Loading...
HomeMy WebLinkAboutPARAGON POINT PUD FIFTH - Filed CS-COMMENT SHEETS - 2005-05-11PROJECT COMMENT SHEET Citv of Fort Collins Current DATE: March 6, 1998 DEPT: Mapping PROJECT: Paragon Point, 5th Filing PLANNER: Steve Olt ENGINEER: Sheri Wamhoff All comments must be received by: March 31, 1998 No Problems Problems or Concerns (see below or attached) Date: Signature: PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT ❑ SITE ❑ UTILITY ❑ LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current DATE: March 6, 1998 DEPT: Engineering PROJECT: Paragon Point, 5th Filing PLANNER: Steve Olt ENGINEER: Sheri Wamhoff All comments must be received by: March 31, 1998 _ No Problems Problems or Concerns (see below or attached) Paragon Point_ nth filing March 31, 1998 Plat • On the plat enc ofthe notes states that all existing easements are vacated with this plat, but yct in the ownership statement it states that the parcel is subject to all easements that may exist. These Uw statements conflict each other, • I he attorney ccrti licatton statement has once again changed. Attached is the most current attorne} certification that should be used on all plats. I have also included the revised attorney certification statement for deeds that should now be used with all off -site deeds. Date: Signature-.---,' f PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAN-" ❑ SITE ❑ UTILITY ❑ LANDSCAPE f'nn , �r eLk s PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 27, 1998 TO: Engineering PROJECT: #48-91IM Paragon Point, 5th Filing -Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, February 25,1998 Paragon Point, 5th filing Plat February 19, 1998 �• Provide the current Attorney Certification paragraph (attached) ["U416 et • Provide the drainage easements as shown on the plans - check with Stormwater department for the widths needed.ta The row at the corner of Trilby and Lemay - is that to be dedicated with this plat or was that dedicated by the previous plat? If it was by the previous plat than it is already dedicated. Nm Provide reception number for the easements that were dedicated by separate document.ws== Utility Plans f • Provide a revised cover sheet with the new sheets indicated on it. �w • Revise the limits of asphalt removal and replacement to that as shown. Also add the following note: Final limits of asphalt removal and replacement to be determined by City Inspector in the field Date: CHECK HERE T YOU WISH TO RECEIVE COPIES OF REVISIONS Pig k _ Drainage Report _ Other Utility Redline Utdlty _ landscape i PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 27, 1998 TO: Mapping PROJECT: #48-91IM Paragon Point, 5th Filing - Type I (LUC) PDP/FC All comments must be received by Steve Olt no later than the staff review meeting;: Wednesday, February 25,1998 bb2Q t �q �, v 5 TI"Z O)P" Spy« is hecdPcl� 1 lq so Ys sL��4rd lip Ge_ Ap10.-� 1D �vtowhcLS\ e- ev leis 1 u j"s - is `i�l, i� .�, i h� � ��'�- �e w t I Gam- o h Iy 10 ca is �, Date: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Sine _ Damage Report _ Olher — Utility _ Redline U0 _ Lands*