Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK THIRTYFIFTH OAKRIDGE BUSINESS PARK PLAZA - Filed CS-COMMENT SHEETS - 2005-05-04PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: 12.20.00 DEPT: ENGINEERING PROJECT: #13-82CP Oakridge Business Park 351h filing PDP— TYPE H (LUC) PLANNER: Steve Olt ENGINEER: Katie Moore All comments must be received by: December 27, 2000 ❑ No Problems ❑ Problems or Concerns (see below or attached) Comments: • Is this the correct setback for the new Harmony alignment? • Dedicate utility, access, and landscape easements for 80' setback. • Dedicate ROW off the new Harmony alignment to major standards. - +— -In southeast comer of lot, provide connection to existing access easement. • Current access location not a good location for future drive across Oakridge. • Show ramps. Darken parking lot lines and other light lines. +, Correct titles — is this the 33rd, 30, or 35ffi filing? • Correct typos, sheet numbering, general notes, and plat language. See attached pages. • Flow from a private drive cannot be channeled over a public sidewalk 3.6.2 (L)(2)f • On the west and east edges of the lot grading easements are needed. • Please correct detail sheet to conform with city standards. • Modify note on sheet 4 next to street cut to state: Limits of street repair are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with city street repair standards. • Provide adequate space for transformers. • On the utility plan cover sheet please reference the soils investigation report and include the following Indemnification Statement: These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed in any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items show that may be required during the construction phase. y - 1, 7 Date: January 3, 2001 Signature: I� L L �- ) � t PLEASE SEND COPIES OF MARKED REVISIONS 4 Plat 1,0 Site 0 Utility q Landscape 0 Drainage Report 0 NO COMMENTS -SUBMIT MYLARS 00 City of Fort Collins Current Plannitw PROJECT COMMENT SHEET DATE: November 30, 2000 TO: Technical Services PROJECT: 913-82CP OAKRIDGE BUSINESS PARK 35TH FILING PDP - TYPE 11(LUC) All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: December 27, 2000 6�,p Note- Please identify your redlines for future reference I, FLAT Ccos� GECAL JJoc'S�/T CCGSE. LEGAL FEAT �dN7- MFTGfI. z, S L/ 1� V t: �{ G IZ :�'rtt T� t-ttM•i (� i ��-- /.; o i i3 � T+'c�e: PT,4 n��� jc C tTI A-rr�. arFi�� i �Ak-R_t0C,u llfZty� W�5 �t:hcaT-v� R� AT t S M s- L.4 r� L i H 33 Fttt_iN1 - Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins Project Comments Sheet Selected Departments City of Fort Collins Current Planning DATE: September 5, 2001 PROJECT: OAKRIDGE BUS. PARK 35TII FILING, 913-82CP All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: August 29, 2001 iVote - Please identify your redlines for future reference Dept: Engineering 3 Issue Contact Katie Moore Site Plan: Please include sight distance triangles for both directions for the site south of Oakridge Drive using new street standards (Drawing 7-16) g Issue Contact: Katie Moore Plat comments: Under legal description, please show date of preparation 9 Please correct wording as redlined. Issue Contact: Katie Moore 12 Issue Contact: Katie Moore Utility plan cover sheet: Please correct general notes. 24 Issue Contact: Katie Moore Detail sheet: Please correct detail D-15 to match standard. 26 Please see plans for additional comments. 1 of Issue Contact: Katie Moore U:3 79 7 Me 41 42 43 L'L1 45 m 47 Issue Contact Katie Moore Utility plan cover sheet: I have attached the indemnification statement that should be shown on the cover sheet. Issue Contact. Katie Moore Plat: Please rename the emergency fire access easement as an Emergency Access and Access Easement (sounds weird, but it needs to be an access easement as well as an emergency access easement). Issue Contact: Katie Moore Plat: Is there already 177' of ROW existing on Harmony? The number provided for the Harmony ROW should be the existing ROW. Issue Contact: Katie Moore Plat: What is Tract A for? See plat for additional comments. Issue Contact: Katie Moore Utility Plan: Please provide a smooth connection to the sidewalk to the west. Issue Contact Katie Moore Utility Plan: Please show the offsite placement of the temporary asphalt sidewalk along Harmony to the corner at McMurry. Please see plan for additional comments. Issue Contact: Katie Moore Utility Plan: Please provide a detail (plan view) of the concrete channel connection to the curb. Issue Contact: Katie Moore Utility plan: please provide a directional ramp at the corner of the Kindercare driveway. Issue Contact: Katie Moore Grading plan: The Harmony sidewalk is shown as 8' but labeled as 12.5'. Issue Contact: Katie Moore Detail sheet 7: Near D-10, please provide a note with the dimensions of the steel plate since yours will be diagonal and will not match the specified dimensions.. 2 of 49 Issue Contact: Katie Moore Sheet T Outlet structure detail. please show how the two sections tie together (see redlines). 50 Issue Contact: Katie Moore Site and Landscape Plans: Please show ramps to match utility plans. 51 Issue Contact: Katie Moore Site plan sheet 1: note 20: Tract A is undefined on the plat. 52 Issue Contact: Katie Moore Site plan: please show the temporary asphalt sidewalk all the way to McMurry. Please match with utility plans. 62 Issue Contact: Katie Moore Please include a detail of the handicapped ramps adjacent to the parking stalls in the north row of parking. ' - Ca 1 Sigiuu7ve Date CHECK HERE 11"YOU WISH TO RECEIVE COPIES OF REVISIONS plat k site Drainage Report Other Utility Redline Utility Landscape 3 of Project Comments Sheet Selected Departments C:ityof tort Collins Department: Engineering Date: October 30, 2001 Project: OAKRIDGE BUS. PARK 35TH FILING, #13-82CP All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: ` l0V -Augus# 9, 2001 Note - Please identify your redlines for future reference Issue Contact: Katie Moore 63 Site plan note 10: Note is incorrect. Phases must be shown on all plans in order for phased improvements to be allowed. 64 Site plan note 19: There is still a discrepancy between the definition of Tract A on the site plan and on the plat. Please coordinate. 65 Site plan: Please label and include dimension for Harmony and Oakridge ROW. 66 Site plan: Please show temporary sidewalk connection to McMurry intersection with Harmony, including ramps. 67 Utility plan cover sheet: Please correct typos in indemnification statement. 68 Plat: Please see redlines for comments. 69 Utility plan sheet 2: Please show additional areas to be patched/cut from curb to bike lane line. L Signature Date L- lJ l CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS', Plat Site Drainage Report Other , lL j kl Y Utilitv _� Redline Utility Landscape Page I 70 Utility plan sheet 2 Where is the ROW in relation to the temporary asphalt sidewalk? Please label sidewalk as asphalt and not attached concrete. 71 Utility plan sheet 2: please clarify that the temporary sidewalk will be placed around the trees, which are to remain. 72 Utility plan sheet 4: Please show how temporary sidewalk connects to McMurry intersection. Show ramps. 73 Utility plan sheet 5: See redlines. Pa,-e 2 City of Foil Collins Current Planning PROJECT I COMMENT SHEET V DATE: October 23, 2001 TO: Technical Services PROJECT: #13-82CR Oakridge Business Park, 351h Filing - Final Compliance All comments must be received by Steve Olt no later than the staff review meeting: November 7, 2001 Note- Please identify your redlines for fiititre reference �. GAT � L�CafFL CLU S� Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline utility _Landscape Citv of Fort Collins • Please include drainage arrows showing positive drainage to streets or to an approved drainage facility. • On the utility plan, please show existing features for a minimum of 150' beyond the project limits. • Please include the City's signature block on sheets 2 and 3. • Please show existing utilities along Harmony. Sign placement must not conflict with utilities. • See plans for additional comments. PROJECT COMMENT SHEET Citv of Foil Catlins, Current Planning DATE: November 30, 2000 TO: Engineering Pavement PROJECT: #13-82CP OAKRIDGE BUSINESS PARK 35T" FILING PDP - TYPE II (LUC) All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: December 27, 2000 Note- Please identify your redlines for fitture reference >VCcon, 4 Signature - Z,-, -cv CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _Drainage Report _Othcr _Utility _Redline Utility Landscape Citv of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current PlanninLy DATE: November 30, 2000 TO: Technical Services PROJECT: #13-82CP OAKRIDGE BUSINESS PARK 35TH FILING PDP - TYPE II (LUC) All comments must be received by STEVE OLT in Current Planning no later than the staff review meeting: December 27, 2000 Note- Please identify your redlines for future reference )26A7- (LOfit GE�f�L DoESi✓T ccSE, GEGAG fAi ?d vT �✓A1CF/. 2 SURVC=Yotz i,;I tia C� Accc:PTA n�` k R IOCz� �i2lV� WA5 AT t S I 'ts-L_4r�Ceta I -H�. L Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS V Plat Site _Drainage Report Other _Utility —Redline Utility Landscape 6a City u£ Furt Collins Project Comments Sheet [MOM %aazmb Selected Departments City r>f Purt Cotlil�s Current Planning DATE: Nlav 9, 2001 PROJECT: OAKDRIDGE BUS. PARK 35TH FILING, 913-82CP All comments must be received by in Current Planning no later than the staff review meeting: [Vote - Please identify your redlines for future reference Dept: Engineering Issue Contact Katie Moore Please show phasing on utility plans. Phase 1 should include entire driveway. 2 Issue Contact: Katie Moore Site Plan: Please remove note 14 and, instead, please provide the design for the sidewalk connection to MCMurry. 3 Issue Contact: Katie Moore Please include sight distance triangles for both directions for the site south of Oakridge Drive using new street standards (Drawing 7-16) 4 Issue Contact: Katie Moore Handicapped parking stalls along north edge of lot are not wide enough. 5 Issue Contact: Katie Moore Drive aisle along southeast corner of lot needs to be 22' wide (LUC 3.2.2(L)2) 6 Issue Contact: Katie Moore Please show ramps at sidewalk connections through parking lot to building A. 7 Please see additional comments on plans. 1 of 3 Issue Contact. Katie Moore 8 Issue Contact: Katie Moore Plat comments: Under legal description, please show date of preparation 9 Issue Contact: Katie Moore Please correct wording as redlined. 10 Issue Contact Katie Moore Please show total ROW for Harmony and dimension. 11 Issue Contact: Katie Moore Please dedicate additional emergency access easement as noted on plat. 12 Issue Contact: Katie Moore Utility plan cover sheet: Please correct general notes. 13 Issue Contact: Katie Moore Please include legal description under title. 14 Issue Contact Katie Moore Please include address/phone/fax/etc for owner and developer. 15 Issue Contact Katie Moore Overall utility plan: Please clearly show phasing. 16 Issue Contact Katie Moore Please change note(s) for street cuts (continued comment), see plans for wording. 17 Issue Contact Katie Moore Please remove parking lot islands from emergency access easement area. 18 Issue Contact: Katie Moore Please show driveway cut according to detail - match flare widths, sidewalk connections. 19 Issue Contact Katie Moore Why is one crosswalk striped differently than the other two? 20 Issue Contact: Katie Moore Grading plan: Offsite grading easements are needed along west edge of property (continued comment). 21 Issue Contact: Katie Moore New street standards allow up to 500 square feet of sheet flow from driveway (9.4.11A). Please reduce area to meet this requirement. 22 Issue Contact: Katie Moore Why isn't sidewalk culvert perpendicular to sidewalk and flow line? 23 Issue Contact: Katie Moore Steel plating over sidewalk culvert needs to extend to curb. 2 of 24 Issue Contact Katie Moore Detail sheet: Please correct detail D-15 to match standard. 25 Issue Contact: Katie Moore Curb and gutter detail: please remove the inflow curb and gutter from where it is shown. Since it is for curb and gutter onsite and is not city -approved, it should not be included on the standard city detail sheet. 26 Issue Contact: Katie Moore Please see plans for additional comments. 32 Issue Contact: Katie Moore Please change ROW dedication for Harmony. See plat for ]HOP attached. Please match their ROW dedication. Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Sc Site Drainage Report Other _ Utility Redline Utility Landscape IMEMIMMUM ff Lmammn Cityof Fort Collins 3 of REVISION COMMENT SHEET DATE: August 8, 2001 TO: Technical Services PROJECT: #13-82CP Oakridge Business Park, 351h Filing PDP - Type II (LUC) All comments must be received by Steve Olt in Current Planning no later than the staff review meeting: August 29, 2001 No Comment �roblerns or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** ]MOM HERE IF YOU WISH TO RECEIVE COPIES OF REVISION,'�;ignatare: L Plat Site Drainage Report _ Other — Utility _ Redline Utility Landscape 6a REVISION COMMENT SHEET DATE: April 17, 2001 TO: Tech Svs PROJECT: #13-82CP Oakridge Business Park, 35th Filing — PDP — Type II (LUC) All comments must be received by Steve Olt in Current Planning no later than the staff review meeting: May 9, 2001,aT'� No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** rJ07 GLOSS. TeX IRF vnn w RD T4.RLr�nrF rnn y� nF RF�7eln� ignature: Plat _ Site _ Drainage Report _ other _ Ot lily Redline Utility _ Landscape Citv of Fort Collins