Loading...
HomeMy WebLinkAboutOD'S SPORTS CROSSING - Filed CS-COMMENT SHEETS - 2005-05-06PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: 21 •.November 199S DEPARTMENT: & PROJECT: 48-SyF 0•�'5 1 F CFossin� - ;7►NAL_ PLANNER: Mike. �Uawib All comments must be received by: 4d�A�(�� M 13 nqS ❑ No Problems ❑ Problems or Concerns (see below or attached) • Site Plan 1. Minimum width of the drive lanes is 24 feet. Please revise proposed widths. • Cover Sheet 1. See General Notes area. • Plat 1. Need to tie property to two section corners. d{ 7 2. An undefined 11 foot easement is shown on sht. 4 please show and define on Plat. • Horizontal Control and Utility Plan 1. See #1, Site Plan. 2. Suggest the addition of ramps as shown on the plan. • On & Offsite Grading and Erosion Control Plans 1. Define the 11 foot easement. 2. Will need an offsite drainage easement for drainage channel and detention pond. • Detail Sheet 6 of 7 1. See comments on Drive Intersection... detail. Date: 1,2 �S� 9S Signature: CHECK IF YOU WISH TO RECEIVE PLAT COPIES OF REVISIONS SITE [D' LANDSCAPE D'UTILITY PROJECT =-n City of Fort Collins COMMENT SHEET Current Planning DATE: 18 September i 995 DEPARTMENT: tI,40Ea� PROJECT: #48-84EIO.D.'s Sport Crossing PUD: Preliminary PLANNER: Mike Ludwig All comments must be received by: Friday, 29 September ❑ No Problems Problems or Concerns (see below) Sec �4't��gc �ecQ Date: Signature CHECK IF YOU WISH TO RECEIVE COPIES OF REVISIONS: r � ❑ P ❑ ITE.. - ❑ LANDSCAPE ❑ UTILITY COMMUNITY PLANNING and 231 NORTH COLLEGE, P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 ENVIRONMENTAL SERVICES... CURRENT PI ALNNING DEPARTNEENT PROJECT COMMENT SHEET -ENGINEERING 10-3-95 PROJECT: O.D.'s Sport Crossing P.U.D. COMMENTS Need to submit a soils report (or an amendment to an existing report). Plat 1. Plan needs a signature blocks ',cr Pt 2. Blanket utility easement does not agree with 11' easement shown on the ! - Site plan. Grading. Drainage and Utility Plan 1. Plan needs a signature block. 2. Provide details of the property entrances (driveway entrances). 3. A public turn -a -round will need to be provided at the east end of Smokey Street or the public will need to be allowed to route through the parking lot. 4. Make sure parking lot has a route wide enough and with proper turning radius to accommodate emergency vehicles. 5. Need to include access ramps in the sidewalk at the driveway entrances and show handicapped accesses to the sidewalk around the building. 6 Need to show all existing utilities and easements on the utility plan. T Need to provide a symbol legend or define the symbol used along the southwest 158' property line. 8. What is the purpose of the offsite grading in the Northeast area ? 9. The offsite grading will require an offsite easement. 10. Show and label the end of the pavement on Smokey Street. 11. Please add the notation of the " Blanket Utility, Drainage, Access Easement ". 12. Provide a note, detail, or dimesion a typical parking space and handicapped parking space. 13- Please indicate existing R.O.W. width and flowline to flowline width. 14_ Removal of existing water pipe, as indicated, will leave a short dead end section of pipe (see redline). If this is correct, contact the Water service for proper termination needs. 15. Utility plan does not agree with Site plan on handicapped parking spaces. Site Plan 1. Plan needs a signature block. 2. Eleven foot easement (undefined type) along South property line does not agree with Blanket Utility, Access, Drainage Easement shown on the Plat. 3. Plan does not agree with Utility plan on Handicapped parking spaces.