Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK PUD TWENTYTHIRD OAKRIDGE DESIGN CENTER - Filed CS-COMMENT SHEETS - 2005-05-04PROJECT COMMENT SH EET of DATE: DEPARTMENT: Ek�el PROJECT: T!)P 2300 CEJ\,)T� PLANNER: chi ���— W- All comments must be received by: No Problems 0 Problems or Concerns (see below) BP 23rd filing, Design Center access drives should have a 15 foot radius not a 20 foot. the Detail sheet label the "Attached Sidewalk" detail as being "on site". Feb 4, 1997 Date: � Signature2�)� �l CHECK IF YOU WISH TO RECEIVE ❑ T COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 PLANNING DEPARTMENT (303)221-6750 PROJECT COMMENT SHEET City of Fort Collins Current Plannine DATE: November 27, 1996 DEPT: Enginering PROJECT: #13-82BW Oakridge Business Park PUD, 23rd Filing, Oakridge Design Center - P&F PLANNER: Steve Olt All comments must be received by: Monday, December 16, 1996 Oakridge Business Park PUD, 23rd Filing, Oakridge Design Center Plan review Dec 16, 1996 1. Sidewalk along Innovation Drive needs to be 4.5 feet in width and detached 6 feet from the flowline. 2. The most easterly parking lot along the access has parking spaces to close to the street. The parking stalls need to beset back a minimum of 40 feet from the flowline of the travel way. It appears that two spaces will be lost. Plat 3. It is sight distance not site distance easement. 4. Put the sight distance easement restrictions on the plat: SIGHT DISTANCE EASEMENT RESTRICTIONS THE AREA WITHIN SIGHT DISTANCE EASEMENTS IS RESTRICTED TO THE FOLLOWING: FENCES SHALL NOT EXCEED 42" IN HEIGHT AND SHALL BE OF OPEN DESIGN. IF FENCES EXCEED 32" IN HEIGHT, THEY SHALL BE CONSTRUCTED OF SPLIT RAIL WITH A MINIMUM DIMENSION OF 12" BETWEEN HORIZONTAL MEMBERS. 2. BERMS, HEDGES, AND SHRUBS SHALL NOT EXCEED 32" IN HEIGHT. 3. TREE PLANTING SHALL BE RESTRICTED TO DECIDUOUS TREES ONLY. THE LOWEST BRANCH OF ANY TREE SHALL BE NO LESS THAN 42" FROM GRADE (Continued on next page) Date: �Z�� 4c� Signature Q.rt'lh CHECK IF YOU WISH TO RECEIVE [� PLAT COPIES OF REVISIONS SITE ANDSCAPE UTILITY Oakridge Business Park PUD, 23rd Filing, Oakridge Design Center Plan review (page 2 of 2) Dec 16, 1996 5 Row needs to be dedicated to the back of the walk. This will probably require the dedication of an additional 1.5 feet of row Utility Plans utility plan and horizontal control 6 Sidewalk along Innovation Drive needs to be 4.5 feet in width and detached 6 feet from the flowline. 7 The most easterly parking lot along the access has parking spaces to close to the street. The parking stalls need to be set back a minimum of 40 feet from the flowline of the travel way. It appears that two spaces will be lost. 8. The utility plans show curb and gutter connecting the two parking areas, but the site plan shows the curb and gutter going across where the grass pavers start. 9_ Indicate access locations in reference to the property lines. Fine grading and paving plan 10. perforated curb detail, what about a plan view? What is the spacing on these? Detail 11 Ramp detail needs to be the new ramp detail or a detail for detached walk. 12 Make changes to street access intersection gutter detail. 13. See plans for additional changes.