Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK TENTH LOT 2 - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-07-27City of Fort Collins Transportation Services Engineering Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: Q5—I-4- Issuance Date: S Project Name: Oakridge Business Park, 10`s Filing, Lot 2 Project A.K.A.: The Professional Offices at Oakridge Project Location: Southwest corner of Wheaton Drive and Oakridge Drive Alan C. Line Permittee: Sty btflr# , 970-226-1500 City and developer contacts: See attached Exhibit `A' for names and phone numbers of all contact persons for this project Fees: Permit Application Fee ($300.00) $ paid Construction Inspection Fee (paid prior to issuance of this permit) $_ 1,171.80 Total 5 1,171.80 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 24,749.00, Form of security deposited with the City: C. PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the C'ity's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. Page 1 of 5 281 NnrlhCol Iege A%enue • PQ. Box580 • Fort Collins, CO80522-0580 • (970)221-6605 • FAX(970)221-6378 1V W WJCgov.Com H W W S y W Q y W F fq 0 U Z a y W H z Q F U W O w IL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p V... 1. 0 0 o 0 0 m r n EA fA fA o o boo '00LO n EA f n n M ri00000 o (O EA fA fA (fl p O W F»e» es Fs ww EA fA U)w ,� G � N � J J m w IL Lu ONw O F?LL Z O O O O O O O O O O O O O O O O � 0000000 O O O O O h O�� N 0 0 0�, O V O O O a V O— O O J J F Y o o M M M M t O 60 fA fA fA 0 7 W C.) H H w Z W wa0H W W W. } -' 'y LL LU 0) zLU LLam .`. f. r Z > 0 O it w w o00000 000000 0 000000 0 000000 'o 0 0000o 0 0000o '0000 F IL D F vo0000 000000 C9 v> f» fn E» F» 0 to o e» to e» f» e» W w IL F 07 y W R ? —Q IL a LL 0 U) O > F w _ U ~ LU w w x W F o 0000 o 0000 0 00 0000 00 0000 O 00 0000 00 0000 O N 0 0= O Z F F N 0 0 0 O 60 60 fA O N O O O O M t0 fA EA EA fH fA fA 0 0 0 EA M fA fA 60 eo U UOZw Qm F» co E»� �> W W � w �]LL'O W �R'wy cn w> t6 `° w 0 0 `� J N F w H 0 zm2ya LL 0 rLU ... O O LL Z_ UUO U....QU _,. _� ... F m y ���000000 w w Z LL 0 Z W W ~ V 2 z m W J m J o F W 13 W W d N H _ ZZ50 0 ~O U Z N Z a Lu �ar3 LL W y 0 0 it y y LL LL Y} U U LL LL LL 0 0000 0 0 U) LL LL LL}} �� 2 J J U U W W J J J J (n J J J (n (n O W W W W W W W W U LL Z_ y K J J U me m OK U a y ' F o LLr a Z 7 za a U a y d c o Lu 2y o C W c y U° > N U> __ N c y@ U N Y N O LL c J 0 OC 2 Z N C F a E K Z o.J zma Oai c -0O dU a�6i Z'ai 2 o 3' aEi m�� �F m ~ J W ?i S m T N (n C 3 m N H C W O W 0. J� U d�H y 06 Z.2 �'a N amp y O)dU N C N �H p L N p) p L T O N C E -6 � W R w m $ o m_ m A m m 2 c m a m 16 m a a� p° a 0 o`.a in w H_03: ?i t��F-�i ii 2>2ii� V1 U' a00a¢U DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/16/99) ty use only: Application Number: Application Date: 'jOtJ. Ob Permit application fee: $ UCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. I- 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. ...., ,XT INFORMATION: Project Name (as approved by the City): rl-% 1-AFLF55,1mti1Y- oF�c s Qr dolL�ir�c Project A.K.A. (Marketing name if different from Project Name): Project Location: Lti T z, Property Owner(At the t Individual Name: Company Name: Address: I C67I 15051AJ95-r p/�,GC , /O 14e, Phone number(s): Officer 7D. Cellphone: O. 2 ODo Fax number: Zb 7-7-5 . Email: 2 Applicant/Project Manager (The primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the Developer" in the Development Agreement for this project): Individual Name: Company Name : Address: Phone number(s): Office: Cellphone: _ Fax number: Email: BRINKMAN CONSTRUCTION TRANSMITTAL LETTER To: Sheri Wamhoff From: Brinkman Construction, Inc. Development Review Mgr. 712 Whalers Way, Building B, Ste 300 Fort Collins, CO 80525 Transmittal Number: 007 Project Name: Professional Offices at Oakridge Please note the following: X For your Information Files For Approval Correction Requires Your Signature Return Contents: # of Copies Description Date 1 Development Construction Permit Application 6/23/05 1 Check for Permit Application 6/23/05 1 Proposed Project Schedule 6/23/05 1 Copy of Site Plan 6/23/05 1 Project Quantities and Cost Estimate Sheet 6/23/05 Remarks: Date: Signed: Brinkman Construction, Inc. - 712 Whalers Way, Building B, Suite 300 - Fort Collins, CO 80525 Office: (970) 267-0954 / Fax: (970) 206-1011 W W W.BrinkinanPartners.com Transportation Services Engiineering Department MEMORANDUM Oakridge Partners Sheri Wamhoff, Development Review Manager/Nancy Reed 07/06/2005 Initiate Escrow Account This memo is to acknowledge the receipt of escrow funds in the amount of $24,749.00 for the following: Southwest corner of Wheaton Drive and Oarkridge Drive, Oakridge Business Park, 1(Ah Filing Lot 2 (AKA The Professional Offices at Oakridge) for the completion of Security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. When improvements to the Right -of -Way are completed, please call our inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the improvements have passed inspection, the funds in escrow will be released to you. Escrow funds have been received from: Oakridge Partners P.O. Box 2125 Fort Collins, CO 80522 226-1500 cc: Initiate Escrow file Subdivision File Accounts Payable Clerk Permit #05-17 Initiated by: Sheri Wamhoff 81 North CollegeAvenue • P.O. Box380 • Fort Collins, CO80522-0580 • (970)221-6605 • FAX (970)221-6378 www.tcgoe.com 3. Construction time restrictions: N/. 4. The applicant understands that additional permits may be required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (4) the `as -constructed' plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any Page 2 of 5 land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: Approval for issuance: City Engineer Page 3 of 5 7,f ' T- it Issuance Date) EXHIBIT `A' DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Oakridge Business Park, 10`h Filing, Lot 2 Project A.K.A.: Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 x7140 Construction Inspector: Lance Newlin 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6605 Cell (970) 222-0855 Current Planner: Pete Wray 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6681 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Doug Moore 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6143 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Transportation Planning: Kathleen Reavis 215 N. Mason St., Fort Collins, Co 80524 (970)224-6140 Page 4 of 5 Forestry: Light and Power: Developer's Contact Persons: Project Manager: Tim Buchanan 215 N. Mason St., Fort Collins, Co 80524 (970)221-6361 Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Stu MacMillan Oakridge Partners LLP PO Box 2125 Fort Collins, Co 80522 (970)226-1500 Cell (970) 215-7000 Fax (970) 223-4156 /aC.aN. C.c�Nc I�Ls-.asJm-E /�- Developer/Owner: StnlMlien gl"sti,,� ✓✓�s���^'3 �'� Oakridge Partners LLP a PO Box 2125 Fort Collins, Co 80522 (970) 226-1500 Cell (970) 215-7000 Fax (970) 223-4156 Project Engineer: Tricia Kroetch, North Star Design, Inc. 700 Automation Dr, Unit 1, Windsor, Co 80550 (970)686-6939 Cell Fax (970) 686-1188 Architect/Planner: Brad Massey, Aller Lingle Architects, PC 712 Whalers Way, Suite 13-100, Fort Collins, Co 80525 (970) 223-1820 Cell (970) Fax (970)223-1833 General Contractor: Paul Brinkman, Brinkman Construction 712 Whalers Way B-300, Fort Collins, Co 80525 (970)267-0954 Cell (970) 217-1503 Fax (970) 206-1011 Paul. brinkinanAbrinkmanpartners.com Page 5 of 5 ID 10 I Task Name 1 Oak Ridge Office Building #2 (4500 square feet) 2 General Conditions 3 Subm t/review/obtain building permits 4 0 Prepare and submit project schedule 5 Long Lead Procurement 6 0 Submit shop drawings and order long lead items - re -steel 7 7; Submit shop drawings and order long lead items -wood trusses 8 Q Submit shop drawings and order long lead items -steel/ truss 9 Q Submit shop drawings and order long lead items - brick 10 I Submit shop drawings and order long lead items - roofing 11 Submit shop drawings and order long lead items - windows 12 0 Submit shop drawings and order long lead items - electric 13 0 Submit shop drawings and order long lead items - plumbing 14 74 Submit shop drawings and order long lead items - HVAC 15 Mobilize on Site 16 d Notify bldg manager of site mobilization activities 17 Set up site office 18 1 Q Set line and grade benchmarks 19 7� Prepare site - lay down area and temporary fencing 20 Site Work and Utilities 21 1 d Relocate site irrigation line 22 Clear and grub site 23 Rough grade site - install building pad (cut/filt) 24 Street cut/lnstall storm sewer 25 Street cut/Install sanitary sewer 26 Install water 27 Erect building batter boards and layout building 28 Perform final site grading 29 Install site retaining wall 30 Site concrete 31 Set electrical transformers 32 Install on -site storm line/yard drains 33 Landscaping 34 I Install water quality pond 35 Foundations and Slab on Grade 36 Excavate footings 37 Form, reinforce, pour and strip footings 38 Form, reinforce, pour and strip grade beam 39 Back fill grade beam 40 Underground electric and plumbing 41 Prep, pour 8 finish slab on grade 42 Steel Erection 43 Erect steel columns & beam at entry 44 Carpentry Work 45 Install exterior framing and sheathing 46 Install trusses 47 ! Erect ornamental steel truss 48 Install roof sheathing 49 Conduct framing & insulation inspection 50 Masonry Work 51 Install exterior masonry work 52 Clean masonry 53 Roofing 54 Install flashing and roofing Page 1 Duration - -�-- 160 days 36 days 36 days 20 days 66 days 5 wks 4 wks 4 wks 10 wks 8 wks 8 wks 6 wks 6 wks 6 wks 10 days 0 days 2 days 2 days 3 days 76 days 1 day 1 day 3 days 2 days 3 days 2 days 2 days 3 days 3 days 10 days 1 day 3 days 15 days 3 days 10 days 1 day 1 day 2 days 1 day 3 days 2 days 1 day 1 day 18 days 8 days 5 days 1 day 3 days 1 day 17 days 15 days 2 days 5 days 5 days Start _ Tue 5117105 Tue 5/17105 Tue 5/17/05 Wed 5/25/05 Fri 6/10/05 Fri 6/10/05 Tue 7/12/05 Thu 6/30/05 Tue 6/14/05 Mon 6/27/05 Mon 7/18/05 Fri 7/22/05 Fri 7/22/05 Ed 7/22/05 Fri 6/24/05 Ed 6124/05 Tue 7/5/05 Tue 7/5/05 Tue 7/5/05 Tue 7/5105 Tue 7/5/05 Mon 7/11/05 Tue 7/12/05 Fri 7/15/05 Tue 7/19/05 Fri 7/22/05 Fri 7/15/05 Tue 9120/05 Fri 9/23/05 Fri 9/23/05 Fn 9/23/05 Fin 7/29/05 Fri 9/23/05 Fri 10/14/05 Tue 7119105 Tue 7/19/05 Wed 7/20/05 Thu 7/21/05 Mon 7/25105 Tue 7/26/05 Fri 7/29/05 Tue 8/2/05 Tue 8/2/05 Finish Mon 12/26/05 Tue 7/5/05 Tue 7/5/05 Tue 6/21/05 Fri 919/05 Thu 7/14/05 Mon 8/8105 Wed 7/27/0511 Mon 8/22/05' Fri 8/19/05' Ed 9/9/05 Thu 9/1/05 Thu 911/05 Thu 9/1/05 Thu 717/05 Fri 6/24/05 Wed 7/6/05 Wed 7/6/05! Thu 7/7/05'i Tue 10118105 Tue 7/5/05 Mon 7/11/05 Thu 7/14/05 Mon 7/18/05 Thu 7/21/05' Mon 7/25/05 Mon 7/18/05 Thu 9/22/05 Tue 9/27/05 Thu 10/6/05 Fri 9/23/05 Tue 8/2/05 Thu 10/13/05 Tue 10/18/051 Mon 811105 Tue 7/19/05 i Wed 7/20/05 Fri 7/22/05 Mon 7/25/05'. Thu 7/28/05 �.. Mon 8/1/05'. Tue 8/2/05 Tue 8/2/05' Tue 8/2/05 Thu 8125/05 Tue 8/2/05 Thu 8/11/05 Fri 8/12/05 Thu 8/18/05 Fri 8119/05 Fn 8119/05 Mon 8/22/05 Wed 8/24/05 Thu 8/25/05 Thu 8/25/05 Fri 8126/05 Mon 9119105 Fri 8/26/05 Thu 9/15/05 Fri 9/16/05 Mon 9/19/05 Thu 8125/05 Wed 8131/05 Thu 8/25/05 Wed 8/31/05 ID 8 ! Task Name Duration Start Finish 55 Window wall and store front closures 5 days Fri 9/16M Thu 9/22105 �, 56 Install windows 5 days Fri 9/16/05 Thu 9/22/05', 57 Install store front doors and hardware 2 days Fri 9/16/05 Mon 9/19/05 58 Building Finishes 56 days Fri 9/23/05 Tue 12/13/05 59 Rock bottom of truss cords 5 days Fn 9/23/05 Thu 9/29/05 60 Frame, inspect, rock and finish walls (all) 20 days Fri 9/30/05 Thu 10/27/05 61 Paint walls 8 days Fri 10/28/05 Tue 11/8/051 62 Install pre -hung doors, hardware and accessories 5 days Wed 11/9/05 Tue 11/15/05 63 Set Casework/install wood trim 5 days Wed 11/16/05 Tue 11/22/05 64 Install ceiling grid 5 days Wed 11/9/05 Tue 11/15/05 65 Drop ceiling tile 10 days Wed 11/16/05 Tue 11/29/05 66 Install floorigg/base (all) 10 days Wed 11/30/05 Tue 12/13/05 67 Plumbing 30 days Fri 9/23105 Thu 11/3105 68 Rough -in plumbing in drywall partitions 4 days Fri 9/23/05 Wed 9/28/05'I 69 Plumbing rough -in inspection 1 day Thu 9/29/05 Thu 9/29/05 70 Set plumbing fixtures and trim 3 days Fri 10/28/05 Tue 11/1/05, 71 Flush, test, and clean piping and fixtures 2 days Wed 11/2/05 Thu 11/3/05 �', 72 Electrical 45 days Fri 9123/05 Thu 11/24/05 73 Rough -in electrical in drywall walls 7 days Fri 9/23/05 Mon 1013/05 74 Above ceiling rough -in 5 days Tue 10/4/05 Mon 10/10/05 75 Pull tele-data cable 3 days Wed 11/9/05 Fri 11/11/05 76 Electrical rough -in inspection 1 day Mon 11/14/05 Mon 11/14/05 77 Install and terminate electrical devices 3 days Tue 11/15/05 Thu 11/17/05 78 Make electrical terminations for HVAC equipment 2 days Tue 10/11/05 Wed 10/12/05 79 Install light fixtures - test and clean 5 days Fri 11/18/05 Thu 11/24/051 80 Heating and Ventilating - AC 51 days Fri 9/23/05 Fri 12005'.. 81I, Set equipment in mechanical room 3 days Fri 9/23/05 Tue 9/27/05, 82 Install flex duct in building chase 7 days Wed 11/16/05 Thu 11/24/05 83 Mechanical inspection/sign-0ff 1 day Fri 11/25/05 Fri 11/25/05 84 Set HVAC trim and test and balance system 3 days Wed 11/30/05 Fri 12/2/05 85 Final Clean-up and Occupancy 5 days Wed 12/14/05 Tue 12/20/05 I 86 Final clean-up 4 days Wed 12/14/05 Mon 12/19/05! 87 Substantial completion date 1 day Tue 12/20/05 Tue 12/20/05 88 Complete Final Inspections 4 days Tue 12/20/05 Fri 12/23/05 89 Perform owner & architect's inspection 1 day Tue 12/20/05 Tue 12/20/05', 90 Perform local building agency inspection 1 day Tue 12/20/05 Tue 12120/05' 91 Perform Fire Marshal's inspection 1 day Tue 12/20/05 Tue 12/20/05 92 Complete punch list items from all inspections 2 days Wed 12/21/05 Thu 12/22/05 93 Obtain certificate of occupancy 1 day Fri 12/23/05 Fri 12/23/05 94 Building Turn Over 1 day Mon 12/26/05 Mon 12126/05 95 Issue final completion documents including warranties 1 day Mon 12/26/05 Mon 12/26/05 96 Turn building over to owner 0 days Mon 12/26/05 Mon 12/26/05 Page 2 FIT F� IEL�\ ,1 t Ill n 1 OP--, III IEI,,IF AJ�B Sfl�q e -.a t a 4 IF 05�E> 17 7SFZ 'ay . - {,s �n .. t- °As a i� .xP11In sE1 i , g � E E5O�i , 243E ha / V 0 IA M .AR C 9 `. 6FNIF9 I IT III n-IBI3A �4 L I " arze-snaoo >G OBE 1_ 9 2 2Tt20 P <+1ILI III crc 1 FI, e -a�oaeI, c 3 E 1-800 922.1987 C E jmi[ r� m Om y '-4 i t Irrt'� IF 11 I —v Pn ur.-i cO .[ I I i w I„IT R _ _ 4980 1 7 L-- 4-t, N ER E 1SSiNE I T 4 Bib L pYC [Z CSR. LOPE- aye y Try -4117, �4m. „ s .- E Y L,: acm I J W -j E, 4 1 w LET E BY ,rE : I Z� z< Q a li 1 mJ y i ,., w F W� w x Y OF :: �•�. 6EPENo - Q CO �..... ILI or _..i wT r c_. e_" r '. x ax,.�r. ,....an:� �.--r