Loading...
HomeMy WebLinkAboutREDWOOD VILLAGE PUD - Filed GC-GENERAL CORRESPONDENCE - 2005-06-14CITY OF FORT COLLINS ENGINEERING SERVICES July 2, 1984 Jay K. Jacobson Redwood Venture 7950 East Prentice Avenue, Suite 200 Englewood, Colorado 80111 Re: Redwood Village Dear Jay, The public right-of-way improvements installed in conjunction with this subdivision have been inspected and initially accepted by the City pending the contractor's one-year warranty period. This includes water main, sanitary sewer mains, street construction, street lights and street signs. Please be aware this acceptance does not relieve the developer or his contractors of their responsibility to repair any damage which may occur through the construction of homes or future utilities. Sincerely, David Stringer Chief Construction Inspector r CITY OF FORT COLLINS ENGINEERING SERVICES May 25, 1984 Mr. Jay K. Jacobson B&J Energy 7950 East Prentice Avenue, Suite 200 Englewood, Colorado 80111 Re: Redwood Village PUD Dear Mr. Jacobson: As you requested, I am sending you this letter to confirm what off -site drainage improvements will be required for the 1st Phase of Redwood Village. Attached please find a copy of a letter from Robert L. Lenz dated December 8, 1.982 requesting a variance to detention requirements for Phase I. In the letter he indicates runoff will be routed to the existing detention pond in the eastern corner of the site. The pond has already been excavated and all that will be required is to construct the open channel shown on Sheet 5/5 of the Utility Plans to the pond. Please feel free to call me if you require additional information. Sincerely, � . c _ �f Philip G. Waite Civil Engineer II Storm Drainage Attachment cc: Dave Stringer, Chief Construction Inspection �d FTf FP7[;INFFPiNf; SFRWTS V af] I ;iPnrte Avr • PO Bo+ °Mn . Furr ['.nlhn,, Cnln�ado, tiDS:•3 l ( UY(li [' 7 011INS ENGINEERING SERVICES January 16, 1984 P.O. Box 5 Dan Kehn Kehn Construction Company 6322 South College Avenue Fort Collins, Colorado 80525 Dear Dan: Collin" Colorado BUSTL Re: Redwood Village PUD, Phase I This is to inform you that the sanitary sewer mains and water mains installed to date by your firm in Redwood Village P.U.D., Phase I, have been inspected and accepted by the City pending the normal contractor warranty period. It should also be noted that I have inspected all manholes and water gate valve boxes at this time and found all to be in place, free of debris, accessible and in good repair. Sincerely, Rodney R. Albers Construction Inspector cc: Chuck Kane Redwood Ventures -4220 Ext.723