HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK THIRTIETH - Filed CS-COMMENT SHEETS - 2005-05-05r' r REVISION
COMMENT SHEET
DATE: December 23, 1999 DEPT: ENGINEERING
PROJECT: 413-82CF Oakridge Business Park, 291h Filing
PLANNER: Steve Olt L��
ENGINEER: Marc Virata
All comments must be received by: January 12, 2000
❑ No Problems
0 Problems or Concerns (see below or attached)
Comments:
The site is apparently now the 30a' filing.
As noted on the previous submittal., provide for additional 2' of right-of-way dedication along Oakridge
Drive in order to bring Oakridge Drive to current street standards.
As noted on the previous submittal, ��+P r f r offsite easemen�t needed for the curb and
pavement construction being done offsite.
A response from the City Engineer has not been received with regards to the variance requests submitted
by JR Engineering. This information will be sent out as soon as it is received. (It is expected that the
variance request will be denied and additional 2' of right-of-way dedication plus 6.5' of parkway width
will remain as required for Innovation Drive. i
Date: January 19, 2000 Signature: —
PLEASE SEND COPIES OF MARKED REVISIONS
❑ Plat ❑ Site 2 Utility 10 Landscape ❑ Drainage Rep # ❑ NO COMMENTS -SUBMIT MYLARS
REVISION
COMMENT SHEET
DATE: December 23, 1999 TO: Mapping
PROJECT: #13-82CF Oakridge Business Park, 91h Filing,
"Hercules Hercules"(clap clap) (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, January 12, 2000
No Comment
Problems or Concerns (see below or attached)
"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE'"*
..�-�I t✓ -- ��N��✓�� O� Cn"U l9oy
S G, i7
i/
T //
c:- }j Z,413 c U- Tb
k(3m + ti157
3l A Ali c )-E
T-/c�,E ���aJ i i/,acA�,�� THE
Date:
CHECK
_ Plat _ site
Utgity _ Redline Utility
Drainage Report _ Other
— Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 6, 1999 DEPT: ENGINEERING
PROJECT: #13-82CF Oakridge Business Park 9th Filing
Hercules Industries Expansion —
Preliminary/Final LDGS
PLANNER: Steve Olt
ENGINEER: Marc Virata
All comments must be received by: December 1, 1999
❑ No Problems
Problems or Concerns (see below or attached)
General Comments
The traffic study does not mention truck traffic (semi -trailers) with regards to potential
volumes of these large vehicles. How many trips are expected with regards to large vehicles.
The site and utility plans leave question as to how large vehicles are accommodated on and
off -site. Engineering prefers that all loading and unloading movements are accommodated
on -site (vehicles not backing up into the site off of public streets.) How do semi -trailers
access the loading dock area? Please show turning movements on a plan to address how
semi -trailers access the loading dock area. It appears that the off -site access drive off of Oak
Ridge Drive might be the preferred entrance for loading and unloading. Has the owner to the
west given consent for this?
Provide evidence of a joint access easement from the property to the west. Is the property
owner aware of the potential semi -trailer traffic that may use the existing parking lot to back
into the loading dock?
It appears that the plans submitted utilized the same base map, in which curb and gutter as
well as sidewalk disappears around the north edge of this site. Please provide more detail of
the existing improvements (and type of improvements). Please provide more detail on the
Date: l 2 /z /%y Sienature:
PLEASE SEND COPIES .D PLAT v
OF MARKED REVISIONS: ID SITE El UTILITY ❑ NO COMMENTS —SUBMIT MYLARS
lR LANDSCAPE
existing driveway/parking lot to the west to help ascertain how this off -site driveway might
be utilized by this site.
Offsite easements are required prior to a hearing for the improvements to the west.
flow is service planned to continue while construction takes place? Will there be phasing of
the improvements because of the proposed office building? How will loading and unloading
be accommodated during construction phase? This will be further discussed during
Development Agreement and Development Construction Permit stages.
Plat
• Note the redline revisions to the plat language on the Plat and add the following additional
note:
The obligations of the undersigned pursuant to the "maintenance guarantee" and "repair
guarantee" provisions set forth above may not be assigned or transferred to any other person or
entity unless the warranted improvements are completed by, and a letter of acceptance of the
warranted improvements is received from the City by, such other person or entity.
• Add the Filing Number to the Plat title.
• Dedicate 2' of additional right-of-way along Oak Ridge Drive and provide for the additional
2' easement dedication to bring the width to 9'.
Utility Plans
• Note the changes to the General Notes and add the following to General Note #5:
The finished patch shall blend in smoothly_ into the existing surface. All large patches shall be
paved with an asphalt lay -down machine. In streets where more than one cut is made, an overlay
of the entire street width, including the patched area, may be required. The determination of need
for a complete overlay shall be made by The City Engineer at the time the cuts are made.
• The benchmark provision should be noted as an identifier, not a "date".
• Construct and show sidewalk improvements (where such does not already exist) along
Innovation Drive to current Street Standards (4.5' sidewalk detached 6.5'). Provide for
smooth transitions to and from existing sidewalks.
• Continue the sidewalk straight across the driveway, not brought out to the street. Revise the
detail sheets accordingly.
• Revise the asphalt patch area as shown.
• Show the existing curb and gutter (type) as well as sidewalk (width and type) throughout the
entire site_ Where is infall and/or outfall curb and gutter used as noted in the details?
• Please note and distinguish where sidewalk currently exists and where currently proposed.
S.Tc .04.4,v (see redlined plans for additional comments)
•T',.�vT SD S.cus Srrcc .vim 3E wsrnic. p�o.urto iP,cnt-or--4--WV
PROJECT: # 13-S2CF Oakridge Business Park 9' Filing Engineering - Development Review Page 2 of 2
DATE: November 4, 1999 TO: Engineering/Pavement
PROJECT: #13-82CF Oakridge Business Park 91h Filing -
Hercules Industries Expansion —
Prelitninary/Final LDGS
All comments must be received by Steve Olt no later than the staff
review meeting:
December 1, 1999
Please note ignore the first page of the site plan set**
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drninaac Report _Other
Utility Redline Utility _Landscape
4 V
City of Fort Collins
PROJECT
i..A COMMENT SHEET
City Of Fort Collins
Current PlanninLy
DATE: November 4, 1999 TO: Mapping/Drafting
PROJECT: #13-82CF Oakridge Business Park 91h Filing -
Hercules Industries Expansion —
Preliminary/Final LDGS
All comments must be received by Steve Olt no later than the staff
review meeting:
December 1, 1999
** Please note ignore the first page of the site plan set**
k¢-�.
1 (il' T/TC C 6r TNG fC' r1 r (s
14Av6 T(+- �TA Z-� 7-i`4c �U/b T rC _ f 0' 12T�G11
OF tJHtc_�+ is A Dp ZcT � Galfli2ii��e� %�Usine�5s
4-1
l S 14 Pa P ( )+-c o f
F�)Us,lvJ sJ i)41tc j F,LItij ��� % co,vy rvi-r
�v J
JC—i P u;1P 10ti �1 e _ rvI� ^^� 'cam
r � (1Mc� vI '� V.tl eY �� � �11�__�I{u1� b�_-
�loulCl 'WI�i �'= lIE `1t,'F `^-I Pvt C S`; YJ Ui'1,� �'✓i L1�1 +-viF
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report Other _
_Utility _Redline Utility _Landscape
City of Fort Collins