HomeMy WebLinkAboutPARAGON POINT PUD FIFTH - Filed CS-COMMENT SHEETS - 2005-05-11PROJECT
COMMENT SHEET
Citv of Fort Collins
Current
DATE: March 6, 1998 DEPT: Mapping
PROJECT: Paragon Point, 5th Filing
PLANNER: Steve Olt
ENGINEER: Sheri Wamhoff
All comments must be received by: March 31, 1998
No Problems
Problems or Concerns (see below or attached)
Date: Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY
❑ LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current
DATE: March 6, 1998 DEPT: Engineering
PROJECT: Paragon Point, 5th Filing
PLANNER: Steve Olt
ENGINEER: Sheri Wamhoff
All comments must be received by: March 31, 1998
_ No Problems
Problems or Concerns (see below or attached)
Paragon Point_ nth filing March 31, 1998
Plat
• On the plat enc ofthe notes states that all existing easements are vacated with this plat,
but yct in the ownership statement it states that the parcel is subject to all easements that
may exist. These Uw statements conflict each other,
• I he attorney ccrti licatton statement has once again changed. Attached is the most current
attorne} certification that should be used on all plats. I have also included the revised
attorney certification statement for deeds that should now be used with all off -site deeds.
Date: Signature-.---,' f
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAN-"
❑ SITE
❑ UTILITY
❑ LANDSCAPE
f'nn ,
�r eLk s
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: January 27, 1998 TO: Engineering
PROJECT: #48-91IM Paragon Point, 5th Filing -Type I
(LUC) PDP/FC
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, February 25,1998
Paragon Point, 5th filing
Plat
February 19, 1998
�• Provide the current Attorney Certification paragraph (attached) ["U416
et • Provide the drainage easements as shown on the plans - check with Stormwater
department for the widths needed.ta
The row at the corner of Trilby and Lemay - is that to be dedicated with this plat or was
that dedicated by the previous plat? If it was by the previous plat than it is already
dedicated. Nm
Provide reception number for the easements that were dedicated by separate document.ws==
Utility Plans
f • Provide a revised cover sheet with the new sheets indicated on it. �w
• Revise the limits of asphalt removal and replacement to that as shown. Also add the
following note: Final limits of asphalt removal and replacement to be determined by City
Inspector in the field
Date:
CHECK HERE T YOU WISH TO RECEIVE COPIES OF REVISIONS
Pig k _ Drainage Report _ Other
Utility Redline Utdlty _ landscape
i
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: January 27, 1998 TO: Mapping
PROJECT: #48-91IM Paragon Point, 5th Filing - Type I
(LUC) PDP/FC
All comments must be received by Steve Olt no later than the staff
review meeting;:
Wednesday, February 25,1998
bb2Q t �q �, v 5 TI"Z O)P" Spy«
is hecdPcl�
1 lq so Ys
sL��4rd lip Ge_
Ap10.-� 1D �vtowhcLS\
e- ev leis 1 u j"s - is `i�l, i� .�, i h� � ��'�- �e w t
I Gam- o h Iy 10 ca is �,
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Sine _ Damage Report _ Olher
— Utility _ Redline U0 _ Lands*