HomeMy WebLinkAboutRAMS PARK PDP - Filed CS-COMMENT SHEETS - 2005-06-13REVISION
COMMENT SHEET
DATE: September 21, 2000 TO: Tech Svs
PROJECT: # 12-00 Rams Park — PDP - Type II- LUC
All comments must be received by Ron Fuchs in Current
Planning no later than the staff review meeting:
Wednesday, October 11, 2000
❑ No Comment �1L"
ElProblems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE**
�, PLR7 � LEGAL CW.�,
7
Z rn c: a Tf-f / (- /-Ir
S i :�TcNt � tiT,
Si�-(�- L).'A,,,e- s Cu'1-2
T-t-kQ�- TaAcr A
Datc:
Signature:
CHECK HERE IF YOU WISH TO RECIPE COPIES OF REVISIONS
'4�iat Site _ Drainage Report Other
Utility Redline Utility Landscape
4 / 4n
(M�492
City of Fort Collins
♦ Please add the following note:
All streets cuts, curb & gutter and sidewalk removal, and the repair & reconstruction of the
aforementioned shall be done in accordance with the city's "Street Repair and Reconstruction
Standards and Standards and Guidelines'. The city inspector and/ or the City Engineer shall have
final authority in regard to the limits of the street repair.
♦ Please show all existing access points on the south side of West Elizabeth Street.
♦ All overhead utilities will have to be buried in accordance with Section 3.3.2(D)(7) of the Land Use
Code.
Grading and Erosion Control Plan, Sheet 4 of 10.
♦ In accordance with Section 3.6.2(L)(2)(f) of the Land Use Code, the eastern driveway access shall
not allow drainage to cross the public sidewalk.
♦ The 2:1 slope for the detention ponds should be a minimum of 4:1. Please verify with the Stormwater
Utility.
♦ The grading at the northern property line will require offsite grading easements as shown.
Elizabeth Street Plan & Profile; Sheet 7 of 10:
♦ The cross slope for widening an existing street "... shall be a straight line grade from the crown to the
lip of new gutter adjacent to the new pavement" (Street Design Manual; Section 1.02.03.14d).
Also, please show the street cut and repair to the centerline of West Elizabeth Street.
♦ Please Zabel that the constructed curb and gutter is to be vertical.
♦ Cross section Comments:
a) Please show cross section every 50 feet.
b) The minimum allowable cross slope is 2.0%.
c) Please show the full cross section and label accordingly (see redlines for cross section I t+00).
♦ Please provide a signing and striping plan for West Elizabeth Street. Contact Ward Stanford or Eric
Bracke for the extend of signing and striping required.
♦ The soils report must be updated.
♦ Eric Bracke, Traffic Engineer, has provided the applicant with three options in regard to access into
this development. First, consolidate the curb cuts to one full movement and provide a cross access
through the KFC parking tot. Second, redesign the curb cuts and the parking tot configuration so that
the one-way drive aisle functions properly. Finally, provide a median to control access. (All options
will include shared access through the KFC parking lot). In addition, please address the
pedestrian crossing at Kim_ Soopers and/ or for the transit stop.
General Details: Sheet 10 of 10.
♦ The driveway detail should reflect what is being proposed (see other redlines).
Site and Landscape Plan Comments
♦ Please see redlined comments.
Plat Comments
♦ Please address comments from mapping and drafting.
♦ Please add correct Attorney's Certificate (see attachment).
♦ See other redlined comments.
Soils Report Comments
♦ A new soils report shall be submitted for this project.
Traffic Impact Studv Comments
♦ The traffic impact study is proposing that there are two accesses into the site with full movements.
As I understand it, if two access points are allowed they would have to function as right -in/ right -out.
In addition, the Project Unit Development plan for KFC showed or required a shared access between
this project and KFC. Please include this situation in the traffic study.
PROJECT
ire COMMENT SHEET
City of Fort Collins
Current Plannine
DATE: April
3, 2000
TO:
Engineering Pavement
PROJECT:
#12-00 Rams
Park
— Type II — PDP (LUC)
All comments must be received by Ron Fuchs no later than the staff
review meeting:
May 3, 2000
Note- Please identify your redlines for future reference
Yo cep )�2T�i CAA
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility RcdlincUtility _Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 21, 2000 DEPT: ENGINEERING
PROJECT: #12-00 Rams Park — Type II — PDP (LUC)
PLANNER: Ron Fuchs
ENGINEER: Mark McCallum
All comments must be received by:
Wednesday, August 16, 2000
General Comments
♦ See red Iined comments on all sheets of the utility. plat. site, and landscape plans. More specific
comments will be mentioned below.
♦ All Plans and Supplements Included:
I. Utility Plan
2. Site Plan
3. Landscape Plan
4. Plat
5. Attorney Certificate for the Plat
Utilitv Plan Comments
Cover Sheet, Sheet 1 of 12:
♦ Minor revisions to the "General Notes".
Overall Utility Plan, Sheet 3 of 12:
♦ Please show the access to the Jefferson Commons PUD (Rams Park).
♦ The eastern access should be a right -in only. Therefore, the driveway should be angled to
accommodate a right -in only. In addition. the parking stalls shoo be angled for the entire length of
the eastern drive aisle.
i
Date:
/� jC_ Signature:
PLEAS _ SEND COPIES -25-PLAT
OF MARKED REVISIONS:tAINDSCAPE
TE
ILITY El NO COMMENTS - SUBMIT MYLARS
♦ The driveway radii should be a maximum of 15 feet.
♦ Please show the widths for all sidewalks.
♦ All water and sewer lines should be in utility easements
Grading and Erosion Control Plan and Drainage Plan; Sheet 4 & 5 of 12:
♦ Provide cross sections or additional elevations to show how the internal walk/ drive intersection will
function. If necessary, provide access ramps.
♦ There are various offsite areas that will need construction, drainage, and grading easements. Letters
of Intent for all easements shall be submitted prior to public hearing.
♦ Please provide all retaining wall information. The retaining wall adjacent to the right-of-way shall be
set back 2 feet from the sidewalk.
Elizabeth Street Plan & Profile: Sheet 7 of 12.
♦ Provide wall information on the cross sections.
♦ Provide centerline stationing.
♦ The public sidewalk shall be a minimum of 6 feet.
Eli_abeth Street Signing & Striping Plan; Sheet 8 of 12.
♦ The signing and striping plan should be coordinated with the Engineering Department and the Traffic
Operations Department. It appears that the striping should be redone from Taft I fill Road to the
western property line of Rams Park. A meeting should be coordinated through me (Mark McCallum).
♦ I he eastern driveway access should be a controlled right -in only.
Site and Landscape Plan Comments
♦ Please see redlined comments.
Plat Comments
♦ Please address comments from mapping and drafting.
♦ The name on the plat should read:
Plat of Rams Park PDP — A portion of which is a replat of a portion of the Replat of Lot I of the
West Elizabeth PUD and also a portion the Northeast Quarter of Section 16...
♦ Provide a vicinity snap.
♦ Provide all necessary access, drainage and utility easements.
♦ This plat should have a lot designation.
♦ Provide a 15-foot utility easement along West Elizabeth Street.
♦ Correct the dedication and notice of other documents language.
♦ See other redlined comments.
Soils Report Comments
♦ A new soils report shall be submitted for this project. The reason for the new report is that the city
requires certain information in the soils report that is not in the old report. In addition, some
geological changes may have occurred since the last report. In lieu of providing a full report, one
option would be to do an updated or amended report. I suggest that you connect Rick Richter,
Pavement Management at 221-6605 to discuss the possibility of an amended report.
I
REVISION
COMMENT SHEET
DATE: July 21, 2000 TO: Technical Services
PROJECT: #12-00 Rams Park— Type II (LUC)
All comments must be received by Troy Jones in Current
Planning no later than the staff review meeting:
Wednesday, August 16, 2000
❑ No Comment
❑ Problems or Concerns (see below or attached)
"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE"
LeGAa- C
1; �c
.�
ST/-I %clS i L C j T/1 / /..� 7 /Y C'
T� /�-2�� � l`'
1 m C
�- - .u� 1
F ��4 i - _�c.-c'-/ 1 T
i }'T /fN L i ��JJ,o."J
t/�
r� � .��� ��Zo.�ii�� � Lei ✓� S �/ N /i-T�c�
Date: Signature:
CH#K HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Pit _ Site _ Dndnage Report _ Other
Utility _ Redline Utility _ UmdsW
w�� Z
DLl`/— CS12tfN t L, /� e vt9e
7i*, 5L P C P14 G
PROJECT
COMMENT SHEET
ia
Current Plannin"
DATE: April
3, 2000
TO:
Mapping/Drafting
PROJECT:
#12-00 Rams
Park
— Type II — PDP (LUC)
All comments must be received by Ron Fuchs no later than the staff
review meeting:
May 3, 2000
Note- Please identify your redlines for future reference
U, K, , `
Signature
CHECK HERE IF YOU 'XISH TO RECEIVE COPIES OF REVISIONS
Plat _Site Drainage Report _Other
_Utility _Redline Utility Landscape
go 0&
City of Fort Collins
PROJECT
i.... COMMENT SHEET
City of rort Collins
Current Planninlr
DATE: April 3, 2000 TO: Mapping/Drafting
PROJECT: #12-00 Rams Park — Type II — PDP (LUC)
All comments must be received by Ron Fuchs no later than the staff
review meeting:
May 3, 2000
Note- Please identify your redlines for future reference
l-- 00 i vT- y JC'(/ /PJv
C. r
Signature
CHECK MERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_-Plat Site __Drainage Report _Other
Utility Redline Utility Landscape
PROJECT
i.� COMMENT SHEET
City of Font Collins
Current Planning
DATE: April 3, 2000 TO: Street Oversizing
PROJECT: #12-00 Rams Park — Type II — PDP (LUC)
All comments must be received by Ron Fuchs no later than the staff
review meeting:
May 3, 2000
Note- Please identify your redlines for future reference
ac-r 7ul°cc �
7
1w9natury✓,
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report _Other
__Utility Redlinc Utility Landscape city of Pots cotu,v
PROJECT
COMMENT SHEET
City of Fort Colliins
Current Planning
DATE: April 3, 2000 DEPT: ENGINEERING
PROJECT: #12-00 Rams Park — Type II — PDP (LUC)
PLANNER: Ron Fuchs
ENGINEER: Mark McCallum
All comments must be received by. -
Wednesday, May 3, 2000
General Comments
♦ See redlined comments on all sheets of the utility, plat, site, and landscape plans. More specific
comments will be mentioned below.
♦ All Plans and Supplements Included:
1. Utility Plan
2. Site Plan
3. Landscape Plan
4. Plat
5. Attorney Certificate for the Plat
Utility Plan Comments
Cover Sheet, Sheet 1 of 10:
♦ Minor revisions to the "General Notes".
♦ Include the Plat in the Utility Plan as a separate document after the cover sheet.
Overall Utility Plan, Sheet 3 of 10:
♦ Please turn off the existing conditions, except for the existing utilities and roadway improvements on
all sheets of the utility plans.
♦ Show all internal access ramps on this sheet. I/
Date: tc= Signature:
PLEASE, FND COPIES PLAT
OF MARKED REVISIONS: SITE
UTILITY ElNO COMMEN"I S — SUBMIT MYLARS
LANDSCAPE