Loading...
HomeMy WebLinkAboutOLIVE GARDEN MINOR SUB - Filed GC-GENERAL CORRESPONDENCE - 2005-05-06Commi lv PlanninQ and Environmental rvices Engineering Department City of Fort Collins August 3, 1993 Demix Procut, Inc. Spike Hoffman 5305 South County Road # 9 Fort Collins, CO 80525 Re: Olive Garden Dear Mr. Hoffman: The intent of this letter is to bring to your attention the need to complete the street repair on Boardwalk Drive. As you are aware, this work was part of the required site improvements for the Olive Garden Development. As of this date, the asphalt street repair has not been done in spite of several requests made by our construction inspector Todd Juergens. Please be informed that we are now requesting the completion of this work by Friday, August 20, 1993. If this work is not completed by the date specified, then I will contact your bonding company and request action be taken against the bond dated January 27, 1993. Hopefully, the lack of attention to our previous requests are a result of scheduling conflicts and such drastic action on our part will not be necessary. Please call me at your earliest convenience to let me know when the street repair will be completed. I can be reached at the office number 221-6605 or by my direct line at 221- 6314. Sincerely, David Stringer Chief Construction Inspector cc: Todd Juergens, Engineering Construction Inspector Gary Diede, Director of Engineering 281 North College Avenue • P.O. Box 780 • Fort Collins, CO 80522-0380 • (303) 221-6605