HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK THIRTYFOURTH - Filed CS-COMMENT SHEETS - 2005-05-05PROJECT
(Wzoft COMMENT SHEET
City of Font Collins
Current Planning
DATE: May 9, 2001 TO: Technical Services
PROJECT: #13-82CQ OAKRIDGE BUSINESS PARK 34T" FILING —
NHA OF FORT COLLINS - FINAL COMPLIANCE (LUC)
All comments must be received by Steve Olt in Current Planning no
later than the staff review meeting:
0
May 23, 2001
Note- Please identify your redlines for future reference
1-D
> .tL
�. D, wif h5 iotis G1rQ vvtrSS� ✓�q �1-GH L'li l'GV 64 N}��u yip
i r 7
"� i -1 � ti `� r', i•. _ . r+ . _ ,_ ` _ , b , is a
Nance (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _ Drainage Report Other
Utility Redline Utility Landscape
AFFORDABLE HOUSING
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 5, 2000
DEPT: ENGINEERING
PROJECT: #13-82CD Oakridge Business Park 34th Filing, NHA
Fort Collins — PDP — Type H (LUC)
PLANNER: Ron Fuchs
ENGINEER: Marc Virata
All comments must be received by: October 18, 2000
❑ No Problems
Cd Problems or Concerns (see below or attached)
• In general, please coordinate between the site and utility plans. I'm finding discrepancies between
the two with regards to dimension widths.
• The fire lane shown along the north needs to be 20' wide minimum. If the 5' or 6' sidewalk is part of
this, the sidewalk should be designed to meet the criteria of a fire lane with regards to loading
capabilities. Note that the site plan and utility plans appear to conflict with regards to this sidewalk
width.
• A turnaround for the fire lane needs to be provided with a minimum diameter of 80' [LUC 3.6.6(E)].
This would not be required in the instance where the fire lane exceeds 150' in total length from the
intersecting public street, which appears to be the case with the proposal.
• Is 5'/6' sufficient for the bike/ped connection in lieu of the street connection?
• The hammerheads need to be a minimum of 35' in depth, not 25' as proposed on the utility plan.
• Please better show current right-of-way and street width along Wheaton Drive in order to see what is
dedicated. The utility plans and site plans appear to conflict with regards to the proposed sidewalk
width and separation width from the curb. Clearly indicate these dimensions.
• PFA would prefer that the fire hydrant shown on the south side of the southern drive aisle be
relocated on the north side of the aisle in order to prevent the hose from crossing a travel lane.
• Please note the redline changes to the General Notes and plat language. Add the following paragraph
to the end of (and as part of) the Repair Guarantee language:
The Obligations Of The Undersigned Pursuant To The "Maintenance Guarantee " And "Repair
Guarantee" Provis ions Set Forth Above May Not Be Assigned Or Transferred To Any Other Person Or
Entity Unless The I Uarranted Improvements Are Completed By, And A Letter Of Acceptance Of The
Warranted Improi ements Is Received From The City By, Such Other Person Or Entity.
• Provide an access ramp for the sidewalk across the south side of the northern driveway (and a detail
Date: October 25. ?000 Signature:
PLEASE SEND COPIES OF MARKED REVISIOO IqSS-
0 Plat 10 Site 0 Utility 0 Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS
of this on the utility plan detail sheet.
It appears that drainage is being directed from the private drive across the public sidewalk with this
plan on the north side of the southern driveway. Drainage is not allowed to be directed across the
sidewalk per ".6.2(L)(2)(l).
The plat needs to show the access and utility easement along the south driveway as emergency access
easement as %%ell.
Why is 8.8' of utility easement being dedicated on the plat? 9' is required for Wheaton Drive as a
collector road\% ay.
See plans for any additional comments
Development Review Comments — Page 2
fit
Current Planning
Affordable Housithy
Comment Beset
DATE: October 5, 2000 TO: En ineering
HL C I
All C _`);iiifi ii. i �', i ', ed? 1 Ron Fuchs in Current
no L?! i.l; lick'; IiMimi:
Wellnesdav, October 18, 2000
'rz3tk'a Please Zd C`Itt(1 ,l' I- �'L',��Iftesfimfliture 1`f'�('7-ence
Date
_-__----__-_-__-_-_
.. �`il 1. fii..\i lfytiii RIA 1 P, LU,''•__`, CH i2. ilslo'l\'
e3. ui
PROJECT
�� COMMENT SHEET
Citv of Fort Collins
Current Plannin-,
DATE: May 9, 2001 TO: Engineering Pavement
PROJECT: #13-82CQ OAKRIDGE BUSINESS PARK 347' FILING —
N HA OF FORT COLLINS - FINAL COMPLIANCE (LUC)
All comments must be received by Steve Olt in Current Planning no
later than the staff review meeting:
May 23, 2001
Note- Please identify your redlines for future reference
Name (please print) --
CHECK HERE IF YOV WISH TO RECEIVE COPIES OF REVISIONS
Plat Sitc Dramagc Report Other
Utility Redlinc Utilm Landscape cav f Fort Collins
®1 Affordable Housing
Obw
rF
Comment Sheet
DATE: March 2, 2001
DEPT: ENGINEERING
PROJECT: #13-82CD Oakridge Business Park 341h Filing —
NHA (National Healthcare Associates) — Type II (LUC)
PLANNER: Steve Olt
ENGINEER: Marc Virata
All comments must be received by: March 28, 2001
❑ No Problems
0 Problems or Concerns (see below or attached)
General Comments:
1. No comments were addressed regarding the plat. Please see the comments from the previous
submittal. (156 /irr!,4cvc;� /✓Z,i -e7AT ( Y6UALfs—.a' 6-Z eC,-,0v.e,
2. An ID Sign is indicated on the utility plan set and is located in the utility easement, this might be of
concern to the utilities depending on the structure. I did not see a detail of the sign on the
architectural drawings.
3. Coordinate between the site and utility plan. There are discrepancies with regards to pedestrian
connections, ID sign location, etc.
4_ Pedestrian connectivity was questioned by Transportation Planning. It appears that based on the
utility plan, the pedestrian area along the building between the handicap parking and the front facade
along Wheaton shows pedestrians having to walk through a "Can Wash" among other item. ( What
is a "Can Wash"?) Please ensure unobstructed pedestrian connectivity.
5. Per PFA, The maximum length of a fire lane is 150' from the intersecting street. As such, the fire
lane needs to be measured 150' from the flowline of Wheaton Drive. This area needs to be dedicated
as an emergency access easement on the plat. The current additional length beyond the 150' needs to
be eliminated.
Site Plan Comments:
1. Coordinate between the utility plan and site plan. See redlines for additional comments.
Landscape Plan Comments:
1. Show the ID sign on the plan (in the location that corresponds to both the utility and site plan.)
Utility Plan Comments:
1. Show the existing contours surrounding the property. It appears that off -site construction easements
are possible for the construction along the north side of the property.
Date: March 30, 2001 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS
10 Plat R1 Site 2 Utility 121 Landscape 0 Drainage R port ❑ NO COMMENTS -SUBMIT MYLARS
2. Show expanded patching and add the following note referencing the patching:
Limits of street repair are approximate. Final limits to be determined in the field by the City
Engineering Inspector. All repairs to be in accordance with City Street repair standards.
3_ Replace the General Notes on the utility plan with the attached General Notes. This is available in
electronic format and should be used on all current projects that were not first submitted after March
1, 2001.
4. Remove the access ramps being shown on the driveway entrance of Wheaton Drive. Per the standard
drawing detail, access ramps won't be created.
5. Note the telephone riser is to be relocated.
Development Review Comments — Page 2
REVISION
COMMENT SHEET
DATE: March 2, 2001 TO: Technical Services
PROJECT: #13-82CD Oakridge Business Park 341h Filing —
NHA (National Healthcare Associates) — Type II
(LUC)
All comments must be received by Steve Olt in Current Planning
no later than the staff review meeting:
/'BAR e ►/,
March 28, 2001
❑ No Comment
QProblems or Concerns (see below or :.:.ached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
�I O N c- OF O J ( Co rA w1 S W r S
OCT-0Gcz & 18) Zc,vo H.4vc
A'Dv--, a-e sse o
7HERE IF YOU MSH TO RECEIVE COPIES OF REVISIONS
_ Plat _ Site _ Drainage Report _ Other
Utility _ Redline Utility Landscape
Date: __ Signature:
F-i�en^.
3F.dr-1J
REVISION
COMMENT SHEET
DATE: March 2, 2001 TO: Engineering
PROJECT: #13-82CD Oakridge Business Park 34" Filing —
NHA (National Healthcare Associates) Type I I
(LUC)
All comments must be received by Steve Olt in Current Planning
no later than the staff review meeting:
March 28, 2001
ElNo Comment
❑ Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site __ Drainage Report _ Other
Utility Redline Utility Landscape
Date: _Signature:_
Affordable Housing
�! r®®®l� Comment Sheet
L� J
Current Planning
DATE: October 5, 2000 TO: Technical Services
PROJECT: #13-82CD Oakridge Business Park, 341h
Filing, NHA Fort Collins — PDP — Type II
(LUC)
All comments must be received by Ron Fuchs in Current
Planning no later than the staff review meeting:
Wednesday, October 18, 2000
Note- Please identify your redlines for future reference
(�CJ/JT�o�
l`iun/d/�lt3�rs Ndr-
�E�Su2ii3dJ
ZD
PL-,Qr is
IV15s11V7 cukve5-
l�� - �uui✓a-3�
3,
t36 A1aT CC oScr.
7—/eA-C7-�9
7E)
7-r-44AJ
IZA,1 % (!�" 19 !1�
7
ROL) . 4 ��, j GU 14 C A Ta
-r/-rii� inJ L(26Ac 000'.S AJ,) rV7,47-,rt -T77-LL� 0r.i /-�2.,4-7—
Signature
— Date �L~�
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
City of Fort Collins
8 Fla+ �a�e c eas w0' tMa�� � ��e�� �� u,P.
Lrtse,,"e,-J3 G �avt5 Norl� 11v�e titee� WlvrC �iwir.
Io be locai�OLLle-
U
+C> rgFrC)duc� � 0 0 8uq�S'e oF1'as
1
Affordable Housing
Comment Sheet
LL
Current Planning
DATE: October 5, 2000 TO: Engineering
Pavement
PROJECT: #13-82CD Oakridge Business Park, 34th
Filing, NHA Fort Collins — PDP — Type II
(LUC)
All comments must be received by Ron Fuchs in Current
Planning no later tban the staff review meeting:
Wednesday, October 18, 2000
Note- Please identify your redlines for future reference
/�0 �/X !q
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other