HomeMy WebLinkAboutOAK RIDGE BUSINESS PARK SEPTEMBER 2000 - Filed CS-COMMENT SHEETS - 2005-04-29PROJECT
COMMENT SHEET
Citv of Fort Collins
Current Planning
DATE: July 23, 2000 DEPT: ENGINEERING
PROJECT: #13-82CL Oakridge Business Park ODP
PLANNER: Steve Olt
ENGINEER: Marc Virata
All comments must be received by: August 1, 2000
❑ No Problems
0 Problems or Concems (see below or attached)
Comments:
• The street connection through Parcel B might be better served still moved further east. Sight distance
easements may be required with the current proposed street connection placement.
• Additional comments will be made when each parcel is under its respective review.
Date: June 1, 2000 Signature: —
PLEASE SEND COPIES OF MARKED REVISIONS
0 Plat 0 Site ❑ Utility 0 Landscape 0 Drainage Report 0 NO COMMENTS -SUBMIT MYLARS
REVISION
COMMENT SHEET
DATE: July 23, 2000 TO: Engineering
PROJECT: #13-82CL Oakridge Business Park ODP
Type II (LUC)
All comments must be received by Steve Olt in Current Planning
no later than the staff review meeting:
Wednesday, August 2, 2000
❑ No Comment
❑ Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE**
Date:
THIS IS AN OVERALL DEVELOPMENT PLAN ONLY FOR�/
THE OAKRIDGE BUSINESS PARK. THERE ARE NO SITE l7
SPECIFIC PLANS BEING REVIEWED WITH THIS ODP.
Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat site _ Drainage Report _ Other
Utility _ Redline Utility _ Landscape
DATE: April 28, 2000 TO: Engineering
PROJECT: #13-82CL Oakridge Business Park, 33rd Filing —
ODP — Type II (LUC)
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, May 24, 2000
Note- Please identify your redlines for future reference
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report _ Other
Utility Redline Utility Landscape
6aPROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: April 28, 2000 DEPT: ENGINEERING
PROJECT: #13-82CL Oakridge Business Park ODP
PLANNER: Steve Olt
ENGINEER: Marc Virata
All comments must be received by: May 24, 2000
❑ No Problems
Rl Problems or Concerns (see below or attached)
Comments:
Please note the site ODP regarding these comments.
• As part of 3.6.3(D;, additional connectivity is required through parcels B & C as well as potentially
parcel A.
• The connection being shown through parcel B is not at an ideal location due to sight distance
restrictions and would be better served moving east to line up with a connection through to parcel C.
• Parcel C should also provide connectivity from McMurray to Wheaton.
• Isn't Parcel F currently under review and therefore would have to be excluded from this ODP?
• Additional comments will be made when each parcel is under their respective review.
Date: June 1, 2000 Signature:
PLEASE SEND COPIES OF MARKED REVISION
❑ Plat ❑ Site ❑ Utility 0 Landscape 11 Drainage Rep rt 11 NO COMMENTS -SUBMIT MYLARS