Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK TWENTYEIGHTH BANK OF COLORADO - Filed GC-GENERAL CORRESPONDENCE - 2005-05-05North Star design--- ------ - ------ ------ -------- December 29, 1999 Dave Stringer City of Fort Collins Engineering 281 N. College Ave Fort Collins, CO 80522 Dear Dave, This letter is intended to follow up on our December 16" meeting with Tess Jones from CDOT. In our meeting, we discussed the length of the existing westbound left turn lane on Harmony and documentation of the existing condition was requested to be provided to you. Information provided to me by Matt Delich (and as discussed in our meeting) indicates that the requirement for the left turn is 675' total length. This length would include a 180' taper (15:1 taper) and 495' of full width lane. The total length of the existing left turn is 750', which includes a 285' taper and a 465' full width lane. The existing lane is deficit in the length of the full width lane but the total length exceeds the criteria. Call me if you have any questions or if I can provide you with any additional information 7sy, Patricia Kroetch, P.E. 1200 Carousel Drive, Suite 201 Windsor, Colorado 80550 970-6a6-69 39 Phone & Fax