Loading...
HomeMy WebLinkAboutOAK RIDGE BUSINESS PARK SEPTEMBER 2000 - Filed CS-COMMENT SHEETS - 2005-04-29PROJECT COMMENT SHEET Citv of Fort Collins Current Planning DATE: July 23, 2000 DEPT: ENGINEERING PROJECT: #13-82CL Oakridge Business Park ODP PLANNER: Steve Olt ENGINEER: Marc Virata All comments must be received by: August 1, 2000 ❑ No Problems 0 Problems or Concems (see below or attached) Comments: • The street connection through Parcel B might be better served still moved further east. Sight distance easements may be required with the current proposed street connection placement. • Additional comments will be made when each parcel is under its respective review. Date: June 1, 2000 Signature: — PLEASE SEND COPIES OF MARKED REVISIONS 0 Plat 0 Site ❑ Utility 0 Landscape 0 Drainage Report 0 NO COMMENTS -SUBMIT MYLARS REVISION COMMENT SHEET DATE: July 23, 2000 TO: Engineering PROJECT: #13-82CL Oakridge Business Park ODP Type II (LUC) All comments must be received by Steve Olt in Current Planning no later than the staff review meeting: Wednesday, August 2, 2000 ❑ No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** Date: THIS IS AN OVERALL DEVELOPMENT PLAN ONLY FOR�/ THE OAKRIDGE BUSINESS PARK. THERE ARE NO SITE l7 SPECIFIC PLANS BEING REVIEWED WITH THIS ODP. Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat site _ Drainage Report _ Other Utility _ Redline Utility _ Landscape DATE: April 28, 2000 TO: Engineering PROJECT: #13-82CL Oakridge Business Park, 33rd Filing — ODP — Type II (LUC) All comments must be received by Steve Olt no later than the staff review meeting: Wednesday, May 24, 2000 Note- Please identify your redlines for future reference Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _ Other Utility Redline Utility Landscape 6aPROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: April 28, 2000 DEPT: ENGINEERING PROJECT: #13-82CL Oakridge Business Park ODP PLANNER: Steve Olt ENGINEER: Marc Virata All comments must be received by: May 24, 2000 ❑ No Problems Rl Problems or Concerns (see below or attached) Comments: Please note the site ODP regarding these comments. • As part of 3.6.3(D;, additional connectivity is required through parcels B & C as well as potentially parcel A. • The connection being shown through parcel B is not at an ideal location due to sight distance restrictions and would be better served moving east to line up with a connection through to parcel C. • Parcel C should also provide connectivity from McMurray to Wheaton. • Isn't Parcel F currently under review and therefore would have to be excluded from this ODP? • Additional comments will be made when each parcel is under their respective review. Date: June 1, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISION ❑ Plat ❑ Site ❑ Utility 0 Landscape 11 Drainage Rep rt 11 NO COMMENTS -SUBMIT MYLARS