HomeMy WebLinkAboutRAMS PARK PDP - Filed GC-GENERAL CORRESPONDENCE - 2005-06-13))a-ue — r -�'T
G ,tion Services
Engineering Department
City of Fort Collins
January 13, 2000
Mr. Gino Campana
Bellisimo Construction, Inc.
7307 Streamside Drive
Fort Collins, CO 80525
RE: West Elizabeth Street Development Site
Dear Mr. Campano:
As we discussed on the phone this morning, there are several conditions that must be met in
order for the fill dirt that you imported onto this site to remain. First of all, let me remind you
again that our Land Use Code is quite clear. Sections 1.2.4 and 2.1.3(D)(2) state that
development of any site cannot occur before final plan approval, and stockpiling of fill material
is part of the definition of development. The letter, as well as the apparent intent, of the Land
Use Code is to restrict any development activity from beginning on a site before the final
development plans have been approved.
In some cases, this may seem too restrictive. I realize that there may be some situations where it
makes sense to allow a contractor or developer to take advantage of opportunities to obtain
available fill dirt. For this reason, we are initiating a process to seek a change in the Land Use
Code that would allow for a Minor Grading Permit. The decision on this will probably not
become final until May of 2000, and I cannot predict what that decision will be. I will, however,
commit to keeping :you informed as we go through this process.
In the meantime, I need to request a commitment from you. I believe I can take the risk of
allowing the fill on your site to remain, if you agree to the following conditions:
(1) No more fill dirt can be imported onto your site until the final plans are approved and a
Development Construction Permit is issued. Similarly, no other development activities can
occur on the site either, until the plans are approved.
(2) For the existing; stockpile of fill dirt, you are required to maintain erosion control measures
in accordance with instructions from our Stormwater Utility Department (Bob Zakely).
(3) Adverse impacts to adjacent property owners or complaints from the public may be grounds
for requiring the immediate removal of the existing fill dirt.
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
(4) You will make every effort to expedite the design effort, as well as the plans review and
approval process with the City, for the project that you are planning for this site.
Please signify your agreement with these conditions by signing below, and return one signed
copy to me.
I am also enclosing; with this letter a copy of Appendix Chapter 33 of the Uniform Building
Code, as you requested. This prescribes a procedure after which we may model our Minor
Grading Permit. I will be happy to discuss this with you further if you so desire.
Thank you in advance for your cooperation on this matter. I look forward to receiving your reply
to this.
Sincerely,
Cam McNair, PE
City Engineer
Attachment
cc: Transportation Operations
Stormwater
December 19, 2000
Troy Jones
281 North College Avenue
P.O. Box580
Fort Collins, Colorado 80522
'RE: Rams Park P.D.P.
Dear Troy:
VF Ripley Associates has reviewed the comments for Rams Park P.D.P. and
Major Amendment to West Elizabeth P.U.D. and we offer the following
responses: We have also attached responses to the other departments
comments in hopes that it will help to further clarify our responses. Items labeled
NORTHERN & LANDSTAR are for our internal use and reference the consultant
making specific revisions. These revisions have been shown to certain members
of City staff on October 23 and 26 of this year.
WaterMastewater:
1. Acknowledged -all separation distances have been finalized.
2. Northern
3. Northern
4. Northern
Engineering:
Utility Plan: NORTHERN
Site and Landscape redlines: addressed on site and landscape plans
Technical Services:
1-7: LANDSTAR-Acknowledged-changes to the dedication statement and
note 6 have been made
Zoning:
1. Acknowledged -see note # on sheet 1 of 1. We maintain that there will
be multiple pick-ups during the week
2. Acknowledged -The patios are slightly outside of the building envelope.
3. Note reworded.
4. Additional landscaping has been added.
5. The utility screening detail has been moved to the landscape plan.
PFA:
1. Acknowledged.
Natural Resources:
1. Turf will be irrigated bluegrass
2. Existing tree symbol has been moved to the site plan
3. Pedestrian entrances have been added to the trash enclosures
Transportation Planning:
1. Northern
2. The sidewalk has been routed around the south end of building 4
Current Planning:
1. Acknowledged
2, Acknowledged
3, Acknowledged
Sincerely,
Rachel Linder
VF Ripley Associates
NORTHERN
December 19, 2000
Mark McCallum
City of Fort Collins
Engineering Department
330 South College Avenue
Fort Collins, Colorado 80522
RE: Rams Park P.D.P. & Major Improvements to West Elizabeth P.U.D.
Dear Mark:
Attached please find the revised Rams Park P.D.P. & Major Improvements to West Elizabeth
P.U.D. Utility Plans. We have revised these plans to address the comments contained in your
letter dated September 21, 2000. The utility revisions include, but are not limited to the
following:
General Comments
♦ Redline comments on blue lines have been addressed.
Utility Plan Comments
♦ All water and sewer lines are shown in a blanket utility easement.
♦ VF Ripley will provide cross section exhibit for the internal walk/drive intersection. The
utility plans have incorporated this information in the plans.
♦ Letters of Intent for all offsite easements have been obtained by the developer.
♦ All retaining walls have been clearly labeled on the grading plan.
♦ An east/west sidewalk connection has been provided south of Building Four.
♦ The signing and striping plan has been revised per your November 9, 2000 transmittal.
♦ Additional information has been provided for the 2-foot metal sidewalk chase outlet for
Pond One.
♦ The Public Service Company was spoken to by your office concerning the 15-foot utility
easement adjacent to West Elizabeth Street.
420 SOUTH HOWIS, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221 4159
Please feel free to contact our office if you have any further questions or comments.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
0.gnKeefe, roject Engineer
cc: Gino Campana
July 26, 2000
Mark McCallum
City of Fort Collins
Engineering Department
330 South College Avenue
Fort Collins, Colorado 80522
RE: Rams Park P.D.P. & Major Improvements to West Elizabeth P.U.D.
Dear Mark:
Attached please find the revised Rams Park P.D.P. & Major Improvements to West Elizabeth
P.U.D. Utility Plans. We have revised these plans to address the comments contained in your
letter dated April 3, 2000. The utility revisions include, but are not limited to the following:
General Comments
♦ Redline comments on blue lines have been addressed.
Utility Plan Comments
Cover Sheet
♦ Minor revisions to the General Notes have been made according to redline comments.
♦ Plat has been included in the Utility Plan as a separate document after the cover sheet.
Overall Utility Plan
♦ Existing conditions on the utility plans have been revised to reflect only the existing
utilities, roadway improvements, and trees to remain.
♦ Internal access ramps have been included in the plans.
♦ Street repair note has been included in on overall utility plan and street plan and profile.
♦ All existing access points on the south side of West Elizabeth have been included in the
existing conditions.
♦ All overhead utilities will be buried in accordance with Section 3.3.2(D)(7) of the Land Use
Code.
420 SOUTH HOWES, SUITE 202, FORT (OLLINS, (OLORA00 80521, (970) 221-4158, FAX (970) 221-4159
Grading and Erosion Control Plan
♦ Due to the existing grades at the eastern access drive, minimal drainage flows will be
conveyed through curb and gutter into Elizabeth Street to maintain acceptable access
grades into the project.
♦ Any slope steeper than 4:1 will be constructed using landscape timbers for stabilization.
♦ An offsite grading easement is in the process of being obtained from the adjacent property
owner.
Elizabeth Street Plan and Profile
♦ The cross slope is a straight line grade from the crown to the lip of new gutter adjacent to
the new pavement. The street cut and repair has been extended to the centerline of West
Elizabeth Street.
♦ The constructed curb and gutter is labeled to be 6" vertical curb and gutter.
♦ A cross section of the widening of West Elizabeth Street has been provided at 50 foot
increments. The cross slope for widening Elizabeth Street maintains a minimum of a 2%
cross slope. The full cross section is shown and properly labeled according to redline
comments.
♦ A signing and striping plan has been included with this submittal set.
♦ The soils report has been updated.
♦ The curb cuts and parking lot configuration has been redesigned so the one-way drive
aisle functions properly. The pedestrian refuge will not be required with this project.
General Details
♦ The driveway detail has been revised.
♦ Redline comments have been addressed.
Plat Comments
♦ Comments handled by Landstar Surveying Inc.
Soils Report Comments
♦ Soils Report has been updated and will be provided by the developer.
Traffic Impact Study Comments
♦ Both of the access points into this project have been revised to function as right-in/right-
out. No shared access point is required between KFC and this project.
Please feel free to contact our office if you have any further questions or comments.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
*eg L. aKeef*eroject Engineer