Loading...
HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK THIRTEENTH - Filed GC-GENERAL CORRESPONDENCE - 2005-04-29Develor !nt Services Engineering Department City of Fort Collins November 29, 1990 Mr. Stan Everitt Everitt Companies 3000 South College Avenue Fort Collins, Colorado 80525 Re: oakridge Business Park - 13th Filing Dear Mr. Everitt: This letter is to inform you that the utilities to include sanitary sewer, water and water services, new concrete curb, gutter and sidewalk, asphalt concrete patches and storm drainage improvements have been inspected and initially accepted by the City of Fort Collins with the following exceptions: • storm drainage certification • out of plumk> stop box on water service to Building C • approximately 6 feet of broken curb, gutter and sidewalk on Lemay Avenue Please be informed that these improvements are subject to the normal contractor's warranty period and this letter of acceptance does not relieve the developer or the contractors, lot owners, or their contractors, of their responsibility for the repair of any damage which may occur as a result of the building construction. Sincerely, Tom Chapel Engineering Construction Inspector cc: Drahota Construction 28L North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6605 Developrr. .t Services ( nL;ineerin- Department nor: =a 'g.�;r wnrvn�„ea..rna�au August 10, 1990 Drahota Construction 1708 E. Lincoln Avenue Fort Collins, Colorado 80524 Re: Oakridge - 13th Filing Dear Mr.Drahota: This letter is to inform you that the utilities to include sanitary sewer and water only, have been inspected and initially accepted by the City of Fort Collins pending the normal contractor's warranty period. Please be informed that this letter of acceptance does not relieve the developer or the contractors, lot owners, or their contractors, of their responsibility for the repair of any damage which may occur as a result of the building construction. Sincerely, Lance Newlin Engineering Construction Inspector