HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK THIRTEENTH - Filed GC-GENERAL CORRESPONDENCE - 2005-04-29Develor !nt Services
Engineering Department
City of Fort Collins
November 29, 1990
Mr. Stan Everitt
Everitt Companies
3000 South College Avenue
Fort Collins, Colorado 80525
Re: oakridge Business Park - 13th Filing
Dear Mr. Everitt:
This letter is to inform you that the utilities to include sanitary sewer,
water and water services, new concrete curb, gutter and sidewalk, asphalt
concrete patches and storm drainage improvements have been inspected and
initially accepted by the City of Fort Collins with the following
exceptions:
• storm drainage certification
• out of plumk> stop box on water service to Building C
• approximately 6 feet of broken curb, gutter and sidewalk on Lemay Avenue
Please be informed that these improvements are subject to the normal
contractor's warranty period and this letter of acceptance does not relieve
the developer or the contractors, lot owners, or their contractors, of
their responsibility for the repair of any damage which may occur as a
result of the building construction.
Sincerely,
Tom Chapel
Engineering Construction Inspector
cc: Drahota Construction
28L North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605
Developrr. .t Services
( nL;ineerin- Department
nor:
=a 'g.�;r wnrvn�„ea..rna�au
August 10, 1990
Drahota Construction
1708 E. Lincoln Avenue
Fort Collins, Colorado 80524
Re: Oakridge - 13th Filing
Dear Mr.Drahota:
This letter is to inform you that the utilities to include sanitary sewer and
water only, have been inspected and initially accepted by the City of Fort
Collins pending the normal contractor's warranty period.
Please be informed that this letter of acceptance does not relieve the developer
or the contractors, lot owners, or their contractors, of their responsibility
for the repair of any damage which may occur as a result of the building
construction.
Sincerely,
Lance Newlin
Engineering Construction Inspector