY SHOULD INCLUDE BUILDING THE CURB, GUTTER
AND LOCAL STREET PORTION OF THE ROAD, REBUILDING THE EXISTING ROAD (IF
NECESSARY), PROVIDING ANY ADDITIONAL PAVEMENT THAT MAY BE NECESSARY FOR
REQUIRED TRAVEL LANES/ SHOULDER. BUILDING THE WALK (ON YOUR SIDE OF THE
ROAD) IN THE ULTIMATE LOCATION.
• A PRELIMINARY DESIGN FOR THE OTHER SIDE OF THE ROAD SHOULD BE PROVIDED
• OFF SITE DESIGN OF THE ARTERIALS SHOULD BE PROVIDED - AN ADEQUATE AMOUNT IS
NECESSARY TO SHOW THAT THE DESIGN DOES NOT SIGNIFICANTLY IMPACT THE FUTURE
DESIGN/ CONSTRUCTION. (UP TO 1 OOO FEET OF OFF SITE DESIGN CAN BE REQUESTED)
(CONTINUED ON NEXT PAGE)
i
f
Date: Signature:
CHECK IF YOU WISH TO RECEIVE ❑ PLAT
COPIES OF REVISIONS: ❑ SITE
❑ LANDSCAPE
❑ UTILITY
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580
PLANNING DEPARTMENT (303)221-6750
REGISTRY RIDGE: PUD - PLAN REVIEW COMMENTS NOVEMBER 1 4, 1 995
• YOUR MODIFIED COLLECTOR DESIGN SEEMS TO BE FINE AND ACCEPTABLE - TAKE NOTE
THAT WITH THIS CONFIGURATION THAT NO HOUSES CAN FRONT ON THE STREET. TO DO
50 ALTERNATIVE PARKING NEEDS TO BE PROVIDED FOR THOSE LOTS FRONTING ON THE
COLLECTOR STREET. THIS COULD INVOLVE PROVIDING A PRIVATE DRIVE THAT SERVES
SEVERAL LOTS OR PROVIDE A WIDER STREET SECTION THAT WOULD PROVIDE ON STREET
PARKING, CAN NOT TELL FROM THESE PLANS WHICH STREETS ARE COLLECTORS AND
FOR HOW FAR.
• PROVIDE THE. PLAT AS PART OF THE UTILITY PLAN SET.
• STILL NEED TO PROVIDE AN OFFICIAL VARIANCE REQUEST FOR THE ROUNDABOUTS.
SEE THE VARIANCE REQUEST PROCEDURES IN THE DEVELOPMENT REVIEW MANUAL. WE
ARE STILL LOOKING INTO THE FEASIBILITY OF THE ROUNDABOUTS.
• ALL COLLECTORS EXITING THE SITE SHOULD HAVE TWO LANES OUTBOUND AT SHIELDS
AND TRILBY. THIS MAY REQUIRE A LARGER STREET CROSS SECTIONS.
• THESE PLANS ARE VERY PRELIMINARY AND DO NOT SHOW ENOUGH TO PROVIDE
EXTENSIVE COMMENTS ON.
UTILITY PLANS -
COVER -
• ADD °(22 1 -6605) AND THE EROSION CONTROL INSPECTOR (22 1 -6569)11 INTO NOTE
7 AFTER "ENGINEERING DEPARTMENT
• REFERENCE SOILS REPORT
• PROVIDE REFERENCE TO PROJECT BENCH MARKS
SHEET 7, 6, AND 9 -
• ADD STREET NAMES
• INDICATE STREET WIDTHS, WHERE THE SIDEWALKS AND RAMPS ARE PLACED AND CURVE
DATA
• NEED A TYPE 111 BARRICADE AT THE END OF THE STUB STREET - NO ACCESS FOR THE
ADJACENT LOTS WILL PROVIDED OFF OF THIS STUB (NO DRIVEWAYS)
• WE WILL NEED TO SEE A STRIPPING PLAN FOR SHIELDS STREET AND TRILBY
SHEET 6 -
• INDICATE MATERIALS TO BE USED FOR THE FIRE ACCESS AND THE LOCATION OF AND ANY
BOLLARDS AND DRIVE CUTS IN THE CUL-DE-SAC
City of Fort Collins
Current Planning
PROJECT
COMMENT SHEET
DATE: 20 June1995 DEPARTMENT:'Alvyj 1/q
PROJECT: REGISTRY RIDGE PUD - Preliminary
PLANNER: Mike Ludwig
All comments must be received by: Friday, 30 June 1995
❑ No Problems
1=--� Problems or Concerns (see below)
TRAFFIC REPORT -
NORTHBOUND LEFT -TURN LANES AT BOTH COLLECTORS ON SHIELDS
SOUTHBOUND RIGHT -TURN LANE AT THE SOUTH COLLECTOR OFF OF SHIELDS
ALL COLLECTORS EXITING THE SITE SHOULD HAVE TWO LANES OUTBOUND AT SHIELDS AND
TRILBY
SITE PLAN
• ON SHIELDS STREET NORTHBOUND LEFTS NEED TO BE PROVIDED
• A RIGHT TURN LANE OFF OF SHIELDS ON TO BON HOMME RICHARD OR NEEDS TO BE
PROVIDED
*(CONTINUED ON NEXT PAGE)
Date:
CHECK IF YOU WISH TO RECEIVE ❑ PLAT
COPIES OF: REVISIONS: ❑ SITE
❑ LANDSCAPE
❑ UTILITY
COMMUNITY PLANNING and
ENVIRONMENTAL SERVICES... 281 NORTH COLLEGE, P.O.BOX 530 PORT COLLINS, COLORADO 80522-0580 (303)221-6750
CURRENT PLANNING DEPARI'NIENT
• THE TURN ABOUT INTERSECTIONS WERE NOT ADDRESSED IN THE TRAFFIC REPORT, A
VARIANCE IS NEEDED FOR ANYTHING NOT MEETING OUR STANDARDS. A WRITTEN
VARIANCE REQUEST SHOULD INCLUDE JUSTIFICATION AND DOCUMENTATION ON
FUNCTIONALITY. WE MAY NEED TO MEET ON THIS
• THE FIRE ACCESS NEEDS TO BE LABELED AND SHOWN
• A PORTION OF KEARSARGE CT IS NOT ON THIS PROPERTY AND IS NOT IN THE CITY. IT
NEEDS TO BE ANNEXED AND DEEDS OF DEDICATION PROVIDED FOR ROW, UTILITY
EASEMENTS, AND ANY GRADING AND/OR CONSTRUCTION WORK OUTSIDE OF THE ROW.
PLAT -
• SHOW THE UTILITY AND DRAINAGE EASEMENTS ON THE PLAT
• I 5 FOOT UTILITY EASEMENTS ARE NEEDED ALONG TRILBY AND SHIELDS
• ADD A NOTE `.STATING THAT ACCESS =OR LOTS 1 30, 1 29, 1 1 2 AND I I I MUST BE
OFF OF RANGER DR OR A PUBLIC TURNAROUND MUST BE PROVIDED AT THE END OF
THE STUB STREETS.
• PROVIDE ROW DIMENSIONS, CUL-DE-SAC RADII AND CURVE DATA INFORMATICN
• A PORTION OF KEARSARGE CT IS NOT ON THIS PROPERTY AND IS NOT IN THE CITY, IT
NEEDS TO BE. ANNEXED AND DEEDS OF DEDICATION PROVIDED FOR ROW, UTILITY
EASEMENTS, AND ANY GRADING ANC/OR CONSTRUCTION WORK OUTSIDE OF THE ROW.
• THE EMERGENCY ACCESS NEEDS TO BE DEFINED AND LABELED
• 50 FOOT OF POW IS NEEDED ALONG THE FULL LENGTH OF TRILBY
UTILITY PLANS -
COVER -
• ADD °(221 -6605) AND THE EROSION CONTROL INSPECTOR (22I -6569)° INTO NOTE
7 AFTER "ENGINEERING DEPARTMENT
• REFERENCE SOILS REPORT
• PROVIDE REFERENCE TO PROJECT BENCH MARKS
• USE ARTERIAL STREET SECTION WITH BIKE LANES
SHEET 7 -
• ADD STREET NAMES
• BUILD KITTYHAWK CT TO THE PROPERTY LINE
• INDICATE STREET WIDTHS, WHERE THE SIDEWALKS AND RAMPS ARE PLACED AND CURVE
DATA
• PROVIDE THE RIGHT TURN LANE OFF OF SHIELDS ONTO BON HOMME RICHARD DR
• WE WILL NEED TO SEE A STRIPPING PLAN FOR SHIELDS STREET
• THE TURN ABOUT INTERSECTICNS WERE NOT ADDRESSED IN THE TRAFFIC REPORT. A
VARIANCE iS .NEEDED FOR ANYTHING NOT MEETING OUR STANDARDS. A WRITTEN
VARIANCE REQUEST SHOULD INCLUDE JUSTIFICATION AND DOCUMENTATION ON
FUNCTIONALITY. WE MAY NEED TO MEET ON THIS.
(CONTINUED ON NEXT PAGE)
SHEET 6 -
• SHOW THE FIRE ACCESS - INDICATE MATERIALS TO BE USED LOCATION OF AND ANY
BALLLARDS AND DRIVE CUTS IN THE CUL-DE-SAC
/7
V U, I r 10 e. - � ��
PROJECT `
COMMENTSHEET
I
DATE: �� ��u DEPARTMENT:
PROJECT: -Ah"�Q�rf�`;� Cti
PLANNER:
All comments must be received by:
No Problems
Q'Problems or Concerns (see below)
REGISTRY RIDGE OFF -SITE ARTERIAL STREET IMPROVEMENTS - REVIEW COMMENTS
PAGE I OF 4 OCTOBER 30, 1996
WITHOUT THE PREVIOUS RED LINES I AM UNABLE TO DETERMINE IF THERE WERE ANY
CHANGES TO THE ROAD DESIGN AND THEREFORE SOME OF THE COMMENTS MAY NOT BE
APPLICABLE, BUT I DIDN'T CHECK EVERYTHING OVER AGAIN. I WILL DO THAT WHEN I GET
THE REDLINES BACK.
SHIELDS STREET EXISTING CONDITIONS
• LABEL THE EXISTING EDGE OF ROW.
• LABEL ALL ITEMS GOING UNDER THE ROADWAY.
(CONTINUED ON NEXT PAGE )
Date: !%������ Signature:c5/A :�41jW//
CHECK IF YOU WISH TO RECEIVE ❑ PL f
COPIES OF REVISIONS: ❑ SITE
❑ LANDSCAPE
❑ UTILITY
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580
PLANNING DEPARTMENT (303)221-6750
REGISTRY RIDGE OFF -SITE ARTERIAL STREET IMPROVEMENTS - REVIEW COMMENTS
PAGE 2 OF 4 OCTOBER 30, 1 996
SHIELDS STREET PLAN AND PROFILE
• INDICATE WHAT GRADE YOU ARE TYING INTO. HOW DOES THE DESIGN TIE INTO THE
EXISTING GRADES? A OFF -SITE DESIGN NEEDS TO BE SHOWN FOR AN ADEOUATE
DISTANCE TO SHOW THAT IT WORKS. AS PER 1 .02.03.06 'THE GRADE AND GROUND
LINES OF ALL ARTERIALS SHALL BE DESIGNED TO CONTINUE A 1 000 FEET BEYOND THE
END OF PROPOSED CONSTRUCTION.
• THE DESIGN OF THE VERTICAL CURVES NEED TO MEET THE REOUIREMENTS FOR THE
STOPPING SIGHT DISTANCE. IF THERE IS SOME REASON WHY YOU ARE UNABLE TO DO
SO PLEASE DISCUSS THIS WITH ME. ARTERIALS SHOULD BE DESIGNED FOR A SO MPH
SPEED. (THIS APPLIES TO THE DESIGN OF BOTH ARTERIALS.). I DID NOT RECHECK
THESE, I WILL DO IT NEXT TIME WHEN I HAVE THE REDLINES BACK SO THAT I KNOW IF
ANYTHING HAS CHANGED AND WHICH ONES NEED TO BE CHECKED.
• NEED TO SHOW LIMITS OF CONSTRUCTION FOR PHASE I AND HOW THE ROAD WILL BE
TRANSITIONED BACK TO THE EXISTING WIDTH, THE LEFT INTO TRUXTUN WILL NEED TO BE
PROVIDED WITH THE FIRST PHASE IMPROVEMENTS. OR ARE YOU INTENDING THAT ALL
THIS WORK BE DONE AS PART OF THE FIRST PHASE?
• NEED TO SHOW HOW THE LIMITS OF CONSTRUCTION TIE INTO THE EXISTING PAVEMENT
SECTION AT THE SOUTH END OF THE PROPERTY.
• PROVIDE A CROSS SECTION DETAIL THAT SHOWS THE RIGHT TURN LANE.
• HOW ARE THE CROWN TRANSITIONS BEING MADE FOR THE ROADS THAT INTERSECT
SHIELDS ALONG THE OFFSITE IMPROVEMENTS, THEY WILL NOT FIT INTO THE STANDARD
DETAIL FOR STREET INTERSECTIONS. THIS NEEDS TO BE SHOWN EITHER WITH A
SEPARATE DETAIL OR BY PROVIDING ENOUGH INFORMATION ON THE PLAN VIEW AND X-
SECTION.
• NEED TO MAKE SURE THAT THE NEW GRADES FROM DRIVEWAYS AND ROADS OUT TO
SHIELDS STREET ARE APPROPRIATE GRADES. WE WANT TO MAKE SURE THAT STEEPER
UNACCEPTABLE GRADES ARE NOT BEING CREATED. ANY WORK OUTSIDE OF THE ROW
WILL REQUIRE EASEMENTS.
• THE DRIVEWAYS NEED TO BE PAVED TO THE PROPERTY LINE AND DRIVEWAY CULVERTS
HAVE TO BE 1 rJ INCH DIAMETER MINIMUM WITHIN THE ROW, RCP OR CMP CULVERTS
ARE OKAY.
• ARE YOU STILL PROPOSING TO PROVIDE BIKE LANES ON SHIELDS STREET TO WHERE
THE COUNTYIS LEAVING OFF? IF SO THIS DESIGN WILL NEED TO BE SHOWN. CAN IT BE
DONE WITHOUT EASEMENTS? WE WOULD ALSO NEED TO SEE THIS ON THE STRIPING
PLAN.
SHIELDS STREET GRADING PLAN
• THE ROW LINE NEEDS TO BE LABELED.
• EASEMENTS ARE NEEDED FOR ALL WORK OUTSIDE OF THE ROW. THIS MAY JUST
INVOLVE CONSTRUCTION EASEMENTS OR PERMANENT SLOPE EASEMENTS.
SHIELDS STREET CROSS -SECTIONS
• LABEL THE EDGE OF ROW, AND INDICATE EASEMENT LOCATIONS.
• IS THIS ALL NEW CONSTRUCTION? DOES ANY MILLING NEED TO BE DONE? ARE
PORTIONS AN OVERLAY? NEED TO INDICATE WHAT IS TO BE DONE AND HOW THIS IS TO
BE CONSTRUCTED.
(CONTINUED OM NEXT PAGE)
REGISTRY RIDGE OFF -SITE ARTERIAL STREET IMPROVEMENTS - REVIEW COMMENTS
PAGE 3 OF 4 OCTOBER 30, 1 996
• MAKE SURE THE CROSS SECTIONS ACCURATELY SHOW WHAT IS TO OCCUR AND THAT
THE SECTIONS THAT GO THROUGH WHERE THE ROADS INTERSECT REFLECT THAT.
• SLOPES NEED TO BE LABELED AT 2.0% NOT 2%.
• EASEMENT WIDTHS SHOWN ON THE CROSS -SECTIONS DON'T AGREE WITH THAT SHOWN
ON THE PLAN AND PROFILE SHEETS.
SHIELDS STREET STRIPPING PLAN
• NEED TO SHOW THE INTERSECTION WITH FOSSIL CREEK DRIVE AND HOW THE STRIPING
TIES INTO THE EXISTING STRIPING. DON'T APPEAR TO SHOW THE TRANSITION THAT
OCCURS AT THIS INTERSECTION.
• NEED TO INDICATE THE WIDTH AND THE COLORS TO BE USED FOR THE STRIPING.
• SHOW WHERE THE ROADS INTERSECT SHIELDS STREET.
• INDICATE WHERE THE TAPERS BEGIN AND THE TAPER LENGTH.
• HOW THE STRIPING SHOULD BE DONE FOR THE PHASE I WORK SHOULD BE SHOWN AND
THEN FOR HOW IT SHOULD BE DONE FOR THE PHASE 4 WORK. THIS AGAIN MAY NEED
TO BE DONE WITH SEPARATE DETAILS/PLANS UNLESS IT IS ALL TO BE DONE WITH PHASE
I.
• NEED TO SHOW HOW THE STRIPING TIES AND TRANSITIONS INTO THE EXISTING STRIPING.
• IS THE LEFT LANE FOR THE SOUTHERN ACCESS INTO THE SITE BEING DESIGNED FOR
THE FIRST FILLING WORK OR IS WHAT IS BEING SHOWN FOR THE FULL DEVELOPMENT?
NEED TO MAKE SURE IT MEETS THE DESIGN REQUIREMENTS FOR LEFT TURN LANE.
TRILBY ROAD EXISTING CONDITIONS
• LABEL THE EXISTING ROW AND THE STREET INTERSECTING THE ROAD.
• THE OVERHEAD POWER LINE IS SHOWN JUST ENDING. DOES IT DO THAV
TRILBY ROAD PLAN AND PROFILES
• WHAT IS THE SLOPE OF THE ROAD AT THE POINT YOU ARE TYING IN? IS A TRANSITION
NEEDED TO GET BACK TO THE EXISTING WIDTH. HOW DOES THE DESIGN TIE INTO THE
EXISTING GRADES? A OFF -SITE DESIGN NEEDS TO BE SHOWN FOR AN ADEQUATE
DISTANCE TO SHOW THAT IT WORKS. AS PER 1.02.03.06 'THE GRADE AND GROUND
LINES OF ALI- ARTERIALS SHALL BE DESIGNED TO CONTINUE A 1 000 FEET BEYOND THE
END OF PROPOSED CONSTRUCTION.
• LABEL THE ROW LINE.
• SHOW THE OVERHEAD LINE, WANT TO KNOW WHERE IT SITS IN RELATION TO THE CURB
AND SIDEWALK.
• NEED TO SHOW FUTURE LANE CONFIGURATIONS ON THE TYPICAL X-SECTION
• YOU ARE SHOWING 5 FOOT BIKE LANES ON TRILBY. I DON'T KNOW IF THIS IS GOING TO
BE ACCEPTABLE. MY PREVIOUS COMMENTS CALLED FOR 6 FOOT BIKE LANES. I NEED
TO CHECK WITH TRANSPORTATION. I KNOW THEY DID NOT COMMENT ON IT, BUT DON'T
KNOW IF THEY NOTICED IT OR IF THE RIGHT PERSON GOT TO TAKE A LOOK AT IT.
TRILBY ROAD GRADING PLAN
• PROVIDE ANY NECESSARY OFF SITE EASEMENTS
TRILBY ROAD CROSS SECTIONS
• IS THIS ALL NEW CONSTRUCTION? DOES ANY MILLING NEED TO BE DONE? ARE
PORTIONS AN OVERLAY? NEED TO INDICATE WHAT IS TO BE DONE AND HOW THIS IS TO
BE CONSTRUCTED.
(CONTINUED ON NEXT PAGE)
REGISTRY RIDGE OFF -SITE ARTERIAL STREET IMPROVEMENTS - REVIEW COMMENTS
PAGE 4 OF 4 OCTOBER 30, 1 996
• MAKE SURE THE CROSS SECTIONS ACCURATELY SHOW WHAT IS TO OCCUR AND THAT
THE SECTIONS THAT GO THROUGH WHERE THE ROADS INTERSECT REFLECT THAT.
• INDICATE ROW WIDTHS
• NEED TO SHOW FUTURE NORTH FLOWLINE ON THESE CROSS-SECTION OR PROVIDE
CROSS-SECTION5 THAT SHOW THAT.
SHOWING A SIDE SLOPE OF 3: I IS THIS STABLE? TYPICAL REQUIRE A SLOPE OF 4: I OR
FLATTER. IS THIS THE ONLY LOCATION THAT THIS OCCURS? NEED TO PROVIDE US WITH
ENOUGH INFORMATION TO CLEARLY INDICATE THAT THIS IS A STABLE SLOPE AND CAN
SUPPORT THE ROADWAY.
TRILBY ROAD STRIPING PLAN
• INDICATE THE LOCATION OF THE TRANSITION BEGINNINGS AND THE TRANSITION LENGTHS,
• SHOW THE RAILROAD CROSSING LOCATION - I DON'T IMAGINE THE STRIPING WILL BE
CARRIED OVER THE TRACKS.
• CONTACT THE TRANSPORTATION DEPARTMENT FOR QUESTIONS REGARDING STRIPING.
Registry Ridge - Final plan review
A full resubmittal of all utility plans in not necessary on revision date (unless it is required to
address issues brought up by a department by revision date). Provide information to address the
indicated concerns that are marked with three asterisks by revision date and a full submittal
addressing the rest of the comments noted can be submitted at a later date This is an effort to
clearly identify those items and issues that need to be addressed by revision date and yet allow
more time for the Engineers to address the more minor comments
Aswas discussed in a prior meeting Revisions need to be submitted on:
August 21 for review to be considered for the September P&Z meeting.
September 4 for reviiew to be considered for the October P&Z meeting
-
the remaining items can be addressed at the time a full submittal is made.
'traffic study
*** The traffic study needs to be updated to address the following items:
I )There is now only one road intersecting Trilby out of this development
-
2)The tral£ic study states that all four roads (now only three exist) that connect out to the
arterials are collectors- The current plans show only two of the three roads being
collectors, how does that effect things.
4)The traffic study addendum states that shields will have a five lane cross section and as
such the auxiliary lanes will be provided/required as a part of that ultimate cross section.
Yes a left will be provided, but this does not address if a dedicated tight turn lane would
be needed at these access points when a 5 lane cross section occurs_ ( I talked To Matt
about this and he said that yes dedicated right turn lanes would be needed with the
ultimate x-section)
Site plan
*** Sight distance easements should be provided as shown. Sight distance easements appear
to be needed across lots 3, 447, 416, K 94, 130, 131, 344, 206, 333, 327. 297, 510, and
Tract G.
* * * Indicate what type of barrier is to be used to limit vehicular traffic on the emergency
access road at King Court and Kearsarge Court.
*** Note 5 states that `Landscaping of common open space areas shall be included with this
phase' There are thirieen phases to this project, which one are you referring to-
*** The following note needs to be added to the plans (if traffic circle's are to be used):
Landscaping in all traffic circles shalt conform to sight distance restrictions as provided on
the plat.
Landscape plans
*** The phase lines need to be modified to show the entire street width that is to be included
in that phase. This should also indicate if planting are to be done on both sides of the road
in that phase (Half roads are not built)
*** Indicate all the sidewalk ramp locations as indicated on the plans.
***` Phase 5 has been mislabeled phase 1.
*** With the current phasing a temporary turnaround will be required with phase 3 and phase
REVISION
COMMENT
DATE: June 17, 1997 DEPT: Engineering
PROJECT: #32-95D Registry Ridge PUD, 2nd Filing -
Preliminary (LDGS)
PLANNER: Mike Ludwig
All comments must be recieved no later than the staff review meeting:
Wednesday, July, 1997
9
REGISTRY RIDGE P.U.D. - GENERAL COMMENTS:
ENGINEERING IS RESERVING THEIR COMMENTS UNTIL REVISED UTILITY PLANS ARE SUBMITTED WITH
THE MODIFICATIONS REQUESTED ON THE COMMENT SHEET SENT OUT ON 4/25/97.
Date: Io AULy , M 177
CHEa HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X Pig x Site _ Drainage Report _ Outer
x Utility Z Rd= Utility Landscape
10 as shown. At the beginning of Phase 5 Ranger Drive will need to be completed from
Reeves Drive to Truxton Drive. At the beginning of Phase 8 Bon Homme Richards Drive
and Ranger Drive From Bon Homme Richards Drive to Reeves Drive will need to be
completed with Road base to meet emergency access requirements-
• A suggestion - Why not in phases 9 and 10 bring the green space path up to the sidewalk
(along the street) where a ramp is required.
*** Indicate what type of barrier is to be used to limit vehicular traffic on the emergency
access road at King Court and Kearsarge Court.
*** The paths are shown in different locations on the utility plans-
*** The following note needs to be added to the plans(iftraffic circles are used).
Landscaping in all traffic circles shall conform to sight distance restrictions as provided on
the plat-
• The Blue Spruce will not be allowed in the traffic circle turn around.
In General
*** The following roads will function as collectors and should be designed as such: Ranger
Drive from Trilby Road south to Reeves Drive, Reeves Drive from the west property line
to Hancock Drive, Hancock Drive from Reeves Drive to Bon Homme Richard Drive, and
Bon Homme Richard Drive from Shields Street to Hancock Drive.
*** We are in the process of developing criteria for traffic circles (roundabouts) Until that
criteria is developed traffic circles will not be allowed. Based on the vehicle size that will
need to pass through the circles they may need to be about twice the size that has been
shown on this project.
*** Ranger Drive and Bon Homme Richard Drive need to be widened out at the intersection
with the Arterials to a 50 foot flowline width to accommodate a dedicated right turn and
left turn lane:_ The roads need to be widened out for a distance necessary to accommodate
the stacking and vehicle volumes and provide for a proper taper. Additional ROW would
need to be provided if the same width of parkway is desired as is shown now or if the road
is widened to one side. Due to the volumes and striping on Ranger Drive access to
Wainwright Court may end up being somewhat limited-
*** Lots 108 thru 112 need to have a common drive provided for them since Ranger Drive is
being proposed as a 36 foot collector. Any other lots fronting on a collector street would
be required to have common drives unless a 50 foot flowline to flowline width is provided.
*** Twelve feet of additional ROW needs to be provided along Shields Street prior to each
access point to provide for a dedicated right turn lanes. 'rhe curb returns off of Truxtun
and Bon Homme Richard Drive need to be put in at the ultimate flowline location. The
sidewalk along Shields Street needs to be placed where it will exist ultimately.
• A striping plan for the collectors needs to be provided.
Plat
• Note 6 shall be modified to read as follows: 6. Tract B is to be used as shown on the Plat
and is to be owned and maintained by Peace with Christ Lutheran Church, a Colorado
non -Profit Corporation, heirs, successors, grantees or assigns.
• if the Church does own Tract B and it is being plated they will need to sign the plat as a
owner and interest If they don't own it yet it may be better to address this as note 7 does -
What happens if they don't buy it or they eventually sell it.
*** Add the following note: 9. Lots 62, 87, 88, 89, 94, 95, 100, 101, 107, 32, 61 and 416
shall not have access off of Ranger Drive. Access shall be taken off of the local street
adjacent to the lot.
*** Add the following note- 10 All lots within this development have frontage on a public
street and in accordance with the City Code property owner(s) are responsible for
maintaining 'the Right-of-way exclusive of the public street. Lots 70-88, 90-92, and 103-
107 have multiple street frontages adjacent to each of said lots and, as a result and in
accordance with City Code, the owners of said lots are responsible for the maintenance of
all street frontage(s) adjacent to each of said lots.
• Notes regarding easements- need to make sure these are clearly shown on the drawings.
• Note 4 under the easements states that the 9 foot utility easements adjoining Ranger and
Reeves Drives are also to be used for landscape purposes. - So are you stating that these
are to be utility and landscape easements? These need to be clearly defined on the plans to
indicate where the landscape easement ends.
• Label the easements on the plans.
• Additional easements for drainage and utilities need to be provided as indicated on the
plans.
*** Add the Sight Distance Easement Restrictions to the plat.
SIGHT DISTANCE EASEMENT RESTRICTIONS
THE AREA WITHIN SIGHT DISTANCE EASEMENTS IS RESTRICTED TO THE FOLLOWING:
FENCES SHALL NOT EXCEED 42'' IN HEIGHT AND SHALL BE OF OPEN DESIGN. IF FENCES
EXCEED 321 IN HEIGHT, THEY SHALL BE CONSTRUCTED OF SPLIT RAIL WITH A MINIMUM
DIMENSION OF 1 2° BETWEEN HORIZONTAL MEMBERS.
2. BERMS, HEDGES, AND SHRUBS SHALL NOT EXCEED 32" IN HEIGHT.
3 TREE PLANTING SHALL BE RESTRICTED TO DECIDUOUS TREES ONLY. THE LOWEST BRANCH
OF ANY TREE: SHALL BE NO LESS THAN 42'1 FROM GRADE.
*** You have two Tract G's shown and no Tract F. Tract G is dedicated as utility, access,
landscape and drainage easement per notes on page 1 I don't think you want the
multifamily area defined as that.
*** Provide additional Row along Shields Street for future right turn lane.
*** The intersections of Row should be provided with radii. IE. Corner of Shields and Trilby,
Ranger and Trilby, Truxtun and Shields and Bon Homme Richard and Shields.
• Need to define where the utility and drainage easements end. Do these back lot easements
go all the way to the street or do they end earlier. (See between lots 47 and 48)
*** A 15 foot utility easement shall be provided along Trilby Road and Shields Street.
*** General locations of sight distance easements are shown. Lots 89 and 94 have a good
portion of the lots taken up with sight distance easements, this will be reduced some with
the elimination of the traffic circle.
*** Lots 108 thru 112 will need a common drive with access easements covering that area,
unless a 50 foot street section is used.
* * * Should the strip of land between lots 424 and 425 be its own tract? Does the park want to
own and maintain this piece"
• Tristate Electric needs to sign the plans for the easement dedicated to them.
*** Coral Sea Court, Shark Court, Wasp Court, Sea Wolf Court, Trout Court, Scamp Court
and Tang Court are shown with the ROW in the cul-de-sacs having square corners. The
Row needs to have rounded corners and extend 9 feet beyond the flowline in the cul-de-
sac We do not want all the additional ROW shown_ These type of cul-de-sac were
provided in Fairbrooke Tract A that was done by Northern - that is a good example of
what is acceptable. Some of the lot lines will have to be extended or redrawn as they
won't appear to have frontage with the reduction of ROW. In addition some of the bulb
cul-de-sacs appear to have excess row - these should also only have row that extends 9
feet beyond the flowline of the cul-de-sac.
*** A nine foot easement shall be provided along all local and collector streets ROW
*** Tract Q provides for no access for maintenance, how is this tract going to be maintained.
*** An off site utility easement is needed at the South end of Kearsarge Ct.
Utility Plans
Cover sheet
Corrections on the general notes should be made.
The following note shall be added to the General Notes: The developer is responsible for
all costs for the initial installation of traffic signing and striping for this development
related to the development local street operations. In addition the developer is responsible
for all costs for traffic signing and striping related to directing traffic access to and from
the development (e g All signing and striping for a right turn lane into the development
site) -
Construction Phasing Plan, sheet 977
• With the current phasing a temporary turnaround will be required with phase 3 and phase
10 as shown. These don't necessarily need to be shown on this plan.
• At the beginning of Phase 5 Ranger Drive will need to be completed from Reeves Drive to
Truxton Drive. At the beginning of Phase 8 Bon Homme Richards Drive and Ranger
Drive From Bon Homme Richards Drive to Reeves Drive will need to be completed with
Road base to meet emergency access requirements. This needs to be shown or indicated
somehow_
• The right turn lane southbound on Shields Street onto Truxtun Drive will need to be built
with Phase 10_ This needs to be shown.
Overall Utility (in general), sheets 2 - 10
• The phasing needs to be shown and need to indicate how the utilities will be phased and
the limits of construction for each phase- Need to show the barriers indicated necessary
for each phase and the temporary turnarounds.
• The curb, gutter and sidewalk needs to be shown on Trilby. The sidewalk needs to be
shown along Shields Street. All internal paths need to be shown.
• Show the sidewalk ramps as indicated on the plans.
• Lot lines and easement lines don't necessarily agree with the plat.
• Make sure manholes stay out of the curb and gutter.
• It is recommended that the paths connect into the sidewalk at a ramp location if this is
possible
• Show curb stops in Legend.
Plan and Profile sheets
• Label the flowlines on profile - east, west, north, south
• The cross slopes on the streets all appear to be less than 2.0%- Need to remember that
this is calculated from the lip of gutter to the crown, see 1.02,03.14 of the street
standards.
• Show the curb returns and slope for the intersecting streets on the profiles.
• Show the location of the sidewalk ramps.
• The street intersections where a cross pan is not used need to be designed in accordance
with detail D-I8 with a transition to start the crown line instead of taking the crown into
the intersecting road. The through road needs to keep its 2.0% slope through the
intersection with other streets.
• The vertical curves need to be designed to meet the proper design requirements, crest
vertical curves are controlled by stopping sight distance and sag vertical curves are
controlled by headlight sight distance. See the attached sheet for these minimums_ Many
of the vertical curves provided do not meet the minimums. Local streets have a design
speed of." 0 mph and the collectors have a design speed of 40 mph.
• In several intersections with out cross pans the elevation at a point along the flowline of
the through street is too close to the elevation in the flowline. From the flowline to the lip
of gutter a rise of 115 occurs for rollover curb and gutter and is even greater for vertical
curb and gutter. With these elevations being too close together this will not allow for the
pavement to be straight graded out to the centerline, but instead to fall from the lip of
gutter down to the point indicated and this rise up to the centerline. These elevations
need to be modified so that a straight grade from the lip of gutter to the centerline can be
achieved
• Provide more detail and elevations in the intersection of Ranger Drive and Trilby Road,
Truxtun Drive and Shields Street, and Bon Homme Richard Drive.
• Ranger Drive at Trilby Road, showing a sump condition without provisions for drainage,
while other plans show Ranger Draining onto Trilby.
• The flowlines at the traffic circles don't appear to correspond with what is shown on the
plan view
• The curb returns at Bon Homme Richard Drive and Truxtun Drive need to be designed to
accommodate the future right turn lanes- That is a right turn lane in addition to the
ultimate arterial cross section.
• Bon Homme Richard Drive and Truxtun Drive need to be built to the curb returns on
Shields Street.
*** The centerline on Bon Homme Richard Drive west ofNimitz does not meet the collector
standard minimum. A variance would need to be requested for this if it is not changed.
• In many of the cul-de-sacs the high point needs to be moved so that the cross slopes in the
cul-de-sacs are reduced or increased to meet minimums as the case would be. The
minimum cross slope in a cul-de-sac is 1.0% and would like to see the slopes minimized
where at all possible-
• The approach grades of a street intersecting another street shall not exceed a slope of
2.0% for 50 feet from the Row of the intersected street. It is currently exceeding it on
Trout Court and Scamp Court.
• In Kearsarge Court (south end) there is two low spots. This needs to be modified or
another inlet provided.
• See plans for additional comments.
Grading Plans, Sheets 63 -71
*� * A right turn lane at Truxton Drive will need to be built with phase 10 This needs to be
shown and designed-
* * The sidewalk needs to be moved 12 feet to the west to accommodate the future right turn
lanes at Truxtun Drive and Bon Homme Richard Drive.
• Need to show how the pavement will transition off the curb returns at each access point.
Need to show limits of construction for phase 1 and how the road will be transitioned
back to the existing width_ The left into Truxtun will need to be provided with the first
phase improvements.
Need to show how the limits of construction tie into the existing pavement section at the
south end of the property.
**1 What are the existing grades that are being tied into.
***'� Provide a cross section detail that shows the right turn lane -
Shields Street Grading Plan
*** The Row line needs to be labeled.
*** Easements are needed for all work outside of the row. This may just involve construction
casements or permanent slope easements-
* * * Need to show how the grading ties into existing contours at the south end of the project.
Shields Street Cross -Sections
• Label the edge of ROW, and indicate easement locations.
*** Indicate what the slope of the road is at each cross section. If it is always 2.0% indicate
that and call it out as typical. Want to know if the slope varies and how it varies-
�1 Is this all new construction" Does any milling need to be done? Are portions an overlay"
Need to indicate what is to be done and how this is to be constructed.
Make sure the cross sections accurately show what is to occur and that the sections that
go through where the roads intersect reflect that.
Need to show how the pavement widens out for the right turn lanes and how the sidewalk
moves over.
* * * Along the property you are showing a Row width of 100 feet. Does the 50 feet of Row
on the east side exist or is it being dedicated with this project? If it doesn't exist the Row
will need to be dedicated and deeds of dedication provided. This will need to be done
prior to the property being given or purchased by the City. Slope easements will also be
needed for the slope of the road that extends past the Row.
Shields Street Interim Stripping Plan
Need to show the intersection with Fossil Creek Drive and how the striping ties into the
existing striping. Don't appear to show the transition that occurs at this intersection_
Need to indicate the width and the colors to be used for the striping.
• Show where the roads intersect Shields Street -
Indicate where the tapers begin and the taper length.
Need to show the right turn lane and how the striping will need to be done for that It
should probably be a different detail since it will be done with a later phase-
• ' How the striping should be done for the phase 1 work should be shown and then for how
it should be done for the phase 4 work. This again may need to be done with separate
details/plans.
Need to show how the striping ties and transitions into the existing striping.
Trilby Road Existing Conditions
*** Curb and gutter should be provided along Trilby Road and no swale should exist between
the curb and walk.
• Is the grading to be done in phases or all at once? Erosion control estimates should reflect
any phasing so that an amount for the entire site doesn't need to be deposited.
• Lot lines in certain areas don't necessarily reflect what is shown on the other plans.
* * * The sidewalk on Shields Street north of both entrances needs to be moved over to
accommodate the future right turn lanes.
• Some of the path locations differ from what is shown on the landscape plan. In particular
the path near the corner of Trilby and Shields.
*** Off site easements will be needed for the grading work on the east side of Shields Street.
• Sheet 71 has the wrong area shown on it.
Drainage Plan, Sheets 72 - 80
• Easements are needed for all the swales shown. Not all have easements shown for them
now
• some of the sidewalk locations are shown sitting on top of the swales.
• Swale section AA - where does the sidewalk go as in swale 9_
Culverts, plans and profiles, sheets 81 - 82
• Culvert 19 will need to go to the curb and gutter.
*** Can culvert 51 be built without getting onto the property to the east?
Storm Sewer lines, Plan and Profiles, sheet 85
• Don't need interim storm sewer line 1 as curb and gutter should be put in with this
project.
General Details, sheet 92
• The new sidewalk ramp details need to be used, see attached for new details.
• On the street intersection approach details indicate what the transition length for crown
removal is based on your design.
• If traffic circles (medians) are used the detail for outfall curb and gutter is needed.
• Provide detail D-25 Asphalt paving at crosspans.
Off -site Arterial Street Improvements
Cover sheet
• Correct mistakes in the General notes and add note regarding stripping. See above for
wording of note.
Shields Street Existing Conditions
Label the existing edge of ROW.
Label all items going under the roadway.
Shields Street Plan and Profile
Indicate what grade you are tying into.
There are some irrigations structures and other items being shown in the path of the
� detached bike/ped path. How does this interact with the path, are modifications needed?
The design of the vertical curves need to meet the requirements for the stopping sight
distance_ If there is some reason why you are unable to do so please discuss this with me.
Arterials should be designed for a 50 mph speed (This applies to the design of both
Arterials.)
** The curb return at the corner of Shields Street and Trilby Road needs to be built with this
project.
1 Label the existing Row and the street intersecting the road.
The overhead power line is shown just ending. Does it do that/
Is the line that is shown running down the middle of the road existing? (I think it is the
sewer line) If it is not existing it really shouldn't be shown on the sheets that say existing
conditions
-
>lilbv Road Interim Plan and Profiles
What is the slope of the road at the point you are tying in? Is a transition needed to get
back to the existing width.
Label the ROW line.
The south edge needs to be the flowline profile as the curb and gutter will be built on the
south side with this project.
• Will the design of Trilby Road east of Shields Street work with the preliminary design that
RBD did for the future overpass? (Part of the Ridgewood Hills l st filing plans)
*** On the cross, sections - A 6 foot bike lane needs to be provided on both side of the road.
It is not acceptable to provide a combined bike path/walk. Therefore a 5 foot walk only
need to be provided. The curb and gutter needs to be built on the south side.
Trilby road interim Grading Plan
* No swale shall exist between the curb and the walk.
*** Provide any necessary off site easements
Trilby Road intern cross sections
Indicate what the slope of the road is at each cross section. If it is always 2.0% indicate
that and call it out as typical Want to know if the slope varies and how it varies-
%• Is this all new construction? Does any milling need to be done? Are portions an overlay?
Need to indicate what is to be done and how this is to be constructed.
•_ Make sure the cross sections accurately show what is to occur and that the sections that
go through where the roads intersect reflect that.
* * Show the curb and gutter in the cross sections-
*** Along the off -site work you are still showing a Row width of 80 feet. Does the 50 feet of
Row on the south side exist or is it being dedicated with this project? If it doesn't exist
the Row will need to be dedicated and deeds of dedication provided. This will need to be
done prior to the property being given or purchased by the City. Slope easements will
also be needed for the slope of the road that extends past the Row_
*** Showing a side slope of 3 1 is this stable? Typical require a slope of 4:1 or flatter_ Is this
the only location that this occurs? Need to provide us with enough information to clearly
indicate that this is a stable slope and can support the roadway.
Trilby Road interim striping plan
• Need to show how the striping connects with the existing striping and how the center turn
lane transitions out (at the west end).
• Indicate the location of the transition beginnings and the transition lengths.
• Show the Railroad crossing location - I don't imagine the striping will be carried over the
tracks_
• Contact the Transportation Department for questions regarding striping.
Shields Street Arterial plan And Profile
Need dedicated right turn lanes designed southbound onto Truxtun Drive and Bon
Homme Richard Drive.
-site design needs to be shown for
How does the design tie into the existing grades" A off
an adequate distance to show that it works As mention in previous comments per
1,02 03 06 'The grade and ground lines of all Arterials shall be designed to continue a
1000 feet beyond the end of proposed construction'
-
Shield Street Arterial Cross Sections
• Basically see previous comments on cross sections
Shields Street Arterial Striping plan
• Show designated right turn lanes.
7 rilby Road Arterial Plan and Profile
*** ' How does the design tie into the existing grades" A off -site design needs to be shown for
an adequate distance to show that it works. As mention in previous comments per
1.02.03.06 'The grade and ground lines of all Arterials shall be designed to continue a
1000 feet beyond the end of proposed construction'.
*** Trilby Road Cross section- Both bike lanes need to remain on the roadway per the latest
discussions with transportation and that cross section will not work within the 100 of
Row Trilby Road is currently proposed to be a minor arterial with the new street
standards. This has yet to get through City Council. It is scheduled to go in late August.
If it become a minor arterial this will solve your problems as far as fitting the cross
section into the ROW without requiring additional ROW to the north, but we have to go
with the current master street plan until a change is approved. If you want to wait and see
if it is approved that is an option; otherwise you need to look at other options as
mentioned in prior comments- Any ideas should be discussed with Eric Bracke and
myself We can certainly try and meet to discuss this prior to any submittal.
Trilby Road Arterial Cross Sections
• Basically see previous comments on cross sections
Details
• Provide Detail D-20 additions to existing walk.
• The sidewalk ramp details need to be the new approved ones - see details attached.
REVISION
y;
Y COMMENT SHEET
DATE: November 7, 2000 DEPT: ENGINEERING
PROJECT: 932-95F Registry Ridge PUD, 2nd Filing - LDGS
All comments must be received by Steve Olt no later than the staff
review meeting:
November 29, 2000
❑N mment
0 Problems or Concerns (see below or attached)
Registry Ridge PUD, Second filing December 7, 2000
Make the changes shown and mylars can be submitted. We need the revisions to the first filing
for the utility connections submitted at the same time or prior to this submittal.
Ut'lity Plans
1 �a 11 of the utilities within the streets (excluding Enterprize) are shown as existing. The first
filing plans have not been modified to add these service connections in. This needs to be done.
Any connections in these streets that have to be done after the street is paved will require the
overlay of the entire street. Plan for this or get all of the utility stubs and connections on the first
filing plans, approved and in before the streets out there are pave1""We need these revision
submitted reviewed and approved before this plan set can be approved.
2. Need to show the: bike lane/ parking lane striping that needs to be done with this project. It is
only this line that is to be striped. I have shown it on the plan and profile sheet.
3. Make changes to the Enhanced crosswalk detail as shown.
4. Fill out and return "information for development agreement sheet" and I will start the DA
upon receipt.
5. 1 have also attached a Devlopement Construction Permit Application. This will need to be
filled out and returned before a development construction permit meeting can be held. Please let
me know if you have any questions regarding this process.
Date: Signat i�
Please send copies
of marked revisions
_Plat _Si.te
_Utility _Landscape ❑ NO COMMENTS — SUBMIT MYLARS
`r
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current PlanninP
/gel /9�, M APPiA1c1
DATE: DEPT: Enginrering--
PROJECT: j� 66tS'C(Z.y
PLANNER: rlv\ ., wait
ENGINEER: &%L �
Cr,m 8 B�Z119K
eNo Problems
Problems or Concerns (see below or attached)
L.
qKd
�;w w;�i1s 64euld
�e show v
C TAC
I d'?
41 �e �Ftr� v� WvnWVJq 7�Dt• 15 1Mi55 vi ci.
Jr. eg4j)) �e Sc v'i� i o�II Ce)vev
be4ryda ry ay. � S�tce75.
B. D, .;.... u9 revt.q o'er "o-� t C Q j ELC�
Date: - Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY
❑ LANDSCAPE
Comments continued from the previous page...
Sheet 2 of 2: Final Plat
• Provide either a match line or make sure that the site is on one page instead of splitting it
up.
• Label the adjoining properties.
• Show R.O.W. dimensions on all of the public streets.
• Need to show 2 ties to the section corners.
• Missing a few of the bearings.
Sheet 2 of 7: Preliminary Overall Utility Plan
• Show the other side of Bon Homme Richard Drive with all of the accesses.
• The nose of the medians at the entrances need to be a minimum of 20' back from the
flowline of the intersecting street. This is stated in the current street standards.
• You need to provide handicap access ramps at all of the pedestrian crossings.
• The handicap access ramps and pedestrian crossings around the traffic circle need to be
out of the travel lanes.
• Make sure that the travel lanes of the accesses to the site align with the travel lanes of the
streets directly across from them.
• Provide a sidewalk in the traffic circle median.
• Need to see a design of the traffic circle and how it is going to function. Take into
consideration the site distances.
• Provide a connection on the north side of the property off of Tnixtun Drive and align it
with the street shown to the north. See plans for the approximate location.
• The detached sidewalks need to meet the standards when approaching an intersection.
• I'm concerned with the design of the gas station. It appears that the entrance is too small
for a semi -truck to get in and out effectively. Please provide more information and prove
that this will work.
Sheet 3 of 7: Preliminary Overall Utility Plan
• Show the other side of Bon Homme Richard Drive with all of the accesses.
• The nose of the medians at the entrances need to be a minimum of 20' back from the
flowline of the intersecting street. This is stated in the current street standards.
• You need to provide handicap access ramps at all of the pedestrian crossings.
• The handicap access ramps and pedestrian crossings around the traffic circle need to be
out of the travel lanes.
• Make sure that the travel lanes of the accesses to the site align with the travel lanes of the
streets directly across from them.
• Provide a sidewalk in the traffic circle median.
Comments continued on the next page cw
10, S wi 1 � I p eed 40 See t� ls- /FiC4 Se ue Ya �(� JOLYS
%,e't , i � i S �o be Yz c d rclecl AbSe 7 i� a i
1�' 4 atiAj eyrDrS qy� Go YYec4L. ,
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE:�)(���� DEPT: Engineering
PROJECT: ` " '6 !�,6�
PLANNER
ENGINEER:
No Problems
Problems or Concerns (see below or attached)
Registry Ridge, 1" Filing PUD August 16, 1998
Site Plan
• The plat shows a different West boundary line than is shown on the Site plan or the
Utility plans.
• The Lot numbering is being shown differently on the Plat than the Site plan and the
Utility plans. The Site and Utility plans appear to match. The Tract lettering on the Site
plan also does not match. The Utility plans appear to match.
• The Utility plans only show two phases not five.
• Show the other sight distance easements that are needed.
• The contours being shown on the Site plan do not match the Utility plans.
• Project notes need to be modified to reflect the proper lot numbering and tracts
see additional comments on plans
Plat
(many of these comrrients were given July 96 and March 97)
i Note 5 shall be modified to read as follows: 5. Tract B is.to be used as shown on the Plat
and is to be owned and maintained by Peace with Christ Lutheran Church, a Colorado
non -Profit Corporation, heirs, successors, grantees or assigns.
(Continued on next page) ��"�,
Date: Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: PLAT
SITE
LZII, UTILITY
❑ LANDSCAPE
Registry Ridge, 1" Filing PUD (page 2 of 3) August 16, 1998
Plat (continued)
If the Church does own Tract B and it is being plated they will need to sign the plat as a
owner and interest. If they don't own it yet it may be better to address this as note 6 does.
Cause what happens if they don't buy it or they eventually sell it.
Add the following note: 7. Lots 64. 70, 71, 76 , 77, 113, 119 shall not have access off of
Ranger Drive. Access shall be taken off of the local street adjacent to the lot.
Add the following note: 8. Lots 9, 10, 26, 27, 38, and 39 shall not have access off of
Wainwright Drive. All access shall be taken off of the local adjacent street.
' • Add the following note: 9. All lots within this development have frontage on a public
street and in accordance with the City Code property owner(s) are responsible for
maintaining the Right-of-way exclusive of the public street. Lots 64 thru 68, 79 thru 81
have multiple street frontages adjacent to each of said lots and, as a result and in
accordance with City Code, the owners of said lots are responsible for the maintenance of
all street frontage(s) adjacent to each of said lots.
Add the following note: 10. All Landscaping placed in medians/ traffic circles within the
right-of-way shall be maintained by the Homeowners association.
Add the Sight Distance Easement Restrictions to the plat:
SIGHT DISTANCE EASEMENT RESTRICTIONS
The area within sight distance easements is restricted to the following.
Fences shall not exceed 42" in height and shall be of open design. If fences
exceed 32" in height, they shall be constructed of split rail with a minimum
dimension of 12" between horizontal members.
2. Berms, hedges, and shrubs shall not exceed 32" in height.
3. Tree planting shall be restricted to deciduous trees only. The lowest branch of
any tree shall be no less than 42" from grade.
(•'� The water district and the tri-state electric need to sign the plat. Unless these are existing
easements and if they are reception numbers need to be provided.
The lot numbering being shown on the plat does not match the site and utility plans. If
the numbering changes on the plat than the notes above need to be modified to reflect the
proper lot numbering.
•� Provide the current attorney certification paragraph.
Note 4 indicates easements along Ranger are also suppose to be landscape easements - is
this still true? Also Ranger no longer goes to Trilby.
yam. Label the street widths.
• i All ROW for the Shield Street improvements needs to be dedicated. Why not do that
with the plat. Include this property within the platted boundary rather than having to do it
by separate documents.
• I Show the easements needed on the areas not being platted and indicate that these are to be
provided by separate documents.
(Continued on next page)
Registry Ridge, 15` Filing PUD (page 3 of 3) August 16. 1998
Plat (continued)
Indicate the utility easement widths and types on the individual sheets.
•_ Need to exclude the area where the club house and the pool are to be on Tract G from the
easements. No building permits will be issued on top of an easement.
ON SITE PLANS
• Plan sheet numbering should include the plat and any other sheets even if they are just for
reference.
• Indicate the sidewalk width on Shields Street on one of the sheets.
See where sidewalks and ramps are being shown on the site plan and have not been
included on the utility plans.
The plat shows a different West boundary line than is shown on the Site plan or the
Utility plans.
The Lot numbering is being shown differently on the Plat than the site plan and the utility
plans. The Site and utility plans appear to match. The Tract lettering on the site plan also
does not match. The utility plans appear to match.
Show all sight distance easements that are being platted.
• The sidewalk, curb and gutter need to be extended to the West property line along Trilby.
An escrow of funds will not be accepted for this. We would possibly consider taking a
cash deposit for this work, though.
• Off site grading on Trilby is being shown differently on the on -site plans and the off -site
plans. Comment on the off site plans was that the work would be done with the first
filling and that is where it is shown. The off sites will also need to be done with the first
filing. Stormwater and street improvements will need to be done at the same time.
OFF SITE PLANS
• Trilby Road adjacent to the site - showing a center turn lane past Wainwright on the
striping plan. This is not being reflected in the grading plan or the profile for this street.
As shown on the striping plans adequate lane widths are not being provided.
• Existing striping and existing edge of pavement needs to be shown to the west of the
proposed improvements for Trilby. This will determine if additional transitions are
needed - no kinks in the striping should exist here - need to tie smoothly in.
• Off site grading on Trilby is being shown differently on the on -site plans and the off -site
plans. Comment on the off site plans was that the work would be done with the first
filling and that is where it is shown. The off sites will also need to be done with the first
tiling. Stormwater and street improvements will most likely need to be done at the same
time. The swale design and new grading should be shown in the cross sections.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: DEPT: ENGINEERING
PROJECT: kpol JIM I IS+ +- t I i
Registry Ridge PUD June 12, 1995
- All off site easements and Row documents need to be received, checked (by City) and money received for filling
fees prior to Engineering signing the Utility Plans. I have received one signed drainage easement for this project,
but it does not have a sketch. (For off -site drainage area north of Trilby)
- No site plan was received with this submittal, therefore the plans can not be checked against them.
- A variance request for the traffic circle needs to be submitted along with the layout showing that it accommodates
a SU-30 vehicle.
- No Plat was received so I do not know if the conflicts that existed between the plat and the plans have been
resolved.
On Site Plans
• The grading plans are now showing the grading to be done on the third filing area also, but they are not
complete. There is not a shect showing the proposed grading tying into the existing. If all the grading is to be
done than the street plans need to be modified so that they accurately show how the street and the grades tie
together.
• On the striping plans add the stop signs and a few other signs onto the plans.
Off Site Arterial Street Improvements
Trilby Road -
• 'Che grading plan and the sections do not seem to correspond as far as the grading to the south of the road.
On the striping plan
• Show the existing striping and edge of pavement at the west end of the property.
• Do not show any cross hatching (of the bike lane) on the north side of the road and the cross hatching shown on
the south side of the road, for the transition, needs to be done in white not yellow.
• Before the west bound bike lane ends a sign needs to be placed that states `BIKE LANE ENDS BIKES
MERGE WITH TRAFFIC'.
• 'Fhe redirect taper, just south of Wainwright needs to be 250 feet in length (a 25: I taper is required, 10 foot off-
set)
See Plans for additional comments
Date: �� SignatureL'��,-244
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS:
><Plat X Site Drainage Report _ Other
Xutility _,a<jRedline Utility v andscape
Transportation Services
lEngincering Department
City of Fort Collins
April 7, 1999
Rusty McDaniels
Larimer County - Engineering
P.O. Box 1190
Fort Collins, Co 80522
RE: Registry Ridge PUD, I" Filing
Dear Rusty,
I have reviewed the comments provided, dated March 18, 1999, for the Registry Ridge off -site improvements. The
following is the City comment/ response to the comments made by the County in the above mentioned letter.
1) A temporary signal has been installed at the intersection of Trilby and Shields. I believe that the intent is for
the permanent signal to be installed after the improvements, required by this project, are completed.
2) The developer was not asked to evaluate the intersection of County Road 19 (Taft Hill) and County Road 34
(Trilby) for the traffic impact study. It was felt that the traffic impact to this intersection by this project would be minimal
as the majority of traffic from this site would be going North, South, or East. In fact Figure 4 of the June 1995 traffic
study indicated that only 10-15% of the site traffic would be traveling on this section of roadway. I am also attaching
copies of the traffic study and all addendums that have been received for this site for your reference. These may help
with some of your concerns,.
1) 1 agree with you the culverts shown on the plan sections should be shown on the profiles. This comment has
been forwarded onto the applicant.
2) 1 have checked the grading for the side streets and the driveways based on what has been shown on the plans
and feel that the grading shown will work.
3) All of the tapers with the exception of the taper on Shields Street at Fossil Creek Drive should be designed
for the speed limit of the road. There had been some discussion that the county might reduce the speed limit on Shields
Street. I had told the applicant that if the speed limit was to be reduced the tapers could be designed for the reduced
speed limit. As I have not received any verification of this occurring from the county or the applicant the tapers should
be designed in accordance with the posted speed limit. This is with the exception of the taper on Shields Street at Fossil
Creek Drive, as the taper shown is what is existing and no change to the intersection is being made by this development,
it was not felt that we could ask this project to fix an existing problem.
4) The county recommends against having PI's in the flowline at the right turn lanes entering the subdivision off
of Shields. The City does not have criteria that would require the use of curves and is not going to ask for the change at
^_�l N'nrlh dlcgc A%rnuC • P.O_ Boy 580 • Pest Collins, CC) 80522-01,80 • (970) 121-6605
this point in the review process.
5 and 6) The tie in to the existing road, on Shields Street, at the southern end of the property would need to be
as you have shown due to the new Street Repair and Reconstruction Standards and Guidelines. A design for a 1000 feet
to the south has also been requested ( a past comment by the City that has not been addressed)
7) As there is no place to turn into on the east, off of Shields, it would make sense to have the striping as you
have shown. The striping was reviewed by City traffic engineering and they had no problems with the way it was shown,
but that does not mean that it couldn't be changed to better reflect turning movements. As for Trilby, with driveways
located on the north, the continuous center turn lane would allow those residents to use the lane to turn into their
property as necessary.
8) A detail of the intersection of Shields and Trilby, with elevations in accordance with detail D-18, should be
provided.
9) The City agrees with you that Trilby between stations 23+1 1 and 30+40 should not transition/ taper in
(narrow), but stay consistent. There does seem to be a discrepancy in the documents they have provided as the plan
views show this occurring, but the pavement does not transition in on the x-sections. In fact the pavement is shown to
widen out at the west end of the property. This discrepancy will need to be addressed. By continuing this pavement
width the bike lanes can be transitioned closer to the western limits of construction.
10) Per figure 3 of the traffic study amendment, dated September 11, 1996, the long range right turning
movements into the site off of Trilby are 35 trips in the am and 25 trips in the pm peak hours. It was determined that
these volumes would not require a dedicated right turn lane into the site. Copies of the traffic study and addendums are
provided for your reference.
I I ) The traffic study does not show the need for an east bound right turn lane at the intersection of Trilby and
Shields Street. This may be a need in the future, but it is not a need of this development and as such we can not require
this development to dedicate the row for a right turn lane. At the time such a turn lane would be needed the City
would need to purchase and build this turn lane as it would be an all City need.
12) The profile for Trilby road should take into account the skew of the railroad tracks and the profiles should
be adjusted accordingly.
Thank you for your comments. If you have any questions on my responses to your questions or you need additional
information, please call me at 221-6750.
Your comments and redlines will be forwarded onto the applicant.
Sincerely,
Sheri Wamhoff
Civil Engineer II
cc: Cam McNair, City Engineer, City of Fort Collins
Bill Gleiforst, Traffic Services Supervisor, Larimer County Engineering department
Bud Curtis, P.E., Northern Engineering Services
file
PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannine
DATE: DEPT: Engineering
PROJECT it
PLANNER.
ENGINEER: Sheri Wamhoff
No Problems
Problems or Concerns (see below or attached)
Registry Ridge, l s` Filing PUD (sheet I of 3) March 29, 1999
A site plan was not received, but these were the previous comments on the site plan.
• The plat shows a different West boundary line than is shown on the Site plan.
• The Lot numbering is being shown differently on the Plat than the Site plan and the
Utility plans. The Site and Utility plans appear to match. The Tract lettering on the Site
plan also does not match. The Utility plans appear to match.
• The Utility plans only show two phases not five.
• Show the other sight distance easements that are needed.
• ,I'he contours being shown on the Site plan do not match the Utility plans.
• Project notes need to be modified to reflect the proper lot numbering and tracts
Plat
(many of these comments were given July 96 and March 97)
• Note 5 shall be modified to read as follows: 5. Tract B is to be used as shown on the Plat
and is to be owned and maintained by Peace with Christ Lutheran Church, a Colorado
non -Profit Corporation, heirs, successors, grantees or assigns.
• If the Church does own Tract B and it is being plated they will need to sign the plat as a
owner and interest. If they don't own it yet it may be better to address this as note 6 does.
Cause what happens if they don't buy it or they eventually sell it.
• Add the following note: 7. Lots 64, 70, 71, 76 , 77, 113, 119 shall not have access off of
Ranger Drive. Access shall be taken off of the local street adjacent to the lot.
Continued on next page) ! ;
ate:
Signature:
PLEASE, SEND COPIES OF MARKED REVISIONS: O—PLAT
O--SITE
�- UTILITY
-LANDSCAPE
Registry Ridge, V Filing PUD (sheet 2 of 3) March 29, 1999
Plat comments (continued)
• Add the following note: 8. Lots 9, 10, 26, 27, 38, and 39 shall not have access off of
Wainwright Drive. All access shall be taken off of the local adjacent street.
• Add the following note: 9. Lots 1 and 33 shall not have access off of Truxun Drive. All
access shall be taken off of the local adjacent street.
• Add the following note: 10. All lots within this development have frontage on a public
street and in accordance with the City Code property owner(s) are responsible for
maintaining the Right-of-way exclusive of the public street. Lots 64 thru 68, 79 thru 81
have multiple street frontages adjacent to each of said lots and, as a result and in
accordance with City Code, the owners of said lots are responsible for the maintenance of
all street frontage(s) adjacent to each of said lots.
• Add the following note: 11. All Landscaping placed in medians/ traffic circles within the
right-of-way shall be maintained by the Homeowners association.
• Forestel Drive is incorrectly labeled as Permit Drive on sheet 5.
• The water &strict and the tri-state electric need to sign the plat. Unless these are existing
easements and if they are reception numbers need to be provided.
• The lot numbering being shown on the plat does not match the site and utility plans. If
the numbering changes on the plat than the notes above need to be modified to reflect the
proper lot numbering.
• Provide the new plat language (attached) and current attorney certification paragraph.
• Note 4 indicates easements along Ranger are also suppose to be landscape easements - is
this still true? Also Ranger no longer goes to Trilby.
• Label the street widths.
• All ROW for the Shield Street improvements needs to be dedicated. Why not do that
with the plat. Include this property within the platted boundary rather than having to do it
by separate documents.
• Show the easements needed on the areas not being platted and indicate that these are to be
provided by separate documents.
• Indicate the utility easement widths and types on the individual sheets.
• Need to exclude the area where the club house and the pool are to be on Tract G from the
easements. No building permits will be issued on top of an easement.
• The plat shows a different West boundary line than is shown on the Site plan or the
Utility plans.
ON SITE PLANS
• Plan sheet numbering should include the plat and any other sheets even if they are just for
reference.
• Some midblock sidewalk ramps need to be shown.
• The plat shows a different West boundary line than is shown on the Utility plans.
• The Lot numbering is being shown differently on the Plat than the site plan and the utility
plans. The Site and utility plans appear to match.
• Show all sight distance easements that are being platted.
• The sidewalk, curb and gutter need to be extended to the West property line along Trilby.
An escrow of funds will not be accepted for this. We would possibly consider taking a
cash deposit: for this work, though.
(Continued on next page)
Registry Ridge, 1" Filing PUD (sheet 3 of 3) March 29, 1999
On site plans comments (continued)
• The Utility plans only show two phases, the site plan had showed five.
• On sheet 1 add note indicating that individual easements within filing 3 are not being
dedicated with filling 1. They will be dedicated at the time th3e plans for filling 3 are
approved.
• The variance request for the traffic circle was reviewed and it needs to be modified as
such - the traffic circle should have a flowline radius of 21 feet with a 3 foot concrete
truck apron. This can be a drive -over curb with per say a 3 foot attached sidewalk or
• some elevation on the plans don't match those shown on the profiles.
• modify the details as shown on the plans
OFF SITE PLANS
• On sheets 8 and 9 - which elevation is the correct one?
• Provide detached sidewalk detail, for detached - detached and detached - attached. Don't
need the attached walk detail.
• I have circled the areas on the plans where easements are needed and they have not been
identified on the easement information provided.
• Need to provide arterial design for 1000 feet off -site to the west for Trilby and to the
south for Shields. (10.30.96)
• Is the road construction all new construction? Is any milling needed? Any of it an
overlay? Need to indicate what is to be done and how the roads are to be constructed.
Will need traffic control plans for the Development Construction Permit meeting.
• Show all culverts in the profiles (lcc)
• Tapers on Shields and Trilby need to be designed in accordance with the posted speed
limit. Since we have not received any documentation or confinnation of a plan to reduce
the speeds on Shields Street the taper designs need to be 50:1 for 55 mph. I had written
down that the speed limit on Trilby is 35 mph, if this is correct ( I didn't have a chance to
go out and check this yet) the tapers should be designed at 25:1. If it is not correct the
tapers should be designed in accordance with the posted speed limit.
• Trilby road is shown to taper in between stations 23+11 and 30+40 on the plan views.
Do not taper the road in keep the north edge of the road consistent and taper/ transition
the bike lane out closer to the west edge of the property. The taper in is not shown in the
x-sections in fact the cross sections show the road staying consistent width until station
27- 00 where it widens out as it approaches the western property line. This is all shown
to be accomplished within the existing row therefore there should be no trouble keeping
the north edge of the pavement consistent. Please make sure that the x-section and plan
design match.
• Need to accurately show the railroad x'ing in the profiles.
Going thru the off -,site easement list I have highlighted the easements listed that are not on the
exhibit plan. I have also listed a few easements that were on the plan and not on the list. On the
back of this sheet I have also listed the additional row and easements that I feel are needed that
have not been identified on this list or on the exhibit.
Please see county letter and redlines as well as City response letter for additional comments and
concerns.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 28, 1997 DEPT: Engineering
PROJECT: #32-95 Registry Ridge P.U.D. - Preliminary
(LDGS)
PLANNER: Mike Ludwig
All comments must be received by: Wednesday, April 23, 1997
REGISTRY RIDGE P.U.D. - GENERAL COMMENTS:
Sheet I of 7: Cover Sheet
• Modify a few of the general notes.
• Add the notes which are attached to the redlined plans.
• Include the project bench marks (2) from the "Black Bolt Survey" book.
Sheet I of 2: Final Plat
• Provide either a match line or make sure that the site is on one page instead of splitting it
up.
• Label the adjoining properties.
• Show R.O. W. dimensions on all of the public streets.
• Need to show 2 ties to the section corners.
Comments are continued on the next page cw
� ( - '1� --
Date: H- zs- 9l Signature (Q
CHECK IF YOU WISH TO RECEIVE ® PLAT
COPIES OF REVISIONS ® SITE
® LANDSCAPE
UTILITY
Comments continued from the previous page...
The detached sidewalks need to meet the standards when approaching an intersection.
Sheet 4 of 7: Preliminary Grading and Erosion Control Plan
For the off site grading, you will need to acquire construction easements, for the grading.
Show the existing grade contours and how the proposed contours tie-in.
Sheet 5 of 7: Preliminary Grading and Erosion Control Plan
For the off site grading, you will need to acquire construction easements, for the grading.
OTHER ISSUES:
• Refer to the redlined plans for additional comments.
• Please prrovide a sheet identifying all of the details used in the plan set.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 28, 1997 DEPT: Engineering
PROJECT: #32-95 Registry Ridge P.U.D. - Preliminary
(LDGS)
PLANNER: Mike Ludwig
All comments must be received by: Wednesday, April 23, 1997
REGISTRY RIDGE P.U.D. - GENERAL COMMENTS:
Sheet 1 of 7: Cover Sheet
• Modify a few of the general notes.
• Add the notes which are attached to the redlined plans.
• Include the project bench marks (2) from the "Black Bolt Survey" book.
Sheet 1 of 2: Final Plat
• Provide either a match line or make sure that the site is on one page instead of splitting it
up.
• Label the adjoining properties.
• Show R.O.W. dimensions on all of the public streets.
• Need to show 2 ties to the section corners.
Comments are continued on the next page ev
i
Date: q-cs-9"1 Signature V�f
CHECK IF YOU WISH TO RECEIVE ® PLAT
COPIES OF REVISIONS SITE
0 LANDSCAPE
UTILITY
PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannint
DATE:��`f���i ! DEPT: Engineering
PROJECT:
PLANNER: ENGINEER:
No Problems
Problems or Concerns (see below or attached) gF
Registry Ridge - Final plan review
In General
No site plan was received with this submittal, therefore the plans can not be checked against them.
A variance request for the traffic circle needs to be submitted along with the layout showing that
it accommodates a SIJ-30 vehicle.
Plat
l . See comments on plans regarding notes.
2. Provide reception numbers for existing easements.
3. Provide 68 feet of row for Wainwright at Trilby in accordance with plans.
4. Easements and width need to also be labeled on the plans.
5. All the Row for Shields Street needs to be dedicated, it is needed for the improvements.
6. Show easements needed on the areas not being plated and indicate by separate document.
7. Clarify the separation of utility and utility and drainage easements.
8. Need to exclude the area where the club house and the pool are to sit on Tract G.
9 See plat for additional comments. Their are also comments on plat and plans indicating where
there are conflicts between the two documents.
(Continued on next page) _
z:-r � 7
Date. Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT