HomeMy WebLinkAboutREGISTRY RIDGE PUD THIRD - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-06-16T. ansportation Services
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 01-30 Issuance Date: c 7
Project Name: Registry Ridge PUD 3rd Filing
Project A.K.A.:
Project Location: West of Shields Street, south of Trilby Road
Permittee: (ire gg Seebohm, Double F,agle Construction Services, Inc
City and developer contacts: See attached Exhibit `A for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($300.00) $ 300.00(pd)
Construction Inspection Fee (paid prior to issuance of this permit) $ 44,580.60
Total S 44,880.60
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all publie
improvements to be constructed as shown on the approved plans for the development.
$838,592.20
Form of security deposited with the City: Letter of Credit
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
I . 'fhe Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and relates documents. The Permittee shall have an Engineer
represent. as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer Prior to
the City`s acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Processional Engineer licensed in Colorado.)
All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: N/A
4. The applicant understands that additional permits maybe required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat casements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Rxpiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
speci lied in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the "as -constructed" plans have been received and accepted by the City.
9. '1he warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 33.I (C)(2), and 33.2(C) of
the land Use Code.. as applicable.
2
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erasion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other
Permittee's acknowledgment signature:
By signing this permit I acknowledges that 1 am acting with the knowledge, consent, and authority of
the owners of the property (includine all owners having legal or equitable interest in the real property,
as dclined in Section 1-2 of the City Code: and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
oflicials to enter- upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions. and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: s r l r s�'_en _ _Date: ' /!r;
Approval for issuance:
1 AP
City Engineer Approval:_ U' 1�+�` )ice 'Date: Un I �� _?,kA,--
(Permit ssuance Date)
Exhibit "A" page 3 of 3
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Registry Ridge PUD, 3rd Filing
Project A.K.A.:
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Marc Virata
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6605 x7128
Construction Inspector: Dan Peterson
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6605
Cell (970) 222-8780
Current Planner: Steve Olt
281 N. College Avenue, Fort Collins, CO 80524
(970)221-6750
Water Utilities Engineer: Terry Farrill
4700 S. College Ave, Fort Collins, CO 80525
(970) 226-3104
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, CO 80521
(1970)224-6063
Natural Resources: Doug Moore
281 N. College Avenue, Fort Collins, CO 80524
(970)224-6143
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, CO 80524
(970)224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
210 E. Olive, Fort Collins, CO 80524
(970)224-6140
Exhibit "A" page 4 of 3
Forestry: Tim Buchanan
281 N. College, Fort Collins, CO 80524
(970)221-6361
Light and Power: Janet McTague
700 Wood Street. Fort Collins, CO 80521
(970) 221-6700
Developer' Contact Persons:
Project Manager: Gregg Seebohm
Double Eagle Construction Services, Inc
400 E. Horsetooth Road, Suite 300
Fort Collins, Co 80525
(970) 223-3500
Cell (970) 227-7775
Fax (970) 206-1134
Dble 1194(6Dmsn.com
Developer/Owner: Jerry B. Richmond
U. S. Home Corp
6000 S Greenwood Plaza Blvd, Suite 210
Englewood, CO 80111
(303)779-6100
Cell (720) 350-2070
Fax (303) 221-1436
richmondi (c�wf. ushome. com
Project Engineer: Bud Curtiss
Northern Engineering, Inc
420 S. Howes, Suite 202, Fort Collins, CO 80521
(970)221-4158
Fax (970) 221-4159
nes2214158@aol.com
All Contractors:
Grading/Utility/ Paving Contractor:
Dave Simpson
Connell Resources
4305 E. Harmony Rd, Fort Collins, Co 80525
(970)223-3151
Cell (970) 222-3575
Fax (970) 223-3191
Exhibit "A" page 5 of 3
Concrete/ Flatwork: Craig Long
Colorado Construction, Inc.
6810 N. Broadway, Suite B, Denver CO 80221
(303)427-0868
Fax (303) 427-0882
Coloradoconstructors@compuserve. com
Concrete/ Structures: Wayne Schell
Concrete structures, Inc.
4325 Hilltop, Longmont, Co 90504
(970)535-0202
Cell (303) 591-0372
Fax (970) 535-4382
Landscape: Mark Stock
Alpine Gardens
7029 S. College Ave, Fort Collins, Co 80525
(970)226-2296
Cell (970) 215-9483
Fax (970) 223-6348
Exhibit "A" page 6 of 3
FIDELITY GUARANTY AND ACCEPTANCE CORP.
Ho.K 2863, HoLSTON. TEXAS 77252-2863
(713)599-2575
'it NF 21,2001
BENEFICIARY: CFFY OF FORT ('OL.LINS
300 LAPORTE AVE.
FORT COLLINS. CO S0521
RE`. IR REVOCABLE CLFAN I_E I'TLR OP CREDIT ?t FGAC-01 114
GENTLEMFN:
WP. HERFBY ESTABLISH. ATTHE REQUEST AND FOR THE ACCOUNT OF U.S. HOME CORPORATION,
6000 SOUTH GRl IJNAmOD PLAZA BOULEVARD. E-NGELWOOD. CO 8011 L IN YOUR FAVOR AS
HENIIICIARY, OUR IRRFVO( ABLE. LETTER OF CREDIT NO. (A 114, IN THF. AMOUNT OF LIGHT
HUNDRED THIRTY EIGHT THOUSAND FIVE IIUNDRFD NTNETY TWO AND 20100 U.S. DOLLARS
1 :;h18S9�__o) (AS MORP FULLY DPSCRIBED BELOW). LFFFCTIVF IMMEDIATELY AND EXPIRING AT
Ill[ ( LOST: CIF BUSINESS ON JUI Y _0. 2001 Al OUR OFFICE AT 10707 CLAY ROAD, HOUSTON. TX
77041.
HHS CLITFR OF CREDIT- IS INTENDED FOR THE REGISTRY RIDGE P.U.D., FILING 3,
DEV ELOPMII N'F PROJECT FOR I'HE ASSURANCE OF THF, COMPLY FION OF THE CONSTRUCTION
ANO 1 Hli MAIN I I_NANCE :AND REPAIR OF THE PUBLIC INFRASTRUCTLRE IN CONNECTION WITH
I11L .APORCSAID DE)iFTUI'MLNT PROJEC"I' AND ITS ASSOCIATED DEVELOPMENT AGREEMENT
AND DIA-ELOPNHNT (COBS"I12U("LION PERMIT. FUNDS UNDER THIS LE"FTER OF CREDiI ARE
.AA%AIJ ABLL TO YOL: FOR ONE OR MORE DRAWINGS PRIOR TO THL CLOSE OF BUSINESS ON JULY
'u 50u2, :AG�VNS-I SIGHT DRAFIS IN AN AGGREGATE CUMULATIVE ANIOUNI NOT TO EXCEE-D
DAF1-1) 111E DATE OF PRESENTMENT, DRAWN ON OUR OFFICE REFERRED TO ABOVE,
RLFERRIN<j ]HEREON TC) !HE NUMBER OJ: THIS LETTER OF CREDIT AND ACCOMPANIED BY
YOUR ANKITCI=.N CI -:RI IFIC;A FE SIGNED BY YOU.
PRIISI:N"I'ATION OF SUCH DRAFT AND CERTIFICATE SHALL BE MADE AT OUR OFFICE REFERRED
TO AJ3OVE.
UPON THE EARLH-R OF (I) OUR HONORING YOUR DRAFT(S) TOTALING S838,592.20 IN THE
AGGRI GAIF. I'RISI_3v FED ON OR BEFORE IHIS LETTER OF CREDIT EXPIRES PURSUANT TO THE
lJi 7S HIIREIN OR (11) 1 HE St I UI'NDER TO US BY" YOU GF THIS LETTER OF CREDIT FOR
CANCE.LLA ]ION, THIS LI, 1I 1 R OF CREDIT SHALL AUTOMATTCALLY TERMINATE.
I E IS IJNDIRS FOOD FHA E THE AMOUNT OF THIS LETTER OF CREDIT MAY BE REDUCED AS PUBLIC
1A7PROA I MINIS ARE C.ONSIRIJOTED AND ACCEPTED BY THE CITY. AS COMPONENIS OF THE
INFR.AtiTRUCEIiRI ARI SATISFACTORH-ti' COMPLEIE,D IN ACCORDANCE WITH APPROVED
W i I T A I'I. ANS. ]HE . VAI.LE OP 7IIF CONIPLE EED COXH'ONFNTS MAY BL F-STABLISHED FROM THE
DIfVI`U)1'A4FNI CONSTRUCTION PERMIT WORKSHEEI FOR DETERMINING COSTS OF
INI'I:ASIRUCII RL CONSTRUCTION AND INSPECTION FI!FS. WHEREUPON THE AMOUNT OF THIS
I .I'.1 Il_R OF CRIJ A E MAl BI: RICDiX LD BY I HE VALUE 01: THE COMPLETED COMPONFNDS), UPON
IJSECI1llUN OF AN .'+MI-:NDMEN] "I O LFTI ER OF CREDI"1 .
IIIIS Alf T"ELR <)F (I1 FDIT SHALL BE SL'TBJECT TO THE UNIFORM COMMERCIAL CODE AS IN EFFECKMS OF
IN IlII_ SI-CIE OF COLOR;ADO. AND. TO THE EXTEND NOT' INCONSISTENT' WITH THE TEnv
c
EXHIBIT 1
CERTIFICATE
The City of Fort Collins hereby certifies as follows with respect to the certain Irrevocable
Letter of Credit No. dated _ , established in favor of the
City of Fort Collins, Colorado (the "Letter of Credit'):
(a) He (She) is authorized to execute this Certificate of behalf of the City of Fort
Collins;
(b) The applicant/developer is in default under the terms of the development agreement
and/or the development construction permit.
(c) The sum of $
this Certificate, is the
, which is the amount of the draft presented with
amount currently due to the City of Fort Collins from
(d) The amount of the accompanying draft together with all previous draws under the
Letter of Credit do not exceed in the aggregate $ ; and
(e) The Letter of Credit has not expired.
IN WITNESS WHEREOF, the undersigned has executed this Certificate of behalf of the
City of Fort Collins this day of
THE CITY OF FORT COLLINS, COLORADO
A Municipal Corporation
[Title]
EXHIBIT 2
Request for Amendment or Release of Letter of Credit #
The City of Fort Collins certifies that the person signing below is authorized to execute this
Request for Amendment or Release of Letter of Credit on behalf of the City of Fort Collins, and
further certifies with respect to the provisions contained in the Development Construction Permit
dated _, and/or the Development Agreement dated
between the City of Fort Collins (Beneficiary) and
(Developer), the following:
[Check applicable boxes.]
❑ The Letter of Credit is to be reduced to $
❑ The expiration date of the Letter of Credit is revised to be
❑ The 60-day automatic one year renewal provision contained in the Letter of Credit
is no longer in effect.
❑ Release Original Letter of Credit upon receipt of separate replacement Maintenance
Letter of Credit in the amount of (current value).
❑ Release Letter of Credit.
In witness whereof, the undersigned has executed this certificate on behalf of the City of Fort
Collins this day of
By:
CITY OF FORT COLLINS, COLORADO
a Colorado municipal corporation
(Name and Title)