Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK PUD TWENTYSIXTH - Filed CS-COMMENT SHEETS - 2005-05-03City of Fort Collins Current Planninv PROJECT COMMENT SHEET DATE: ?%? PROJECT: Ca k r ;do /3i' DEPT: Engineering PLANNER: % ti-s;./cue -, \J ✓/" ENGINEER -`�iL, (c z��, / ell f q No Problems —Problems or Concerns (see below or attached) 9 Date. Signature: `` PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLA'T ❑ SITE ❑ UTILITY ❑ LANDSCAPE Oakridge Business Park 26th - Comfort Suites (Page 3 of 3) Dec 19, 1996 Details 26. Street intersection gutter detail needs to be renamed to driveway intersection gutter detail. This detail also needs to be modified to reflect driveway conditions and requirements. 27. Provide additional street cross sections. 28. See plans for additional comments. REVISION T COMMENT SI4EE 3n I o97 MY I DATE: APril e Business PROJECT: Filing Oakridg Filing - Comfort Suites (LDGS) Final L ,Anne Harter Fngineering Park PUD, 26th PLANNER: e the mments must be reciev e day aM 1997 staff review All co Wedn May 9, 1997 Oakridge BP 26th filing Comfort Suites n being done by Sear Brown. I think that the plans correspond with the road e verified Need to verify grades that need to be verified. we are set on layout it is now the g o the south and the temporary turn around easement need to be receive The access easement t to the board. prior to this proj ect going e that are located near the access w a curb chase and pipe differently on the landscape not sho The site and landscape plan do ears that the berms are shown drive off of oakridge Drive. It also appear plan than they are on the grading plan. Dater — cau Rfi IF YOU VIS'm TO UMA ✓6�ty v'� Otility 00PES OP BEVL 01 Damage Report meeting ME r V Olhe� t CS of PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 6, 1997 DEPT: Engineering PROJECT: REVISIONS #13-82BW Oakridge Business Park, Comfort Suites, 26tb Filing - P/FI PLANNER: Mike Ludwig All comments must be received by:, x Oakridge BP 26th, Filing PUD - Comfort Suites March 3, 1997 Site Plan I The sidewalk should be placed to our standards and the utilities moved to accommodate the detached sidewalk. Plat 2. The utility easement behind the row should turn the corner with a radius. Utility Plans 3. The sidewalk should be placed to our standards and the utilities moved to accommodate the detached sidewalk. 4 The road design as provided by RBD DOES NOT correspond with your design. They are showing a high point in the road east of the intersection. They have not addressed what they are going to do with the: drainage trapped in the low area, so the design may change to something closer to what you have shown. What they have provided does not work with the grading and drainage you are showing, though. 5- If the street is not built all the way through to McMurry then an 80 foot turn around will be required at the property line- r- The stripping on Oakridge Drive should have lane widths as follows: (we had a change of mind) 7 foot bikelanes_ 12 foot travel and turn lanes - 7- We still need detail # 4 on the detail sheet- r Date: Signature' CHECK IF YOU WISH TO RECEIVE -0 PLAT COPIES OF REVISIONS 0 SITE ❑ LANDSCAPE UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 6, 1997 DEPT: Engineering PROJECT: REVISIONS #13-82BW Oakridge Business Park, Comfort Suites, 26th Filing - P/Fl PLANNER: Mike Ludwig All comments must be received by: p?l g 1 q� Oakridge BP 26th, :Filing PUD - Comfort Suites March 3, 1997 Site Plan 1. The sidewalk should be placed to our standards and the utilities moved to accommodate the detached sidewalk. Plat 2_ The utility easement behind the row should turn the corner with a radius. Utility Plans 3. The sidewalk should be placed to our standards and the utilities moved to accommodate the detached sidewalk. 4_ The road design as provided by RBD DOES NOT correspond with your design. They are showing a high point in the road east of the intersection. They have not addressed what they are going to do with the drainage trapped in the low area, so the design may change to something closer to what you have shown. What they have provided does not work with the grading and drainage you are showing, though. 5. If the street is not built all the way through to McMurry then an 80 foot turnaround will be required at the property line. 6. The stripping on Oakridge Drive should have lane widths as follows: (we had a change of mind) 7 foot bikelanes, 12 foot travel and turn lanes. 7_ We still need detail # 4 on the detail sheet. - l �l Date: �/� /� Signature �Y�//(%O CHECK IF YOU WISH TO RECEIVE 'EIr PLAT COPIES OF REVISIONS ,(SITE ❑ LANDSCAPE UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 27, 1996 DEPT: Enginering PROJECT: #13-82BV Oakridge Business Park PUD, 26th Filing, Comfort Suites - P&F PLANNER: Mike Ludwig All comments must be received by: Monday, December 16, 1996 Oakridge Business Park 26th - Comfort Suites Dec 19, 1996 1. Before this project can be taken to the Board verification will need to be made that the street alignment for Oakridge Drive on these plans is in accordance with the plans being done by RBD for the entire street. This alignment needs to be verified to know that the site size and/or layout will not change. Site Plan 2. Sidewalks that run in front of parking spaces need to be a minimum of 6 feet to allow for the 2 foot overhang of the vehicles. 3. Curbs at the entrance drives should have a 15 foot radius. 4. Walks on both streets shall be 5 feet in width with an 8 foot parkway. 5. Row along both streets needs to be dedicated to the back of the sidewalk. 6. Oakridge Drive will be a collector with a 50 foot flowline to flowline dimension to be stripped with two 6 foot bike lanes, two 13 foot travel lanes, and a 12 foot left turn lane. Plat 7. The row at the east end of the property needs to be 76 feet in width and at the west end of the property it needs to be 86 feet with the 9 foot median. 8. The city only requires a 9 foot utility easement along a collector street unless the utilities have requested a larger easement. (Continued on next page) Date: 1� �Signatur CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS ❑ SITE ❑ LANDSCAPE ❑ UTILITY Oakridge Business Park 26th - Comfort Suites (page 2 of 3) Dec 19, 1996 9. The easements along the row shouldn't need to be pedestrian easements as the sidewalk will be within the row. 10. Additional row will need to be dedicated along Wheaton Drive to the back of the walk. 11. Access easements need to be provided at the access points if the access are to be considered joint access. Utility Plans Overall Utility Plan 12. Curb ra&us at the entry drives should have a 15 foot radius. 13. Label walk width on Wheaton Drive. 14. Access drive need to be concrete to the property line. The property line will be at the back of the walk. 15. The sidewalk ramps at the access drives do not need to sit at the corner since this is riot a city street. They can be at the property line. 16. Sidewalks that run in front of parking spaces need to be a minimum of 6 feet to allow for the 2 foot overhang of the vehicles. Grading, Drainage and Erosion control plan 17. Off site grading easements will be needed along the south and east property lines. Construction, access and drainage easements will also be needed for the access drive off of Wheaton Drive. Oakridge Plan and Profile 18. Indicate where the existing pavement ends at the intersection of Wheaton Drive and Oakridge Drive. Provide elevations at this intersection in accordance with detail D-18. 19. Flowline to flowline dimension on the north side of the median needs to be 31 feet to accommodate a 12 foot turn lane, a 13 foot travel lane, and a 6 foot bike lane. 20. Provide a typical cross section of Oakridge Drive thru the median. 21. May calculations indicate that the slope on the south side of the Oakridge Drive median is closer to 1 %. A 2.0% minimum needs to be kept. 22. Provide a striping plan for Oakridge Drive. The cross section (without the median) shall be 6 foot bike lane, 13 foot travel lane, 12 foot left turn lane, 13 foot travel lane, and a 6 foot bike lane. 23. If the street is not built all the way thru by the time this project wants a certificate of occupancy a 80 foot temporary turn around will need to be provided at the eastern edge of the property. 24. What type of irrigation is planned in the median? Outflow gutter is only allowed if drip or trickle type irrigation is used. Other types of irrigation require a inflow gutter with inlets. See Section 1.02.03.10 25. Before these plans can be approved we will need to verify that they are in accordance with the plans RBD is doing for the entire roadway to McMurry Drive for alignment and grade purposes. (Continued on next page) Oakridge Business Park 26th - Comfort Suites. (Page 3 of 3) Dec 19, 1996 Details 26. Street intersection gutter detail needs to be renamed to driveway intersection gutter detail. This detail also needs to be modified to reflect driveway conditions and requirements. 27. Provide additional street cross sections. 28. See plans for additional comments. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: November 27, 1996 DEPT: Enginering PROJECT: #13-82BV Oakridge Business Park PUD, 26th Filing, Comfort Suites - P&F PLANNER: Mike Ludwig All comments must be received by: Monday, December 16, 1996 Oakridge Business Park 26th - Comfort Suites Dec 19, 1996 1. Before this project can be taken to the Board verification will need to be made that the street: alignment for Oakridge Drive on these plans is in accordance with the plans being done by RBD for the entire street. This alignment needs to be verified to know that the site size and/or layout will not change. Site Plan 2. Sidewalks that run in front of parking spaces need to be a minimum of 6 feet to allow for the 2 foot overhang of the vehicles. 3. Curbs at the entrance drives should have a 15 foot radius. 4. Walks on both streets shall be 5 feet in width with an 8 foot parkway. 5. Row along both streets needs to be dedicated to the back of the sidewalk. 6. Oakridge Drive will be a collector with a 50 foot flowline to flowline dimension to be stripped with two 6 foot bike lanes, two 13 foot travel lanes, and a 12 foot left turn lane. Plat 7. The row at the east end of the property needs to be 76 feet in width and at the west end of the property it needs to be 86 feet with the 9 foot median. 8. The city only requires a 9 foot utility easement along a collector street unless the utilities have requested a larger easement. (Continued on next page) Date: I Z� ��rI1D Signatur. CHECK: IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS ❑ SITE ❑ LANDSCAPE ❑ UTILITY Oakridge Business Park 26th - Comfort Suites (page 2 of 3) Dec 19, 1996 9. The easements along the row shouldn't need to be pedestrian easements as the sidewalk will be within the row. 10. Additional row will need to be dedicated along Wheaton Drive to the back of the walk. 11. Access easements need to be provided at the access points if the access are to be considered joint access. Utility Plans Overall Utility Plan 12. Curb radius at the entry drives should have a 15 foot radius. 13. Label walk width on Wheaton Drive. 14. Access drive need to be concrete to the property line. The property line will be at the back of the walk. 15. The sidewalk ramps at the access drives do not need to sit at the corner since this is not a city street. They can be at the property line. 16. Sidewalks that run in front of parking spaces need to be a minimum of 6 feet to allow for the 2 foot overhang of the vehicles. Grading, Drainage and Erosion control plan 17. Off site grading easements will be needed along the south and east property lines. Construction, access and drainage easements will also be needed for the access drive off of Wheaton Drive. Oakridge Plan and Profile 18. Indicate where the existing pavement ends at the intersection of Wheaton Drive and Oakridge Drive. Provide elevations at this intersection in accordance with detail D-18. 19. Flowline to flowline dimension on the north side of the median needs to be 31 feet to accommodate a 12 foot turn lane, a 13 foot travel lane, and a 6 foot bike lane. 20. Provide a typical cross section of Oakridge Drive thru the median. 21. May calculations indicate that the slope on the south side of the Oakridge Drive median is closer to 1 %. A 2.0% minimum needs to be kept. 22. Provide a striping plan for Oakridge Drive. The cross section (without the median) shall be 6 foot bike lane, 13 foot travel lane, 12 foot left turn lane, 13 foot travel lane, and a 6 foot bike lane. 23. If the street is not built all the way thru by the time this project wants a certificate of occupancy a 80 foot temporary turn around will need to be provided at the eastern edge of the property. 24. What type of irrigation is planned in the median? Outflow gutter is only allowed if drip or trickle type irrigation is used. Other types of irrigation require a inflow gutter with inlets. See Section 1.02.03.10 25. Before these plans can be approved we will need to verify that they are in accordance with the plans RBD is doing for the entire roadway to McMurry Drive for alignment and grade purposes. (Continued on next page)