Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK TWENTY-FIRST FILING - Filed CS-COMMENT SHEETS - 2005-05-04PROJECT COMMENT ENT SHEET City of Fort Collins Current Plannink DATE: Mary 14, 1997 DEPT:� PROJECT: Oakridge PP 21 st filing - Hampton Inn (other pad site) PLANNER: Steve Olt ENGINEER: ,Sheri Wamhoff All comments must be received by: 6/3/97 No Problems 'Problems or Concerns (see below or attached) Oakridge BP 21st filing, Lot 2 • Sheets need to be numbered 8 and 9 of 9. June 9, 199' The original plans need to be modified to indicate these are a par, of the set or a cover sheet and details will need to be provided with this set -'Fite cover sheet needs to be modified to show the additional two pages - The plans sheets need to be marked on Lot 2 to see sheets 8 and 9 for correct layout and grading. Easement dedication statement needs to be modified as indicated on the attached comment. sheet Date: (;�'% `%Y Signatures PLEAM7ER13Z. _. REVISIONS: ❑—FLAT ❑ SITE ❑ UTILITY ❑ LANDSCAPE Oakridge BP 21 st filing - easement dedication June 9, 1997 The following items need to be addressed on the drainage and access easement dedication received for Oakridge BP. 21 st filing_ The original dedication statement, a sample dedication statement and procedure statement are attached Thefollowing needs to be added to the dedication statement: • maintenance statement - see sample for language • City acceptance block - see sample for language- Note: City will not sign this document as a grantee, acceptance of easement dedication is by council action and vacation of easements is done by P and Z action. No signature other than the clerks acceptance is needed, attorney cen:ification PROJECT COMMENT SHEET Citv of Fort Collins Current Planning DATE: November 15, 1996 DEPT: Engineering PROJECT: #13-8213T Oakridge Business Park, 21st Flg. Resubmittal of Hampton Inn PUD, Lot 2 - Final PLANNER: Steve Olt All comments must be received by: Wednesday, November 27, 1996 Oakridge Business Park, 21 st filing - resubmittal of Hampton Inn PUD, Lot 2 - Final The building as shown encroaches on the plated utility easements. This property needs to be replaced or the easements need to be vacated prior to approval. The grading shown on this plan out along Harmony differs from that shown on the approved plans. The existing utility plans need to be modified to reflect the new layout or a new set of utility plans need to be submitted. Date: Signature; CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS ❑ SITE ❑ LANDSCAPE ❑ UTILITY