Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK TWENTYEIGHTH BANK OF COLORADO - Filed CS-COMMENT SHEETS - 2005-05-03PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: July, 19, 1999 DEPT: Engineering PROJECT: # 13-82CD Oakridge Business Park 28`h LDGS PLANNER: 'Ted Shepard ENGINEER: Dave Stringer All comments must be received by: 7/21/99 eNo Problems Problems or Concerns (see below or attached) 1. Need to design right turn lane startingat Oakridge Drive intersection to Harmony Rd. 2. Need to construct right turn lane with this project. 3. Colorado Department of Transportation requires a modification to the State Access Permit, Work with Tess Jones, Access Coordinator (970) 350 - 2163. 4. Bike Lanes are to be 8 feet in width 6. Fade out background and only highlight what is being constructed, remove unnecessary detail 7. Increase size of street cross sections, maintain straight line grade from existing crown to proposed lip of gutter Comments from CDOT 1. Need to verify and show deceleration and acceleration lengths meet the new State requirements, show in detail existing conditions 2. Need to include a signal plan of intersection of McMurrary with Harmony 3. Check with City Traffic Engineer if any improvements to the North side of McMurrary will be required. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: July, 19, 1999 DEPT: Engineering PROJECT„ # 13-82CD Oakridge Business Park 28" EOGS -- PLANNER: Ted Shepard ENGINEER: Dave Stringer All comments must be received by: 7/21/99 BNo Problems Problems or Concerns (see below or attached) 1. Need to design right turn lane starting at Oakridge Drive intersection to Harmony Rd. 2. Need to construct right turn lane with this project. 3. Colorado (Department of Transportation requires a modification to the State Access Permit, Work with Tess Jones, Access Coordinator (970) 350 - 2163. 4. Bike Lanes are to be 8 feet in width 6. Fade out background and only highlight what is being constructed, remove unnecessary detail 7. Increase sire of street cross sections, maintain straight line grade from existing crown to proposed lip of gutter Comments from CDOT 1. Need to verify and show deceleration and acceleration lengths meet the new State requirements, show in detail existing conditions 2. Need to include a signal plan of intersection of McMurrary with Harmony 3. Check with City Traffic Engineer if any improvements to the North side of McMurrary will be required. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 8,1999 DEPT: Engineering PROJECT: #-13-82D Oakridge Business Park 28`h Filing - Bank of Colorado PDP - Type I LUC PLANNER: Steve Olt ENGINEER: Dave Stringer All comments must be received by: 9/8/99 8 No Problems No or Concerns (see below or attached) 1. Need to construct right turn lane with this project. 2. Colorado Department of Transportation requires a modification to the State Access Permit, Work with Tess Jones, Access Coordinator (970) 350 - 2163. 3. Install subdrain system in pipe and daylight into storm sewer pipe 4. Minor redline comments on plans Comments from CDOT 1. Need to verify and show deceleration and acceleration lengths meet the new State requirements, show in detail existing conditions ( 2v0 request) 2. Need to include a signal plan of intersection of McMurrary with Harmony (Phis is a plan that shows existing signals, lane widths, turn arrows etc. contact Traffic Engineer if unsure. This relates to their comments regarding receiving lanes on Harmony Road for left turns off McMurray) r c; Date: / Signature. A L, <�, , �r 2 PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT ❑ SITE ❑ UTILITY ❑ LANDSCAPE REVISION COMMENT SHEET DATE: August 19, 1999 TO: Mapping/Drafting PROJECT: #13-82D Oakridge Business Park, 28" Filing — Bank of Colorado PDP — Type I (LUC) All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, September 8, 1999 ❑ No Comment Problems or Concerns (see below or attached) Date: Signature:_ CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site _ Drainage Report _ Other Utility _ Redline Utility _ Landscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: June 4,1999 DEPT: PROJECT: Oakridge Business Park PLANNER: Steve Olt ENGINEERING 1. This project will be subject to Colorado Department of Transportation regulations as it pertains to Ilarmony Road. Additional Right -of -Way will be required, A CDOT Access Permit will be required. 2. Show all existing and proposed easements on plat 3. Off -Site easement needed at storm water connection on Oakridge Drive? 4. Right turn / thru lane to be constructed from Oakridge Drive to Harmony 5. Sidewalk outside of R.O.W. needs to be in a public access easement 6. 80 foot set back requirement is from future edge of pavement not existing - _ 7. An acceleration lane is needed on Harmony per CDOT Access Code 3.8.5c, other requirements may be needed after CDOT review. 8. Show intersection of the north leg of McMurrary, how does this line up with what is being proposed 9. Work with Traffic Engineer for signing and striping 10. Provide cross slope of existing street and proposed lane addition at 50 foot intervals. Maintain existing cross slopes 11. Use City of Fort Collins vertical curb,gutter standards Detail 11 12 Use correct City signature block Date: - �' ? Signature:, PLEASE SEND COMES OF MARKED REVISIONS: PLAT SITE UTILITY LANDSCAPE