HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK PUD TWENTYTHIRD OAKRIDGE DESIGN CENTER - Filed CS-COMMENT SHEETS - 2005-05-04PROJECT
COMMENT SH EET
of
DATE: DEPARTMENT: Ek�el
PROJECT: T!)P 2300 CEJ\,)T�
PLANNER: chi ���— W-
All comments must be received by:
No Problems
0 Problems or Concerns (see below)
BP 23rd filing, Design Center
access drives should have a 15 foot radius not a 20 foot.
the Detail sheet label the "Attached Sidewalk" detail as being "on site".
Feb 4, 1997
Date: � Signature2�)� �l
CHECK IF YOU WISH TO RECEIVE ❑ T
COPIES OF REVISIONS: ❑ SITE
❑ LANDSCAPE
❑ UTILITY
DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580
PLANNING DEPARTMENT (303)221-6750
PROJECT
COMMENT SHEET
City of Fort Collins
Current Plannine
DATE: November 27, 1996 DEPT: Enginering
PROJECT: #13-82BW Oakridge Business Park PUD, 23rd
Filing, Oakridge Design Center - P&F
PLANNER: Steve Olt
All comments must be received by: Monday, December 16, 1996
Oakridge Business Park PUD, 23rd Filing, Oakridge Design Center
Plan review Dec 16, 1996
1. Sidewalk along Innovation Drive needs to be 4.5 feet in width and detached 6
feet from the flowline.
2. The most easterly parking lot along the access has parking spaces to close
to the street. The parking stalls need to beset back a minimum of 40 feet from
the flowline of the travel way. It appears that two spaces will be lost.
Plat
3. It is sight distance not site distance easement.
4. Put the sight distance easement restrictions on the plat:
SIGHT DISTANCE EASEMENT RESTRICTIONS
THE AREA WITHIN SIGHT DISTANCE EASEMENTS IS RESTRICTED TO THE FOLLOWING:
FENCES SHALL NOT EXCEED 42" IN HEIGHT AND SHALL BE OF OPEN
DESIGN. IF FENCES EXCEED 32" IN HEIGHT, THEY SHALL BE
CONSTRUCTED OF SPLIT RAIL WITH A MINIMUM DIMENSION OF 12"
BETWEEN HORIZONTAL MEMBERS.
2. BERMS, HEDGES, AND SHRUBS SHALL NOT EXCEED 32" IN HEIGHT.
3. TREE PLANTING SHALL BE RESTRICTED TO DECIDUOUS TREES ONLY.
THE LOWEST BRANCH OF ANY TREE SHALL BE NO LESS THAN 42"
FROM GRADE
(Continued on next page)
Date: �Z�� 4c� Signature Q.rt'lh
CHECK IF YOU WISH TO RECEIVE [� PLAT
COPIES OF REVISIONS SITE
ANDSCAPE
UTILITY
Oakridge Business Park PUD, 23rd Filing, Oakridge Design Center
Plan review (page 2 of 2) Dec 16, 1996
5 Row needs to be dedicated to the back of the walk. This will probably require the
dedication of an additional 1.5 feet of row
Utility Plans
utility plan and horizontal control
6 Sidewalk along Innovation Drive needs to be 4.5 feet in width and detached 6 feet
from the flowline.
7 The most easterly parking lot along the access has parking spaces to close to the street.
The parking stalls need to be set back a minimum of 40 feet from the flowline of the
travel way. It appears that two spaces will be lost.
8. The utility plans show curb and gutter connecting the two parking areas, but the site
plan shows the curb and gutter going across where the grass pavers start.
9_ Indicate access locations in reference to the property lines.
Fine grading and paving plan
10. perforated curb detail, what about a plan view? What is the spacing on these?
Detail
11 Ramp detail needs to be the new ramp detail or a detail for detached walk.
12 Make changes to street access intersection gutter detail.
13. See plans for additional changes.