HomeMy WebLinkAboutNEW BELGIUM BREWERY - Filed CS-COMMENT SHEETS - 2005-04-28REVISION
COMMENT SHEET
DATE: June 25, 1997 DEPT: Engineering
PROJECT: #1-95A New Belgium Brewery - Type I (LUC)
Major Amendment
PLANNER: Ted Shepard
All comments must be recieved no later than the staff review meeting:
Wednesday, July 16, 1997
Date:
Signature:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site _ Dronage Report
V Utility _ Redline Utility _ Landscape
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 30, 1997 DEPT: Engineering
PROJECT: #1-95A New Belgium Brewery
Type I Major Amendment (LUC)
PLANNER: Ted Shepard
All comments must be received no later than:
Monday, June 16, 1997
New Belgium Brewery - Type I major amendment
June 16, 1997
The utility plans need to be modified to reflect the addition of the tanks and any change in grading
that is required.
The future building is being shown extending onto unplatted lots. The unplatted area would need
to be platted before a building can be expanded onto that area. Any development on these lots
will require improvements along the frontage of said lots. Requiring full utility plans submitted in
accordance with our standards and review process.
Date:
CECK HERE 7 YOU WISH TO RECEIVE COPIES OF REVISIONS
l Plat z Sife _ Doge Report _Oar
LIWIy — Redline Utility _landscape