HomeMy WebLinkAboutOAKRIDGE BLOCK ONE PUD SECOND - Filed CS-COMMENT SHEETS - 2005-05-03PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 2000 - DEPT: ENGINEERING
PROJECT: #13-82CI Oakridge Business Park, Block 1, Lots 2 & 3
PLANNER: Steve Olt
ENGINEER: Marc Virata
All comments must be received by: 10/25/00
❑ No Problems
0 Problems or Concerns (see below or attached)
Comments:
• Offsite easements are required in conjunction with a mylar submittal, mylars will not be returned to
the engineer without these easements. The previous reviewer noted that a letter of intent for offsite
easements is required prior to hearing (which has not been received.) In actuality, the easements
were required by code prior to hearing.
• The previous reviewer noted that a plat is suggested for the needed dedication and vacation of onsite
easements. I have yet to see a plat or dedication/vacation by separate document for review. The
proper documents are required prior to or conjunction with a mylar submittal.
• It appears that the project is attempting to build without a building envelope on one lot and have the
building on another lot encroach on easement outside of the building envelope. As such, easements
where the building encroach need to be vacated. Notate the portion of easements to be vacated on the
utility plan (and if by separate document or by plat.) Notate with boundary ties the existing and
proposed building envelope delineations.
• Modify the General Notes as shown on the redlines.
I do not need a formal blueline rcaubmittal for another round of review. However, I need the necessary
offsite and onsite easement dedication(s)/vacation(s) along with a copy of the latest plan set before
acceptance of mylars for signature routing.
Date: November 3, 2000 Signature i �,----
PLEASE SEND COPIES OF MAI1"KLD RECISIONS
❑ Plat 0 Site 0 Utility ❑ Land ,:,ipe 0 Drainage Report 0 NO COMMENTS -SUBMIT MYLARS
REVISION
COMMENT SHEET
DATE: July 3, 2000 DEPT: ENGINEERING
PROJECT: #13-82CI Oakridge Block One PUD, Second
Filing, Lots 2 & 3 — Preliminary/Final — (LDGS)
PLANNER: Steve Olt
ENGINEER: Tim Blandford
All comments must be received by: July 26, 2000
❑ No Problems
* Problems or Concerns (see below or attached)
Comments:
• Please modify the General Notes. Refer to the attached sheets.
• Letters of intent for the offsite easements will need to be provided prior to the hearing. Formal
documents need to be recorded prior to final compliance.
• A pedestrian connection should be made where shown on the utility plans.
• THE ENGINEERING DEPARTMENT IS REQUESTING THAT YOU REPLAT THIS
PROPERTY DUE TO THE NUMBER OF PARTIAL EASEMENT VACATIONS AND
DEDICATIONS. This would be a lot easier, less time consuming and "cleaner" rather than
vacating/dedicating by separate document.
• Please add the length of the water service coming off of Wheaton Drive.
• Please note on the utility plans that the Engineering Inspector will make the final determination
on the location of the saw -cut lines and limits of patching in accordance with the "Street Repair
and Reconstruction Standards and Guidelines" manual.
Date: July 25, 2000 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS
2 Plat 2 Site 0 Utility 2 Landscape 0 Drainage Report ❑ NO COMMENTS -SUBMIT
PROJECT
(Noff"66201 COMMENT SHEET
City of Fort Collins
Current Plannine
DATE: January 18, 2000 TO: Engineering Pavement
PROJECT: #13-82CG Oakridge Block 1 PUD, 2nd Filing,
Lots 2 & 3, — Final (LDGS)
All comments must be received by Steve Olt no later than the staff
review meeting:
February 16, 2000
Note- Please identify your redlines for future reference
i
C
Signature
CIIECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plot site Drainage Report Other__ 66a
Utility __Redline Utility Landscape c,ry t>ort cottins
o
PROJECT
COMMENT SHEET
City of FDA Callins
Current Planning
DATE: January 18, 2000 TO: Street Oversizing
PROJECT: #13-82CG Oakridge Block 1 PUD, 2nd Filing,
Lots 2 & 3, —Final (LDGS)
All comments must be received by Steve Olt no later than the staff
review meeting:
February 16, 2000
Note- Please identify your redlines for future reference
C
Signalture
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape CitvofFort Cottim
PROJECT
COMMENT SHEET
Citv of Fort Collins
DATE: January 18, 2000
DEPT: ENGINEERING
PROJECT: #13-82CG Oakridge Block 1 PUD, 2nd Filing,
Lots 2 & 3, - Final (LDGS)
PLANNER: Steve Olt
ENGINEER: Tim Blandford
All comments must be received by: February 16, 2000
❑ No Problems
R1 Problems or Concerns (see below or attached)
Comments:
• If the proposed retaining wall is over 3' in height, it will need to be engineered. Please submit a copy
of the calculations for my records.
• Please include detail #D-20 in the utility plans.
• You will need to apply for an excavation permit for the street cuts.
• Please show the existing/proposed spot elevations at the driveway on Oakridge Drive.
• Please lighten all existing features (c&g, utilities, etc.) and darken the proposed construction.
• Please show all existing and proposed easements.
• Please label and dimension the ROW lines along Oakridge Drive and Wheaton Drive.
• Talk with the Streets Department, Syl Mireles, about traffic control during the street work.
Other Notes:
• Please complete the development agreement information sheet and return it to this office.
• A DCP will be required for this project. Enclosed with these comments is the DCP application.
Please complete and return to the Engineering Department.
Date: February 16, 2000 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS J -
14 Plat 0 Site 10 Utility 10 Landscape 0 Drainage Report 0 NO COMMENTS -SUBMIT MYLARS