HomeMy WebLinkAboutSAINT JOSEPH PARISH EXPANSION 300 WEST MOUNTAIN - Filed CS-COMMENT SHEETS - 2005-06-23City of Fort Collins
Current
PROJECT
COMMENT SHEET
Building Permit Review
DATE: April 12, 1999 DEPT: Engineering
PROJECT: St Joseph Parish, 300 West Mountain - 17,392 sf addition
Building Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: April 28, 1999
*Note: This is being processed in accordance with LUC 1.6.5 as an existing limited permitted
use. The additions do not represent more than 25% if the original building. The applicable
standards contained in articles 3 and4 will only be required to the extent reasonably feasible.
Saint Joseph Parish
May 3, 1999
Minimum width of a patch on an arterial street is 10 feet. Show the patch at least 10 feet in
width.
Change note "street cut and patch" to "street cut and patch per current street repair and
reconstruction standards and guidelines"
Provide additions to existing walk detail.
Date:Signature: ; —
Check here if you wish to receive copies of revisions
Plat QGSite _ Drainage Report _ Other:
12��tility Landscape — Redline Utility
PROJECT
COMMENT SHEET
City of Fort Collins Building Permit Review
Current Plannini
DATE: April 12, 1999 DEPT: Engineering
PROJECT: St .Joseph Parish, 300 West Mountain - 17,392 sf addition
Building Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: April 28, 1999
*Note: This is being processed in accordance with LUC 1.6.5 as an existing limited permitted
use. The additions do not represent more than 25% if the original building. The applicable
standards contained in articles 3 and4 will only be required to the extent reasonably feasible.
Saint Joseph Parish
May 3, 1999
�. Minimum width of a patch on an arterial street is 10 feet. Show the patch at least 10 feet in
width.
Change note "street cut and patch" to "street cut and patch per current street repair and
reconstruction standards and guidelines"
4rovide additions to existing walk detail.
Date: ��Signature:
Check here if you wish to receive copies of revisions
__ Plat �CSite _ Drainage Report _ Other: _ __
z tility �<I,andscape Redline Utility
City of Fort Collins
Current
PROJECT
COMMENT SHEET
Building Pennit Review
DATE: January 12, 1999 DEPT: Engineering
PROJECT: St Joseph Parish, 300 west Mountain - 17,392 sf addition
Building Permit Review (old use -by -right)
PLANNER: Peter Barnes, Zoning
ENGINEER: Sheri Wamhoff
All comments must be received by: February 10, 1999
*Note: This is being processed in accordance with LUC 1.6.5 as an existing limited permitted
use. The additions do not represent more than 25% if the original building. The applicable
standards contained in articles 3 and4 will only be required to the extent reasonably feasible.
Saint Joseph Parish School expansion
Eliminate general note number 2
February 17, 1999
Indicate width of new driveway and distance it is from property line or other access drive.
Provide concrete to property line at new driveway.
Make sure that the new driveway location works with the layout of the parking lot - as per foresters
comments the tree can not be removed, so drive must be moved.
A drive isle is needed in the parking lot - no dead-end parking.
Make changes to details as shown on the plans
It is a driveway detail - modify to reflect the drive requirements
Provide the dowel detail
Provide sidewalk ramp detail
See additional comments on the plans.
Are there any existing easements that need to be vacated or any that will need to be dedicated? (For the
Sewerline?)
Date: r Signature. ^^��
Check here if you wish to receive copies of revisions
Plat Site Drainage Report Other:
Utility 0<-,andscape p�Redline Utility