PROJECT
i•••� COMMENT SHEET
City of Fort Collins
Current Planning
DATE: July 30, 2001 TO: Technical Services
PROJECT: #1-95E New Belgium Brewery - Final Compliance
All comments must be received by Ted Shepard in Current Planning no
later than the staff review meeting:
August 22, 2001
Note- Please identify your redlines for future reference
Nan:e (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat site _ Drainage Report _Other
Utility Redline Utility Landscape
6a
City of Fort Collins
REVISION
COMMENT SHEET
DATE: July 12001 TO: Technical Services
PROJECT: #1-95D New Belgium Brewery - Process Water
Facility - PDP - Type I (LUC)
All comments must be received by Ted Shepard in Current
Planning, no later than the staff review meeting:
July 18, 2001
No Coanment a1 a�eE� 3, inn
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
�: No��eAs7 Coen�e �� s_<e7ia� �2 1snle7- Z'ESG21c� PzaPC���,
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Dauat Site _ Dmu'age Rgmrt Sianatu{c?cr
__ U lily Kai nc UUGIT Pc
Project Comments Sheet
Selected Departments
City of Fort Collins
Current Planning
DATE: July 24, 2001
PROJECT: NEW BELGIUM BREWERY -PROCESS WATER FACILITY, PDP,
#1-95D
All comments must be received by TED SHEPARD in Current Planning no later than the
staff review meeting:
July 18, 2001
Note - Please identify your redlines for future reference
Dept: Engineering
32 Issue Contact: Sheri Wamhoff
Need to dedicate row for Buckingham with this plat. Needs to be adequate row
to accommodate a 58-foot flowline to flowline section. This will provide for a
parking lane on the south side of the street and for the center turn lane that is
needed as per the traffic study. The additional row needed for the for the left
turn lane will need to come from this property, since it is this property that is
requiring the left turn lane.
33 Issue Contact: Sheri Wamhoff
The row needed for the Lemay frontage will be looked at at the time that that
portion of land is developed. Hopefully at that time we will have a better idea of
what Lemay will look like adjacent to this property.
37 Issue Contact: Sheri Wamhoff
Add notice to the plat regarding maintenance of private drives. (See attached
for copy)
The notice on the plat regarding maintenance of private drives needs to be boxed out and made
prominent.
1 of 3
59
.E
61
62
63
OF
65
71
Issue Contact: Sheri Wamhoff
You are showing a future pan on the utility plans, This is not shown on the site
plan, no easement is shown for this. Need to indicate phasing if this is not to
be done now. When is it to be done - or take it off of this plan. Is the pipe that
this swale ties into existing or new? It is not labeled. If it is new and goes
across the ditch the ditch cc needs to sign the plans showing their approval of
the crossing.
Issue Contact: Sheri Wamhoff
Need to show the new row line on the site and landscape plans
Issue Contact. Sheri Wamhoff
Make sure that the rail spur is label potential future or clearly indicated that it is
not being approved by these plans.
Issue Contact: Sheri Wamhoff
Do not provide a jog in the row or the easement lines. They should run parallel
to the flowline.
Issue Contact Sheri Wamhoff
When the parking lane is removed the bike lane needs to be 8 feet in width
where adjacent to the curb.
Issue Contact. Sheri Wamhoff
Is the south side of the road a curb or is it just a pavement edge. If it is a curb
the 50-ft flowline to flowline section needs to be measure from the face of the
curb and the row adjusted appropriately.
Issue Contact: Sheri Wamhoff
Lemay Ave is shown as Vine Drive on a few sheets.
Issue Contact: Sheri Wamhoff
The ditch easement on the plat is this part of the easement that was dedicated
at reception # 9502257? Is this new? If it is new the ditch cc will need to sign
the plat accepting the easement.
Issue Contact: Sheri Wamhoff
Use a 15:1 transition on Buckingham for the transition to a left turn lane. (180 ft)
2 of
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
3 of
PROJECT
(iwr. COMMENT SHEET
City of Fort Collin:>
Current Planning
DATE: May 16, 2001 TO: Technical Services
PROJECT: #1-95D NEW BELGIum BREWARY EXPANSION - PDP —
TYPE I (LUC)
All comments must be received by Ted Shepard in Current Planning no
later than the staff review meeting:
June 13, 2001
Note- Please identify your redlines for future reference
�. /hONi/Ll 7-k/5- F1Eez> /S ti�T Fy 7Ebe�ide D o 711-I6
JO Lt� �c�fl�J 14O'DiT1u, L� �Uc G� I�✓�kln6l7�rn
i r^ 1
-7 D,m cN��u�g rn i 7 a� rk
l� R f-1 l'j
Name (please print)
CHECK HERE IF YOU wjsEf ,rO RECEIVE COPIES OF REVISIONS
-,Plat Site DrainageRenorl Other
_Utility Rcdline Utility _Landscape
PROJECT
i.." COMMENT SHEET
City of FoA Collins
Current Plannini
DATE: May 16, 2001 TO: Engineering Pavement
PROJECT: #1-95D NEW BELGIUM BREWARY EXPANSION - PDP —
TYPE I (LUC)
All comments must be received by Ted Shepard in Current Planning no
later than the staff review meeting:
June 13, 2001
Note- Please identify your redlines for future reference
Name (please print)
CHECK HERE IT YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report Other
Utility _Redline Utility Landscape
t Am
Mema
City of Fort Collins
REVISION
COMMENT SHEET
DATE: February 21, 2001 TO: Engineering
PROJECT: #1-95C NEW BELGIUM BREWERY— OVERALL
DEVELOPMENT PLAN - TYPE 11 - (LUC)
All comments must be received by Ted Shepard in Current
Planning no later than the staff review meeting:
March 14, 2001
ElNo Comment
�roblerns or Concerns (see below or attached)
"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
New Belgium Brewery ODP March 19„ 2001
1. The community center and a pre-treatment wastewater facility are not addressed in the traffic study. The ODP
indicates that the site is to have industrial zoning and does not list any specific uses for the site but the traffic study
indicates that the site will develop with the following: 300,000 sq. ft of manufacturing and 365,000 sq. feet of
warehouse. If uses other than the manufacturing and warehouse as indicated in the traffic study are submitted a
comprehensive update or new traffic study will need to be submitted at that time.
2. The ODP shows the access point NOT aligned with 2nd Street. The TIS states that the access point WILL BE aligned
With 2id Street. As in your response letter offsetting the access point was discussed with traffic and the traffic study
was to discuss the turning movements for 2"d and 3"' Streets to see what conflicts there would be. Traffic study
provided no discussion of this.
3. Don't know what Figure 1 `Buckingham Street Access Layout' is for. Doesn't match anything proposed — and doesn't
look like anything the City would support.
4. See Transportation Planning comment sheet for additional comments.
J
�� /P�
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
DatElat _ Site _ Dranage Report Signatufhber
Ut Gty Redl ne Utiliity Landscape 0ML0 -
00
/Ar9M PROJECT
Im"I COMMENT SHEET
City of Fort Collins
Current Planning
DATE: October 5, 2000 TO: Engineering Pavement
PROJECT: #1-95C New Belgium Brewery ODP — Type II
(LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
November 1, 2000
Note- Please identify your redlines for fitture reference
Signature
('BECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Draina,c Report Othcr
Utility Redline Utility Landscape c�vof Focr couins