HomeMy WebLinkAboutBLOCK 6 320 NORTH COLLEGE AVENUE SCHRADER OIL COMPANY - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-06-24City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: ?' h Issuance Date:
Project Name: Schrader Oil Scout Station
Project A.K.A.: North College Schrader
Project Location: 320 North College Avenue southeast corner of College Avenue and
Permittee: Wayne Schrader Schrader Land Co. LLLP
City and developer contacts: See attached Exhibit "A"for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($ 150) $ 150.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 812.70
Excavation permit Fee (paid prior to issuance of this permit) $ 625.00
Total $ 1,587.70
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 14,503.00
Form of security deposited with the City:
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Pennittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shalt expire and the applicant will forfeit the permit fee paid for this
permit, Whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancies will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. if the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3)(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions: A State Excavation permit is required prior to the start of any work within
the State Right-of-way.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code-, and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and
authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby
permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter
upon such property to perform work required of the applicant if the applicant were to fail to perform
the required work. I also acknowledge that I have read this permit document with all its requirements
and conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature '' < % Date _ 1 -
Approval for issuance:
r
City Engineer Approval:
(Permit Issuance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Name, address and numbers
Project Name: Schrader Oil Scout Station
Project A.K.A.: North College Schrader
City Staff Contact Persons:
Development Engineer: Sheri Wamhoff
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6750 x7140
Construction Inspector: Lance Newlin
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6605
Cell (970) 222-0855
Current Planner: Not Applicable
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970)221-6854
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, Co 80521
(970)224-6063
Natural Resources: Kim Kreimeyer
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6641
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970)224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, Co 80524
(970) 224-6140
Exhibit "A" page 1 of 3
Forestry: Tim Buchanan
281 N. College, Fort Collins, Co 80524
(970)221-6361
Light and Power:
US West:
Developer' Contact Persons:
Project Manager:
700 Wood Street, Fort Collins, Co 80521
(970)224-6700
Tim Weaver i
(970) 224-7473--{
Steve Schrader
Schrader Oil Co.
320 North College Avenue
Fort Collins, Co 80524
(970) 484-1225
Fax (970) 484-6128
Developer: Steve Schrader
Schrader Oil Co.
320 North College Avenue
Fort Collins, Co 80524
(970)484-1225
Fax (970) 484-6128
Owner: Wayne K. Schrader
Schrader Land Co., LLLP
320 North College Avenue
Fort Collins, Co 80524
(970)484-1225
Fax (970) 484-6128
Architect/Planner:
Project Engineer:
Don Shields
Wickham Gustafson Architects
1449 Riverside Ave.
Foil Collins, CO 80524
(970) 493-2025
Michael .Tones (PE# 25083)
Northern Engineering Services
420 North Howes, Suite 202
Fort Collins, Co 80521
(970)221-4158
Fax (970) 221-4159
Nes2214158(cFaol.com
Exhibit "A" page 2 of 3
General Contractor: Pete Cottier
Cottier Construction, Inc
P.O. Box 1051
or All Other Contractors:
Grading:
Concrete/ Flat work:
Concrete/ Structures:
Paving:
Landscape:
Fort Collins, Co 80522
(970)221-4641
Fax (970) 221-4656
Exhibit "A" page 3 of 3
TO:
FROM:
DATE:
RE:
MEMORANDUM
Schrader Oil Co.
Sheri Wamhoff, Development Review Civil Engineer
October 5, 1999
Initiate Development Bond Account
This memo is to acknowledge the receipt of development bond funds in the amount of
$14,503.00 to guarantee the completion of all public improvements to be constructed
as shown on the approved plans for the development.
When improvements to the Right -of -Way are completed, please call our inspection
recorder at 221-6609 to request an inspection (please allow 24 hours for the
inspection to take place). Once the improvements have passed inspection, the funds
in development bond will be released to you.
Development bond funds have been received from:
Schrader Oil Co.
PO Box 495
Fort Collins, CO 80522
cc: Initiate Escrow file
Judi Vos, Accounts Payable Clerk Initiated by S. Wamhoff
Development Permit # cfl -':L4
mrr� o z'
H O J z n o J o a n H O J� a z o
{� lL 0 iz y o r N m rn n c`. m ra-- w x¢` w Q LL 0t
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number.1- ` S Issuance Date:
Project Name: Schrader Oil Scout Station
Project A.%A.: North College Schrader
Project Location: 320 North College Avenue, southeast comer of College Avenue and
Permittee: Wayne Schrader, Schrader Land Co., LLLP
pM tp4 O O
4h 1f1 '= Ll ii
H
City and developer contacts: See attached Exhibit "A"for names and phone numbers of all
contact persons for this project
Fees: Permit Application Fee ($ 150) $ 150.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 812.70
Excavation permit Fee (paid prior to issuance of this permit) $ 625.00
Total $ 1,587.70
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 14,503.00
Form of security deposited with the City: (� �,u C qF
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
r the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
f 2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: