Loading...
HomeMy WebLinkAboutNATURAL RESOURCES RESEARCH CENTER BUILDING B - Filed CS-COMMENT SHEETS - 2005-04-28REVISION COMMENT SHEET DATE: February 21, 2001 TO: Engineering PROJECT: #53-85AV NRRC — BUILDING B — SITE PLAN ADVISORY REVIEW - TYPE 11 - (LUC) All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: March 14, 2001 No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** r-R eeLe,� 1� n* CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Dat'6a1 SitcAte __ Drainage Report Signahif& _ Utility RcdGne Utility Landscape REVISION COMMENT SHEET DATE: February 21, 2001 TO: Technical Svs PROJECT: #53-85AV NRRC — BUILDING B — SITE PLAN ADVISORY REVIEW - TYPE I I - (LUC) S 17- All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: March 14, 2001 ❑ No Comment N V2c BDG$_ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** i. t-L&AG 0Cos16s- 3r2 :2-• Would 6c 1�iGe 4 h q v,V_ Q P 10L -. CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Dat2lat site _ Drainage Repod SignatuMber WilyRcdfine Utility Landscape WMIM City of Fort Collins /Arm ..A City of Foil Collins Current Planning PROJECT COMMENT SHEET DATE: January 22, 2001 TO: Engineering Pavement PROJECT: #53-85AV NRRC @ C.A.T. BUILDING B - SITE PLAN ADVISORY REVIEW — TYPE II All comments inust be received by Ted Shepard in Current Planning no later than the staff review meeting: The two -week routing period is per the IGA February 7, 2001 with C5U. Note- Please identify your redlines for future reference Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _Drainage Report Other____ Utility Redhne Utility Landscape city of ForL coufns