Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK TENTH LOT 2 - Filed CS-COMMENT SHEETS - 2005-04-29/,'t �'**%\ PROJECT 10699'" COMMENT SHEET City of Fort Collins Current PlanninE DATE: January 18, 2000 TO: Engineering PROJECT: #13-82CH Oakridge Business Park, 101h Filing, Lot 2 — Final (LDGS) All comments must be received by Troy Jones no later than the staff review meeting: February 16, 2000 Note- Please identify your redlines for future reference 5 4:�/ 4_&V5 Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other Utility _Redline Utility _Landscape City of Fort Collins PROJECT i E�T T SHEET ..� COMM City of Fort Collins Current Planning DATE: January 18, 2000 TO: Engineering Pavement PROJECT: #13-82CH Oakridge Business Park, loth Filing, Lot 2 — Final (LDGS) All comments must be received by Troy Jones no later than the staff review meeting: February 16, 2000 Note- Please identify your redlines for future reference Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape citvofForCo Kam PROJECT �.�. COMM-ENT SHEET City of Fort Collins Current Planning DATE: January 18, 2000 TO: Street Oversizing PROJECT: #13-82CH Oakridge Business Park, loth Filing, Lot 2 — Final (LDGS) All comments must be received by Troy Jones no later than the staff review meeting: February 16, 2000 Note- Please identify your redlines for future reference "lb M Ix z Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS=t _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 6tyofFort PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: January 18, 2000 DEPT: ENGINEERING PROJECT: #13-82CH Oakridge Business Park, loth Filing PLANNER: Troy Jones ENGINEER: Marc Virata All comments must be received by: February 16, 2000 ❑ No Problems 0 Problems or Concerns (see below or attached) Comments: • The right-of-way shown on Oakridge Drive is less than our current City Street Standards. Because of the existing improvements along Oakridge Drive and the unlikelihood of increasing the street width, additional right-of-way dedication is not required. This decision should not be viewed as precedent setting for other developments, as each site is individually evaluated, often with situations unique in nature. • A street cut permit will be required for the street work shown along Wheaton Drive. Patchwork should be done so as to ensure that the end of the patch is not within the vehicle travel. • An offsite easement needs to be acquired for the sidewalk and handicap ramp construction shown connecting to the driveway out to Oakridge Drive. The easement must be provided prior to a hearing for this project. • Does the sidewalk heading south to the driveway intersecting Wheaton Drive have to end abruptly? Can the sidewalk connect to the sidewalk along Wheaton Drive or can an access ramp down to the parking lot be provided? Date: February 23, 2000 Signature: PLEASE SEND COPIES OF MARKED REVISIONS- ❑ Plat 0 Site 2 Utility 2 Landscape 0 Drainage Report 11 NO COMMENTS -SUBMIT MYLARS