Oakridge Business Park 26th - Comfort Suites (Page 3 of 3) Dec 19, 1996
Details
26. Street intersection gutter detail needs to be renamed to driveway
intersection gutter detail. This detail also needs to be modified to reflect
driveway conditions and requirements.
27. Provide additional street cross sections.
28. See plans for additional comments.
REVISION T
COMMENT SI4EE
3n I o97 MY I
DATE: APril e Business
PROJECT: Filing
Oakridg Filing - Comfort Suites
(LDGS) Final
L ,Anne Harter
Fngineering
Park PUD, 26th
PLANNER: e the
mments must be reciev e day aM 1997 staff review
All co Wedn
May 9, 1997
Oakridge BP 26th filing Comfort Suites
n being done by Sear Brown. I think
that the plans correspond with the road e verified
Need to verify grades that need to be verified.
we are set on layout it is now the g
o the south and the temporary turn around easement need to be receive
The access easement t to the board.
prior to this proj
ect going e that are located near the access
w a curb chase and pipe differently on the landscape
not sho
The site and landscape plan do ears that the berms are shown
drive off of oakridge Drive. It also appear
plan than they are on the grading plan.
Dater —
cau Rfi IF YOU VIS'm TO UMA
✓6�ty v'� Otility
00PES OP BEVL 01
Damage Report
meeting ME
r
V Olhe� t CS of
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: February 6, 1997 DEPT: Engineering
PROJECT: REVISIONS #13-82BW Oakridge Business
Park, Comfort Suites, 26tb Filing - P/FI
PLANNER: Mike Ludwig
All comments must be received by:, x
Oakridge BP 26th, Filing PUD - Comfort Suites March 3, 1997
Site Plan
I The sidewalk should be placed to our standards and the utilities moved to accommodate the
detached sidewalk.
Plat
2. The utility easement behind the row should turn the corner with a radius.
Utility Plans
3. The sidewalk should be placed to our standards and the utilities moved to accommodate the
detached sidewalk.
4 The road design as provided by RBD DOES NOT correspond with your design. They are
showing a high point in the road east of the intersection. They have not addressed what they are
going to do with the: drainage trapped in the low area, so the design may change to something
closer to what you have shown. What they have provided does not work with the grading and
drainage you are showing, though.
5- If the street is not built all the way through to McMurry then an 80 foot turn around will be
required at the property line-
r- The stripping on Oakridge Drive should have lane widths as follows: (we had a change of
mind) 7 foot bikelanes_ 12 foot travel and turn lanes -
7- We still need detail # 4 on the detail sheet- r
Date: Signature'
CHECK IF YOU WISH TO RECEIVE -0 PLAT
COPIES OF REVISIONS 0 SITE
❑ LANDSCAPE
UTILITY
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: February 6, 1997 DEPT: Engineering
PROJECT: REVISIONS #13-82BW Oakridge Business
Park, Comfort Suites, 26th Filing - P/Fl
PLANNER: Mike Ludwig
All comments must be received by: p?l g 1 q�
Oakridge BP 26th, :Filing PUD - Comfort Suites March 3, 1997
Site Plan
1. The sidewalk should be placed to our standards and the utilities moved to accommodate the
detached sidewalk.
Plat
2_ The utility easement behind the row should turn the corner with a radius.
Utility Plans
3. The sidewalk should be placed to our standards and the utilities moved to accommodate the
detached sidewalk.
4_ The road design as provided by RBD DOES NOT correspond with your design. They are
showing a high point in the road east of the intersection. They have not addressed what they are
going to do with the drainage trapped in the low area, so the design may change to something
closer to what you have shown. What they have provided does not work with the grading and
drainage you are showing, though.
5. If the street is not built all the way through to McMurry then an 80 foot turnaround will be
required at the property line.
6. The stripping on Oakridge Drive should have lane widths as follows: (we had a change of
mind) 7 foot bikelanes, 12 foot travel and turn lanes.
7_ We still need detail # 4 on the detail sheet. - l �l
Date: �/� /� Signature �Y�//(%O
CHECK IF YOU WISH TO RECEIVE 'EIr PLAT
COPIES OF REVISIONS ,(SITE
❑ LANDSCAPE
UTILITY
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: November 27, 1996 DEPT: Enginering
PROJECT: #13-82BV Oakridge Business Park PUD, 26th
Filing, Comfort Suites - P&F
PLANNER: Mike Ludwig
All comments must be received by: Monday, December 16, 1996
Oakridge Business Park 26th - Comfort Suites Dec 19, 1996
1. Before this project can be taken to the Board verification will need to be made
that the street alignment for Oakridge Drive on these plans is in accordance with
the plans being done by RBD for the entire street. This alignment needs to be
verified to know that the site size and/or layout will not change.
Site Plan
2. Sidewalks that run in front of parking spaces need to be a minimum of 6 feet
to allow for the 2 foot overhang of the vehicles.
3. Curbs at the entrance drives should have a 15 foot radius.
4. Walks on both streets shall be 5 feet in width with an 8 foot parkway.
5. Row along both streets needs to be dedicated to the back of the sidewalk.
6. Oakridge Drive will be a collector with a 50 foot flowline to flowline dimension
to be stripped with two 6 foot bike lanes, two 13 foot travel lanes, and a 12 foot
left turn lane.
Plat
7. The row at the east end of the property needs to be 76 feet in width and at
the west end of the property it needs to be 86 feet with the 9 foot median.
8. The city only requires a 9 foot utility easement along a collector street unless
the utilities have requested a larger easement.
(Continued on next page)
Date: 1� �Signatur
CHECK IF YOU WISH TO RECEIVE ❑ PLAT
COPIES OF REVISIONS ❑ SITE
❑ LANDSCAPE
❑ UTILITY
Oakridge Business Park 26th - Comfort Suites (page 2 of 3) Dec 19, 1996
9. The easements along the row shouldn't need to be pedestrian easements as
the sidewalk will be within the row.
10. Additional row will need to be dedicated along Wheaton Drive to the back of
the walk.
11. Access easements need to be provided at the access points if the access
are to be considered joint access.
Utility Plans
Overall Utility Plan
12. Curb ra&us at the entry drives should have a 15 foot radius.
13. Label walk width on Wheaton Drive.
14. Access drive need to be concrete to the property line. The property line will
be at the back of the walk.
15. The sidewalk ramps at the access drives do not need to sit at the corner
since this is riot a city street. They can be at the property line.
16. Sidewalks that run in front of parking spaces need to be a minimum of 6 feet
to allow for the 2 foot overhang of the vehicles.
Grading, Drainage and Erosion control plan
17. Off site grading easements will be needed along the south and east
property lines. Construction, access and drainage easements will also be
needed for the access drive off of Wheaton Drive.
Oakridge Plan and Profile
18. Indicate where the existing pavement ends at the intersection of Wheaton
Drive and Oakridge Drive. Provide elevations at this intersection in accordance
with detail D-18.
19. Flowline to flowline dimension on the north side of the median needs to be
31 feet to accommodate a 12 foot turn lane, a 13 foot travel lane, and a 6 foot
bike lane.
20. Provide a typical cross section of Oakridge Drive thru the median.
21. May calculations indicate that the slope on the south side of the Oakridge
Drive median is closer to 1 %. A 2.0% minimum needs to be kept.
22. Provide a striping plan for Oakridge Drive. The cross section (without the
median) shall be 6 foot bike lane, 13 foot travel lane, 12 foot left turn lane, 13
foot travel lane, and a 6 foot bike lane.
23. If the street is not built all the way thru by the time this project wants a
certificate of occupancy a 80 foot temporary turn around will need to be provided
at the eastern edge of the property.
24. What type of irrigation is planned in the median? Outflow gutter is only
allowed if drip or trickle type irrigation is used. Other types of irrigation require a
inflow gutter with inlets. See Section 1.02.03.10
25. Before these plans can be approved we will need to verify that they are in
accordance with the plans RBD is doing for the entire roadway to McMurry Drive
for alignment and grade purposes.
(Continued on next page)
Oakridge Business Park 26th - Comfort Suites. (Page 3 of 3) Dec 19, 1996
Details
26. Street intersection gutter detail needs to be renamed to driveway
intersection gutter detail. This detail also needs to be modified to reflect
driveway conditions and requirements.
27. Provide additional street cross sections.
28. See plans for additional comments.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: November 27, 1996 DEPT: Enginering
PROJECT: #13-82BV Oakridge Business Park PUD, 26th
Filing, Comfort Suites - P&F
PLANNER: Mike Ludwig
All comments must be received by: Monday, December 16, 1996
Oakridge Business Park 26th - Comfort Suites Dec 19, 1996
1. Before this project can be taken to the Board verification will need to be made
that the street: alignment for Oakridge Drive on these plans is in accordance with
the plans being done by RBD for the entire street. This alignment needs to be
verified to know that the site size and/or layout will not change.
Site Plan
2. Sidewalks that run in front of parking spaces need to be a minimum of 6 feet
to allow for the 2 foot overhang of the vehicles.
3. Curbs at the entrance drives should have a 15 foot radius.
4. Walks on both streets shall be 5 feet in width with an 8 foot parkway.
5. Row along both streets needs to be dedicated to the back of the sidewalk.
6. Oakridge Drive will be a collector with a 50 foot flowline to flowline dimension
to be stripped with two 6 foot bike lanes, two 13 foot travel lanes, and a 12 foot
left turn lane.
Plat
7. The row at the east end of the property needs to be 76 feet in width and at
the west end of the property it needs to be 86 feet with the 9 foot median.
8. The city only requires a 9 foot utility easement along a collector street unless
the utilities have requested a larger easement.
(Continued on next page)
Date: I Z� ��rI1D Signatur.
CHECK: IF YOU WISH TO RECEIVE ❑ PLAT
COPIES OF REVISIONS ❑ SITE
❑ LANDSCAPE
❑ UTILITY
Oakridge Business Park 26th - Comfort Suites (page 2 of 3) Dec 19, 1996
9. The easements along the row shouldn't need to be pedestrian easements as
the sidewalk will be within the row.
10. Additional row will need to be dedicated along Wheaton Drive to the back of
the walk.
11. Access easements need to be provided at the access points if the access
are to be considered joint access.
Utility Plans
Overall Utility Plan
12. Curb radius at the entry drives should have a 15 foot radius.
13. Label walk width on Wheaton Drive.
14. Access drive need to be concrete to the property line. The property line will
be at the back of the walk.
15. The sidewalk ramps at the access drives do not need to sit at the corner
since this is not a city street. They can be at the property line.
16. Sidewalks that run in front of parking spaces need to be a minimum of 6 feet
to allow for the 2 foot overhang of the vehicles.
Grading, Drainage and Erosion control plan
17. Off site grading easements will be needed along the south and east
property lines. Construction, access and drainage easements will also be
needed for the access drive off of Wheaton Drive.
Oakridge Plan and Profile
18. Indicate where the existing pavement ends at the intersection of Wheaton
Drive and Oakridge Drive. Provide elevations at this intersection in accordance
with detail D-18.
19. Flowline to flowline dimension on the north side of the median needs to be
31 feet to accommodate a 12 foot turn lane, a 13 foot travel lane, and a 6 foot
bike lane.
20. Provide a typical cross section of Oakridge Drive thru the median.
21. May calculations indicate that the slope on the south side of the Oakridge
Drive median is closer to 1 %. A 2.0% minimum needs to be kept.
22. Provide a striping plan for Oakridge Drive. The cross section (without the
median) shall be 6 foot bike lane, 13 foot travel lane, 12 foot left turn lane, 13
foot travel lane, and a 6 foot bike lane.
23. If the street is not built all the way thru by the time this project wants a
certificate of occupancy a 80 foot temporary turn around will need to be provided
at the eastern edge of the property.
24. What type of irrigation is planned in the median? Outflow gutter is only
allowed if drip or trickle type irrigation is used. Other types of irrigation require a
inflow gutter with inlets. See Section 1.02.03.10
25. Before these plans can be approved we will need to verify that they are in
accordance with the plans RBD is doing for the entire roadway to McMurry Drive
for alignment and grade purposes.
(Continued on next page)