HomeMy WebLinkAbout113 HICKORY STREET - Filed CS-COMMENT SHEETS - 2005-05-05PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 9, 1998 TO: Engineering
PROJECT: #29-98 115 Hickory Street_ (LUC) Type II PDP
Review
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, August 12,1998
115 hickory Street
August 10, 1998
Eliminate the first parking stall (closest to the street) and move the others toward the building.
Even with this you are not meeting the parking set back (50 feet for a collector). A variance to
this standard needs to be submitted or another parking stall needs to be eliminated.
Provide a walk from the street to the building. If there is a curb along this walk than curb stops
are not needed.
Provide detail D-1 1 Curb and Gutter Details and detail D-15 New Driveway Approach Detail for
moditving the driveway width.
Provide Utility Plan signature block on the utility plans.
Add the general notes that are indicated on the site plan.
Date:
CHECK HERE IF YOU Ull TO RECEIVE COPIES OF REVISIONS
_ PW �4a _ Drxmt(re Report _ fter
— Utility _ Redine Utility _ Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planniing
-�
DATE: July 9, 1998 TO: Engineering Pvmt.
PROJECT: #29-98 115 Hickory Street - (LUC) Type II PDP
Review
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, August 12, 1998
�r orb ,"5 Nee''' o� //'-C:or-y 5��Z-e�
0�jj 7 ->
Date: 77 - C > U
CHECK HERE IF YOU NVISH TO RECEIVE COPIES OF REVISIONS
Plat _ Sii:,1e1'. t _ Drainage Report _ Other 6-
Ufl y _ Redline Utity — LaDdJCape City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 9, 1998 TO: Engineering
PROJECT: #29-98 115 Hickory Street-- (LUC) Type II PDP
Review
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, August 12,1998
115 Hickory Street
August 10, 1998
Eliminate the first parking stall (closest to the street) and move the others toward the building.
Even with this you are not meeting the parking set hack (50 feet for a collector). A variance to
this standard needs to be submitted or another parking stall needs to be eliminated.
Provide a walk from the street to the building. If there is a curb along this walk than curb stops
are not needed.
Provide detail D-1 1 Curb and Gutter Details and detail D-15 New Driveway Approach Detail for
modifying the driveway width.
Provide I itility Plan signature block on the utility plans.
Add the general notes that are indicated on the site plan.
u /J ,_ l
Date: Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_PIS �\� C;� — hW Repod _ %er r
_ Utility _ Redline Ufity — la kap� Gty of Fort Collins