DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: () ` 0 Issuance Date: Y61110
Project Name: Kaufman & Robinson Office Development
Project Location: 1330 Blue Spruce Drive
Permittee: John Baker
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ 400.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 1 223.00
Total $ 1,623.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 21 126.40
Form of security deposited with the City:
L�3h .-
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
GUARANTY BANj�_ 1331 Seventeenth Street 98193
I
! 0
Denver, Colorado 80202 e
AND TRUST COMPANY 1303) 293-5500
DATE September 7, 2010
U
PURCHASER KAUFMAN & ROBINSON INC a
c
0
PAv TWENTY-ONE THOUSAND ONE HUNDRED TWENTY-SIX AND 40/100 mD
TO THE CITY OF FORT COLLINS
ORDER OF
If this check is lost, stolen or destroyed within 90 days of the date it is issued, we will not
pay or issue a replacement check without an indemnity bond. After 90 days, we will pay or
issue a replacement check upon receipt of a properly executed declaration of loss form.
CASHIER'S CHECK
COMMENT: INFRASTRUCTURE ESCROW
$*****21,126.40***'
s
a
a
AUTHORIZED SIGNATURE c
m
115098 L9 311' 1: L0 2000966l: O L S000004 SBuI
Development Construction Permit, Page 2/5
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. . This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/5
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager' s Signature: te: �Z�• d
Approval for issuance:
City Engineer Apprc val: Date: 040
(Permit Issuance Date)
Development Construction Permit, Page 415
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Kaufman & Robinson Office Development
City Staff Contact Persons:
Development Engineer:
Andrew Carney, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6501 Fax 970-221-6378
Email: acarney_&fcgov.com
Construction Inspector:
Tracy Dyer, 281 N. College Ave., Fort Collins, CO 80521
Office 970-416-2011 Cell: 970-222-0855
Email: tdyer(a�fc o
Current Planner:
Steve Olt, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6341 Fax 970-221-6378
Email: solt e,fc og v.com
Water Utilities Engineer:
Erosion Control Inspector: D.A. Black, 700 Wood Street, Fort Collins, CO 80521
Cell 970-218-3011 Fax 970-221-6619
Email: dblack e fc og v.com
Natural Resources:
Erica Saunders, 215 N. Mason St., Fort Collins, CO 80521
Office 970-416-2032 Email: esaunderskfcgov.com
Traffic Operations:
Syl Mireles, 626 Linden Street, Fort Collins, CO 80521
Office 970-221-6815 Fax 970-6282
Email: smireles ,fcgov.com
Transportation Planning:
Kathleen Bracke, 281 N. College Av., Fort Collins, CO 80521
Development Construction Permit, Page 515
Office 970- 224-6140 Email: kbrackekfcgov.com
Forestry:
Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521
Office 970-224-6302 Fax 970-221-6586
Email: rzentz@fcpov.com
Light and Power:
Doug Martine, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6152 Fax 970-221-6619
Email: dmartine a2fcgov.com
Developer' Contact Persons:
Project Manager/Developer/Owner:
Jim Kahn, Kaufman & Robinson, 1306 Blue Spruce Dr., Fort Collins, CO 80524
Office:970-495-0187 Fax:970-484-9350
Email: kahngionsources.com
Planner:
Steve Lane, BASIA Architecture, P.C., 1692 Big Thompson Ave., Estes Park, CO 80517
Office:970-586-9140 Fax:970-586-9149
Email: steve_lane e,basisarchitecture.com
Project Engineer:
Troy Campbell, Ridgeline Consultants, Inc., 16911 Potts Place, Mead, CO 80542
Office:970-535-0419 Fax:970-535-0429
Email: twc eridgelineconsultants.com
General Contractor:
John Baker, Delta Construction, Inc., 708 Racquette Dr., Fort Collins, CO 80524
Office:970-498-8766 Fax:970-498-8770
Email: jbakerAdeltaconstruction.com
LLSo8 ops+oloo *Rd ssls3 $
oo& 9Mng'snusny uosdwogi Ole Z88L
O
A
v
ww
0
O
�a
O
a
rf
Ili
i; bZ508 opejoloc) `su.1100 Pod
anNp eorudg on18 0££ L C
;ueWdowea eal,4yo g
o uosulgon V ueuu;ne)l
ell
YCCY YYYC ppallleMIF
AA�AAe�ae �3�
000000
O O O O O O
0000000000
O In In O O O O O O O
0 0 0 0 0 0
O O O O O O
Q
OO
000�00
r� 69).6111 P�- 69 f/i
ON(V COOOLnOIn
6i3 N N 'IT 69 69 I,- M fl- M
M6r- O0'
O f- Cl) h 0 69
'
69 69
69 69 E9 64
69 69 69
69 - 69 -
64 W. 69
R
Z
O
� N
H
V
=
w
LU
Ozw
F- LL
'
J
000000
f�t�U� U�00
0000000000
flf�fl0000000
LO000Lr)Lr)
't000ll�'t
z
F
00Cl) MCl) M
ffi 69 FA Efl O O
00000MOtAll m
69 69 69 f.- I- O h M M M
0;;;;;69 00
69 ER ffl 64> 69
w
O W Li
n 69
69 69 � 613,643,6F), 69
m
=
F-�ow
0
W ui d 0 1-
Z
y W M
J
zU.—
3
o>0000
o o 0 0 0
00>0000000
0 0 0 0 0 0 0 0 0
0000000
o v, o 0 0 0 o
F
z
0
z
F-
0 NMY�6q609
Lna
604� M 0 W609N O 0 0
64e} 6090 000 -609
t0`.W
N 2
U
�
N
Ma0 ONO
V N M � � w-
tD 0-
N O N
`
k
W
V,
W
69 6iT to 64
69 69 to'
T... O
a�
c
a
N LL
O O
W
�w?v
;a
o>0000
oo�0000000
0000000
>
(j
000000
N-0 0 0 0 0
0000000000
6 6 m a 0 0 00 0 0
0000000
0 0 0 0 0 Ln 0
=., IL
W
W
M69 Lf)00
t!3 -p � 0 0
CNN MOON_000
09,64 -p Iq LQ� o o
69-69N 'tEfl
EA � 69
Ix
�6N96M9
69
�
Z
W H
7
7�669d3(�69
W
LL
V Z W
Q m
c
L)
3
C�0
H x W'
U)W
w0
.�'x
O
�0.
I-
'{.' W
Zo
zLL 00 U.
0
OCL
W
N 0 0 0 0
O p-^ N O O r N
O N� O N O
Z
W
W Z
Z 0O
x O
O
wN
W
G C VZ
S
++
M
LL, �w'
;0
d.'J
J
wCla
O
LL Z
yN
a
xx
LL: LC UU
xxxxxxx
LLLLLLUUUUUUU
(nZLLLLLL}>=
v Z
W G
2 W
JJUUw W
JJJ W W W W W W W
J0JJ_I(6(6
IL
z m
0
ULL
ZN
ZO
c)
J
�_ U
W
>
Z
p
d
y
Z 0:
W H
0 p
W
�
—a
C9 L)
N 4)
>
z�
�
n ~zm
oo
m
mU
a
o
Of
IL
ma
cy V
_
m:RW
�H0
c
JH
yZF-
O
N m co
"
U)
i7LL
N
m cy
•c m�
o2S
VU
C
d2
Ar-
N C
N
>�WQa
x
dA
$$dof6
nU
mM M 0 =
(n3>
a)6
cC�aL)0IL
ZLL�
_
Q
mam �
N N j N NM N N N N
N
th V O
Or ��a�
r
e:m
O
Kaufman & Robinson Office Development
7/21/2010
DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET
Contact name
Company Name
Address
Phone Number/email address
Zo8 IZpG6zVCTTE Ple.
970 5� -Cy9ly ,�8nr�esKc'�p�t.'U4CaNslxu
. �
�10�to�a �(iActrt,,HM �►-ra•3�t-Z�34
bE �wu+t�►r�Ope�,tw.
us 1t*4 ae.c%e Dvt�f ceM
IroNur G+uzo.; Lo Soco"
m!"in?'0tA1 Vo Rilr-s^032
i
�q.4 d"jr
1� (GH r Y- Pow O-/"Z
.1>1"19/2TJN e(5dc"G449✓. CO,-k'1
)RI-6Sot
acarn� ✓ �
�VA-k#VL Nk 20
<C)1-1L-
2 22 - !� 69Z `f
City of
F6rt Collins
/-, 0 �-- -
Planning, Development & Transportation
Engineering Department
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970.221.6605
970.221.6378 - fax
kgov. com/engineering
MEMORANDUM
TO: Chris Donegon, Investment Administrator
FROM: Andrew Carney / Rebecca Bernstein
DATE: September 7, 2010
RE: Initiate Escrow Account
This memo is to acknowledge the receipt of escrow funds in the amount of $21,126.40
for the following:
1306 Blue Spruce Drive, Evergreen Park Fourth Filing (AKA Kaufman & Robinson)
for the completion of
all public improvements to be constructed as shown on the approved plans for
the development.
When improvements to the Right -of -Way are completed, please call our
inspection recorder at 221-6609 to request an inspection (please allow 24 hours
for the inspection to take place). Once the improvements have passed inspection,
the funds in escrow will be released to you.
Escrow funds have been received from:
Guaranty Bank and Trust Company
1331 Seventeenth Street
Denver, CO 80202
303.293.5500
cc: Initiate Escrow file
Chris Donegon, Investment Administrator
Initiated by: Andrew Carney
Permit # 10-06