HomeMy WebLinkAboutNATURAL RESOURCES RESEARCH CENTER BUILDING B - Filed CS-COMMENT SHEETS - 2005-04-28REVISION
COMMENT SHEET
DATE: February 21, 2001 TO: Engineering
PROJECT: #53-85AV NRRC — BUILDING B — SITE PLAN
ADVISORY REVIEW - TYPE 11 - (LUC)
All comments must be received by Ted Shepard in Current
Planning no later than the staff review meeting:
March 14, 2001
No Comment
❑ Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
r-R eeLe,� 1� n*
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Dat'6a1 SitcAte
__ Drainage Report Signahif&
_ Utility RcdGne Utility Landscape
REVISION
COMMENT SHEET
DATE: February 21, 2001 TO: Technical Svs
PROJECT: #53-85AV NRRC — BUILDING B — SITE PLAN
ADVISORY REVIEW - TYPE I I - (LUC) S
17-
All comments must be received by Ted Shepard in Current
Planning no later than the staff review meeting:
March 14, 2001
❑ No Comment N V2c BDG$_
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
i. t-L&AG 0Cos16s- 3r2
:2-• Would 6c 1�iGe
4 h q v,V_ Q P 10L -.
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Dat2lat site _ Drainage Repod SignatuMber
WilyRcdfine Utility Landscape WMIM
City of Fort Collins
/Arm
..A
City of Foil Collins
Current Planning
PROJECT
COMMENT SHEET
DATE: January 22, 2001 TO: Engineering Pavement
PROJECT: #53-85AV NRRC @ C.A.T. BUILDING B - SITE PLAN
ADVISORY REVIEW — TYPE II
All comments inust be received by Ted Shepard in Current Planning no
later than the staff review meeting:
The two -week routing
period is per the IGA
February 7, 2001 with C5U.
Note- Please identify your redlines for future reference
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report Other____
Utility Redhne Utility Landscape city of ForL coufns