Loading...
HomeMy WebLinkAboutSOUTH GLEN PUD FOURTH - Filed GC-GENERAL CORRESPONDENCE - 2005-07-08^ r- r BLS DLVFI,OPMENT LLC 2402 Ccdarwood Dr_ Ft. Collins, CO 80520 (303)490-2145 City of Ft_ Collins Planning & Lngineering Ann Mike Ruz.ak RefDevelopment Agreement South Glen PUD Fourth Filing Dear Mike, May 31, 1994 The final plan revisions for South Glen have been to Steve Oft on Tuesday, May 24, for review. In order to help expedite the development agreement these are the issues in addition to the standard agreement that I believe need addressing I The agreement will be executed with BLS Development LLC, Vicki Wagner General Manager a Colorado Limited Liability Co. I havea copy of our Articles of Incorporation.. 2 The second item has to do with the emergency fire access. I would propose that we add language to the agreement that building permits will not be issued on lots 1 1 - 18 until the Fincrgency lire access is completed. 3_ Pedestrian and drainage access between lots 9 and 10. The City wants to have the option to use this as a public access in the event that the city creates a bike -way through this area across the New Mercer Canal and the railroad tracks. As I have stated before I do not have a problem with this, although I do not feel that it is fair to the home owners of these Tots or the I IOA that there is an open ended agreement_ 1 believe that it needs to have a time frame in which the trail would be completed. I would propose that if the city has not made this a Part of there bike system within 5 years form the completion of South Glen with plans to complete the crossings over the railroad tracks within 8 years, then the city world no longer have the option to use this as a public access across the canal and railroad tracks 4. The other area of concern to the city was the homes on lots 1 - 1 1 having basements. With high ground water in this area the basements would have to be specially engineered and designed to make sure that the basements did not flood and that the ground water was carried away from the buildings and into the drainage ponds. With the drainage system directly behind these lots I believe that foundations can be designed to accommodate the water problems. We will probably need in our agreement that should there be basements on the lots they must be designed and approved by a qualified foundation engineering specialist I believe that it is the builders intent to offer basements as an option for the homes on these lots with the understanding that it may not be possible to have basements. Presently our construiction schedule is to begin staking the first week of June and proceed ahead with the dirt work_ It would be my hope that we could have the development agreement completed or substantially complete by the week ofJune 13 so that we could begin construction ofthe sewer and storm sewer. We would begin construction of the water line approx. June 29 Will] the curb, gutter and street improvements to follow. In reading through a copy of a Development Agreement these were the only items that I was aware of that needed to be addressed in addition to the standard things. With the delay in Steward Finginecring completing the plans and reports it has crowed my schedule a lot. I realize that this is not your problem and that you are also very busy, if however there is any thing that I can do to help expedite this process please let me know. Sincerely, Vicki Wagner General Manager