DATE: October 8, 1998
PROJECT: NRRC @ C.A.T.
DEPT: ENGINEERING
PLANNER: Ted Shepard, Wednesday October 14, 1998
ENGINEER: Dave Stringer
Intergovernmental Agreement Advisory Review
1. Would be helpful to City if this property was platted.
2. Driveway access points are part of Centre Ave. design coordinate design, and show detail
with this plan also.
3. Show on this plan the sidewalk connection from parking lot to Centre Ave. as shown on site
plan. Coordinate these plans
4. Show temporary access roadway and construction staging areas.
5. Show dimensions of parking lot layout, drive isles, parking spaces etc.
7. Need to dedicate parking lot as access, utility and drainage easement.
8. Cross sections of swales would be helpful
9. See other comments on red lined plans
Date:: Signature -
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
�} -SITE
UUTILITY
O--LANDSCAPE
DATE: November 9, 1998 TO: Engineering
PROJECT: #53-85AU NRRC @ C.A.T. - Site Plan
Advisory Review
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, November 18,1998
❑ No Comment
ffProblems or Concerns (see below or attached)
GENERAL COMMENTS:
s; Make sure that all necessary easements are dedicated and recorded, i.e. offsite grading,
offsite construction, etc.
Please show the limits of construction along Centre Avenue.
r Please provide a cross section of where the temporary access road crosses the swale/ditch.
Provide dimensions, slopes, elevations, etc.
You will have to provide Type III Barricades at the access points off of Centre Avenue until
Centre Avenue is constructed. Include a detail of the barricades and label on the plans.
J, You will need to provide a 15 foot utility easement along the frontage of the property. The
utility easement is located at the back of the walk.
Date: 11
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _✓Site Drainage Repod _ Otk
✓ Utility ✓Redline Utility ✓undscape
REVISION
COMMENT SHEET
DATE: January 12, 1999
DEPT: Engineering
PROJECT: 453-85AU NRRC @ C.A.T. - Advisory Review
All comments must be received by Tim Blandford no later than the staff
review meeting: Wednesday, January 27, 1999
GENERAL COMMENTS:
Please note that the driveway entrances need to be constructed with concrete to the property
line per City standards.
Date: 1 /2e /99
Please send copies of marked revision
Signature:
s _Plat _ Site
_Utility _Landscape
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 10, 1999 DEPT: ENGINEERING
PROJECT: #53-85 AU NRRC @ C.A.T. — Site Plan
Advisory Review
PLANNER: Ted Shepard
ENGINEER: Tim Blandford
All comments must be received by. 3.10.99
MAJOR COMMENTS
If any rip rap is being used for bank stabilization, it will need to be buried
and the area re -seeded. u -
Please provide the City with a boundary survey, since this project is not
being platted.
Date: g•b-99 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT
❑ SITE
❑ UTILITY
❑ LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: September 28, 1998 TO: bi3- ?Vm+. - Rick 9.
PROJECT: #52-98 NRRC @ C.A.T. Site Plan
Administrative Advisory Review as per
Intergovernmental Agreement Between City &
C.S.U.
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, October 14,1998
0(c
RUc-
PROJECT ='
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: September 28, 1998 TO: MA4 &Pf, �S
PROJECT: #52-98 NRRC @ C.A.T. Site Plan
Administrative Advisory Review as per
Intergovernmental Agreement Between City &
C.S.U.
All comments must be received by Ted Shepard no later than the staff
review meeting:
/Wednesday, October 14, 1998 J / J
/
«/« l�k� / ri 7, 707. 0v
6,4-w- /�}r.er�cu �.�vs¢ �e /cous@�� D @o// ,�freR��� 8/✓a
GL
cue
` //� `/l � COh 57�UC�vti �dS
cut' 1/5 `� /�!i' ( .{ T r G/ /,e / "�