Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK THIRTYFIRST KINDERCARE - Filed CS-COMMENT SHEETS - 2005-05-05REVISION COMMENT SHEET DATE: June 23, 2000 TO: Mapping PROJECT: #13-82CG Oakridge Business Park, 315L Filing, Preliminary/Final, KinderCare Center - (LDGS) All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, July 12, 2000 ❑ No Comment ElProblems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** Date: CIjA HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site _ Drainage Report _ Other Utility _ Redline Utility _ tan&Ve Citv of Fort Collins ♦ Please provide a city signature block for utility plan approval on all sheets within the utility plan set (see attachment for sample signature block). ♦ Please include an access ramp detail and a driveway approach detail. 'fire access ramp detail should be designed similar to Detail D-I2.5 (see redlined sidewalk). The driveway approach detail shall be a modified version of Detail D-15 and D-17. (See attachments for details.) Also, provide all pertinent details as shown in the city's street design manual. ♦ Add the following note (as shown as #8 on the redlined utility plans): All street work necessitating the need to cut into the street shall be done in accordance with the City's "Street Repair and Reconstruction Standards and Guidelines." The City Inspector and/ or the City Engineer has final authority over the street repair limits. ♦ Please provide an access ramp and sidewalk to the north of the access on McMurry Avenue. ♦ The sidewalk along MCMurr_y Avenue will need a variance request signed by a P.E. tojustify the need to have an attached sidewalk. The variance request should be submitted to me (Mark McCallum). The City Engineer shall have final authority over the issue. One recommendation I have is that the sidewalk be increased to six feet. ♦ Please dedicate 4 feet of right-of-way adjacent to McMurry Avenue. ♦ 'fire access along Oakridgc Drive should allow for a future shared access with the property to the west. For options please call me at 221-6605. Also, please adjust the alignment of that access so that it intersects Oakridge Drive at a right angle. ♦ Please provide a four -foot clear area behind the access ramp at the corner of McMurry Avenue and Oakridge Drive. ♦ Please revise the General Notes. ♦ Please add a City Signature Block. ♦ '['hank you for providing the sight lines. In addition to what has been shown, please show the full 400-foot sight line. Site Plan Comments ♦ Please provide 60 feet of parking space setback from McMurry Avenue (see redlined plans). ♦ See and apply all utility plan comments. Plat Comments: ♦ Please address comments from mapping and drafting. ♦ Please see attachment for plat language that should be added. ♦ Please provide sight distance easements. ♦ As was noted above with regard to the shared access between lots, please provide an access easement as necessary. ♦ Please provide a 9400t utility easement adjacent to McMurry Avenue and Oakridge Drive. ♦ Please provide a drainage casement for the water quality system and the drainage system. ♦ Please dedicate 4 feet of right-of-way along McMurry Avenue. Both the utility and site plans show that a parking lot is encroaching into the 30-foot Landscape tract, which was dedicated by separate instrument. Please provide that document which is recorded at the Larimer County Clerk and Recorder. The question that needs to be answered is whether or not parking can be allowed in that tract. Also, provide a copy of the Flarmony Cemetery dedication (BK.63---PG. 172) to verify the property boundary. The Plat is named incorrectly. Please provide proper name. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: June 23, 2000 DEPT: ENGINEERING PROJECT: #13-82CF Kindercare @ Oakridge Bus. Park, 30th Filing —P/F PLANNER: Steve Olt ENGINEER: Mark McCallum All comments must be received by: Wednesday, July 12, 2000 General Comments ♦ See redlined comments on all sheets of the utility, plat, site, and landscape plans. More specific comments will be mentioned below. Utility Plan Comments ♦ Please include an access ramp detail and a driveway approach detail. The access ramp detail should be designed similar to Detail D-12.5 (see redlined sidewalk). The driveway approach detail shall be a modified version of Detail D-15 and D-17. (See attachments for details.) Also, provide all pertinent details as shown in the cm's street design manual (i.e. sidewalk detail). Plat Comments: ♦ Please address continents from mapping and drafting. Date: //,/� Signature:.,/ PLEASE SEND COPIES WPLAT OF MARKED REVISIONS: D"SITE ,9' UTILITY NO COMMENTS — SUBMIT MYLARS Z LANDS( APF, PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: May 512000 PROJECT: 413-82CF 301h Filing PLANNER: Steve Olt DEPT: ENGINEERING Kindercare @ Oakridge Bus. Park, —P/F ENGINEER: Mark McCallum All comments must be received by: Wednesday, May 31, 2000 General Comments See redlined comments on all sheets of the utility, plat, site, and landscape plans. More specific comments will be mentioned below. All Plans and SUPVlements Included I. Utility Plan 2. Site Plan 3. Plat 4. Sight Distance Easement Utility Plan Comments ► Please include an access ramp detail and a driveway approach detail. The access ramp detail should be designed similar to Detail D-12.5 (see redlined sidewalk). The driveway approach detail shall be a modified version of Detail D-15 and D-17. (See attachments for details.) Also, provide all pertinent details as shown in the city's street design manual (i.e. sidewalk detail). ♦ The sidewalk variance request is approved with this submittal. ♦ 'Thank you for providing the sight lines. In addition to what has been shown. please show the full 400-foot sight line. (See redline comments.) Date: C'�/� Signature: PLEASE, SEND COPIES a] PLAT OF MARKED REVISIONS: � SITE -0 UTILITY NO COM"f MENTS—SUBMIMYLARS Z LANDSCAPE ♦ The access easement for the driveway on Oakridge Drive is what city staff was requiring; However, I would like instead of allowing thejog in the curb, please bring the curb straight to the intersection (as redlined). In addition, look at providing a smooth cane with a 25 foot drive (see redlines). Site and Landscape Plan Comments ♦ Please provide sight distance as shown on the utility plans and as worded above. It appears that the fence will interfere with the sight distance line. Please verify the proposed fence with the easement language. Also, add sight distance language (see attachment). Plat Comments: ♦ Please address comments from mapping and draftim, ♦ Please provide sight distance easements. ♦ Show all required easements per redlines. Sight Distance Easement— The sight distance easement is an easement required by the City at some street intersections where it is necessary to protect the line of sight for a motorist needing to see approaching traffic and to react safely for merging their vehicle into the traffic (low. The following are requirements for certain objects that may occupy a sight distance easement for level grade: ( I ) Structures and landscaping within the easement shall not exceed 24 inches in height with the following exceptions: (a) Fences up to 42 inches in height may be allowed as long as they do not obstruct the line of sight for motorists. (b) Deciduous trees may be allowed as long as all branches of the trees are trimmed so that no portion thereof or leaves thereon hang lower than six (6) feet above the ground, and the trees are spaced such that they do not obstruct line of sight for motorists. Deciduous trees with trunks large enough to ohstruct line of sight for motorists shall be removed by the owner. For non -level areas these requirements shall be modified to provide the same degree of visibility. REVISION COMMENT SHEET DATE: May 5, 2000 TO: Mapping PROJECT: #13-82CG Oakridcre Business Park, 31" Filing, KinderCare Learning Center Preliminary/Final (LDGS) All comments must be received by Steve Ott no later than the staff review meeting: Wednesday, May 31, 2000 No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** %'/2, !•LN-c 1Ze.in1c dC %tic. �U �i2Ai G-4Se/71r�,,jTs ¢ -T(4 JU C1 TI L /lj S L i d� � 'l y / S L)xu HEREff YOU WISH TQ RECEIVE copT of REV oNsSignature: ✓flat _ Site _ Drainage Report _ other Utility _ Redline Utility _ Landscape DATE: January 10, 2000 TO: Engineering PROJECT: #13-82CF Kindercare � Oakridge Business Park, 30" Filing — Preliminary/Final (LDGS) All comments must be received by Steve Olt no later than the staff review meeting: February. 2, 2000 E> Note- .Please identify your redlines for future reference -------------------- signature CI IFCK HFRF IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site _ Draina.-e Report Other Utility __Redline Utility —Landscape 0 City of Fort Collins PROJECT i.■.� COMMENT SHEET City of Fort Collins Current Planning DATE: January 10, 2000 TO: Engineering Pavement PROJECT: #13-82CF Kindercare @ Oakridge Business Park, 30" Filing — Preliminary/Final (LDGS) All comments must be received by Steve Olt no later than the staff review meeting: February 2, 2000 [i Note- Please identify your redlines for ficture reference C Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat site __Drainage Report _Other _ Utility _Redline Utility _Landscape E 6 ZKA"M Citv of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 10, 2000 DEPT: ENGINEERING PROJECT: 413-82CF Kindereare @ Oakridge Bus. Park, 30th Filing —P/F PLANNER: Steve Olt ENGINEER: Mark McCallum All comments must be received by: Wednesday, February 2, 2000 General Comments ♦ See redlined comments on all sheets of the utility, plat, site, and landscape plans. More specific comments will be mentioned below. ♦ All Plans and Sup lements Included: 1. Utility Plan 2. Site Plan 3. Plat 4. City of Fort Collins Signature Block Format 5. Plat language Utility Plan Comments ♦ Please show all street cuts and curb and gutter removal. The street cuts should be made in accordance with the city's "Street Repair and Reconstruction Standards and Guidelines". Also, provide a minimum street cut and repair width per the aforementioned standards. ♦ All driveways shall be constructed with concrete within the right-of-way. ♦ Drainage, Grading and Erosion Control Plan, and a Detail Sheet should be included in the utility plan set. "I herefore an index of sheets will need to be provided on a cover sheet for the utility plans or the utility plan. Also, the cover sheet for the utility plans should have -a vicinity map. r'� , Data , �, ;:ID Signature: PLEASE SEND COPIES FPPLAT — OP MARKED RFV ISIONS: SITF tI"f11,ITY I ❑ NO COMMENTS — SUBMIT MYLARS 5�LANDSCAPE