COMMENT SHEET
DATE: August 15, 2000 TO: Technical Svs
PROJECT: #18-92E Mountain Ridge Farms PUD, 3rd Filing
Final (LDGS)
All comments must be received by Ted Shepard no later than the
staff review meeting:
Wednesday, September 6, 2000
ElNo Comment
Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE**
.--2-. S�Pee� VAgMPs
3, Lgb�e l rac,� I oh SAee� II
e.
h
dGVkM,5F al))LleS, e
p
// The �ewtP U�3� �7 ��r� �vql esti'�
Date: Signature:_
MTTYOU-W= RECEIVE COPIES OF REVMM
_ site _ Drainage Report _ Other
Utility _ Redline Utility _ Landscape
♦ The sidewalk adjacent to the city park must be at least 6 feet wide. After talking with Craig Foreman
in the Parks and Ree. Dept. he stated that he did agree with the removal of the existing sidewalk, but
not the installation of a new 4-Coot sidewalk.
♦ Please sec the Traffic Operations comment letter for Traffic Impact Study comments.
Utility Plan Comments
Overall Utility Plan; Sheet 2 of7
♦ Please show the bicycle / pedestrian paths, bridge structures, enhanced cross walks and 7-foot
sidewalk along Troutman Parkway on the utility plans.
Seneca Street Plan & Profile; Sheets 5 & 6 of 27
♦ It has been brought to my attention that the Seneca Street design for this project does not tie-in to
existing grades with the Seneca Street design for Westfield Park PUD.
Wabash Street Plan & Profile; Sheet 6 of 27.
♦ The design for Wabash Street does not tie-in to existing grades with the design for Mt. Ridge Farms,
I" filing.
Troutman Parkway; Sheets 9 & 10 of 27:
♦ (Please go to the comments made above for the design of Troutman Parkway. Below will be
comments specific to the design submitted with this round of review.)
♦ Please show the limits of construction in the plan & profile view. The approximate end of
construction on the profile will require that a temporary grading easement be dedicated to tie-in
proposed grades with existing conditions. In addition, where Troutman Parkway dead ends, the
developer shall provide written approval from the adjacent landowner to discharge storm drainage
Irom this development onto the adjacent land (Street Design Manual, Section 1.02.03.1 ?b).
♦ The minimum centerline radius for a collector street if 610 feet.
♦ Please provide a complete design for the bridge/ box culvert.
Detail Sheets: Sheet 14, 15 & 16 of 16:
♦ Please show the cross section of the 10-fool cross pan for the intersection detail.
♦ Please provide a bridge/ box culvert detail for Troutman Parkway ditch crossing.
♦ Please provide an enhanced crosswalk detail.
Plat Comments
♦ Please reference all of Mapping and Drafting comments.
♦ Is there a need to have a statement that vacates any pre-existing easements?
♦ Please make sure all tracts are labeled properly.
♦ Since the City Manager has to sign this plat, the repair and maintenance language should not
be included on the plat. This language will be in the development agreement.
Site and Landscape Plan
♦ Please make sure that the site and landscape plan are representative of the utility plan , and vice versa.
PROJECTS
COMMENT SHEET
City of Fort Collins
Current Plann:in2
DATE: August 15, 2000 DEPT: Engineering
PROJECT: #18-92E Mountain Ridge Farms PUD, 3rd Filing Final-
LDGS
PLANNER: Ted Shepard
ENGINEER: Mark McCallum
All comments must be received by: September 6, 2000
General Comments
♦ See redlined comments on all sheets of the utility, site, and landscape plans. More specific comments
will be mentioned below. If you have any questions please call me (Mark McCallum) at'_2I-6605.
♦ The sidewalk adjacent to Westfield Park must be at least 6 feet wide. The cross sections are showing
the proposed correction to the 6-foot standard, but the plan views do not show the correction.
♦ Please see the Traffic Operations comment letter for Traffic Impact Study comments.
♦ Where Troutman Parkway stubs to future development, the developer shall provide written approval
from the adjacent landowner to discharge storm drainage from this development onto the adjacent
land (Street Design Manual Section 1.02.03.17b). The dedication of offsite easement to contain or
convey storm would suffice, however, presently those flows have not been accounted for adequately
(per Storm Water (itility).
Utilitv Plan Comments
Overall Utility Plan; Sheet 2 of 27:
♦ Please show all utility phasing. In particular all utility stubs.
♦ The utility lines east of the project. in Troutman Parkway should be "faded".
Seneca Street Plan & Profile, Sheets 6 of 27.
Date: tl�� �r T- Signature:
PLEASE SEND COPIES !ILPLAT
OF MARKED REVISIONS:' -SITE
G-UTILITY NO COMMENTS — SUBMIT MYLARS
,,MY LANDSCAPE
♦ It is my understanding the Seneca Street tie-in to existing grades is being revised with Westfield Park
PUD (prior to completion of their 3" phase). The Engineering Dept. is agreeable to allow this project
to go to public hearing, but will not sign off on utility plans for MRF 3�d until the "tie -id'/ revisions
arc completed.
♦ Please show the design of the sidewalk on the west side of Seneca Street to Johnson Elementary
School entrance.
See redlines.
Wabash Street Plan & Profile; Sheet 6 of 27.
Troutman Parkway, Sheets 9 & 10 of27.
Please show the limits of construction in the profile view.
Please show all curb return elevations and stations.
♦ Please be clear about the phasing on this plan. In particular, where does the 12" water line end.
Troutman Parkway Culvert Design; Sheet D-1 of Dd:
♦ Please provide more information, as redlined.
Plat Comments
♦ Please reference all of Mapping and Drafting comments.
Site and Landscape Plan
♦ Please make sure that the site and landscape plan are representative of the utility plan , and vice versa.
♦ The sidewalk system on the west side of Seneca Street does not show the 6-foot sidewalk required
adjacent to Westfield Park. The sidewalk stub of the end of the southern cul-de-sac to Troutman
Parkwav should correspond with the utility plans or vice versa.
♦ It might be to your benefit if you phase the landscape plans.
COUNTY REFERRAL
ili■ COMMENT SHEET
City of Fort Collins
Current Planning
DATE: December 7, 1999 DEPT: Engineering
PROJECT: #18-92E Mountain Ridge Farms PUD, 3`d Filing Final-
LDGS
PLANNER: Ted Shepard
ENGINEER: Mark McCallum
All comments must be received by: January 5, 2000
General Comments
♦ See redlined comments on all sheets of the utility, site, and landscape plans. More specific comments
will be mentioned below. If you have any questions please call me (Mark McCallum) at 221-6605.
This project has certain obligations to the proposed bicycle/ pedestrian path and the associated bridge
structure. As the result of negotiations with Mountain Ridge Farms, 2°d filing, '/s of the bicycle/
pedestrian path (the other % will be paid for by the City's Parks and Rec. Dept.) and associated bridge
structure will be funded on a per lot basis for each lot approved on the Preliminary Mountain Ridge
Farms, PUD. (All lots within the first filing, which is already under construction, were included in
the over all fee.) The total fee for this subdivision is calculated as shown: 49 lots * $320/lot=
$15,680. Please contact me (Mark McCallum) if a further explanation is needed.
This project, as I am sure you are aware, is responsible to build Seneca Street to complete the
connection to the north & south. I just want to reiterate that Westfield Park PUD, currently is only in
construction phase I, which does not complete Seneca Street to the north boundary of this
development. In the event that this project desires to proceed prior to Westfield Park PUD 2"' Phase,
which will build Seneca Street to northern boundary of this development, this project will be
obligated to construct Seneca Street to the where Seneca Street ends at construction phase I of
Westfield Park PUD. (See Seneca Street comments below.)
In accordance with 24-95 in the Municipal Code, the Developer is responsible to design and construct
Trountjan Parkway adjacent to the development. The construction of-Troutman,Parkway shall
Date: IUE4a
PLEASE E D COPIES PLAT
OF MARKED REVISIONS: SITE
�. UTILITY
Signature:
❑ NO COMMENTS — SUBMIT MYLARS
I
PROJECT
Mw. COMMENT SHEET
City of Fort Collins
Current Planning
DATE: December 7, 1999 TO: Mapping/Drafting
PROJECT: # 18-92E Mountain Ridge Farms PUD, 3rd Filing
Final - (LDGS)
All comments :must be received by Ted Shepard no later than the staff
review meeting:
January 5, 2000
**Note- Please identify your redlines for future reference**
ltlel2� �2�� �tiC Ov � a1z 1�ouN����
-
I,cl�rNcss Cu2NL2J ore
N� C(T),TE n_ 15
Th+U M ,Tr �(a 4I uT T RAcr M
APPr_-AO-s 7D i'31 (�cr��c✓t� ao
i'la01
Try PL -1 r
SNu✓�a
1J0 2113E0,
I
Go/j FO3jNg1
W 4SA3, 4
ST,
13.E
F 1« I s a q-T-,
dc'E"li e-
cc -A l p 1,= y
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
Utility _Redline Utility _Landscape
City of Fort Collins
PROJECT
i l COMMENT SHEET
City of Fort Cc11ins
Current Planning
DATE: December 7, 1999 TO: Engineering Pavement
PROJECT: #18-92E Mountain Ridge Farms PUD, 3rd Filing
Final - (LDGS)
A11 comments must be received by Ted Shepard no later than the staff
review meeting:
January 5, 2000
**Note- Please identify your redlines for future reference**
n� (-ti!C, � APpo--J?
-<-00
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS t' .
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort COMBS
Current Plannine
DATE: December 7, 1999 TO: Street Oversizing
PROJECT: #18-92E Mountain Ridge Farms PUD, 3rd Filing
Final - (LDGS)
All comments must be received by Ted Shepard no later than the staff
review meeting;:
January 5, 2000
**Note- Please identify your redlines for future reference**
J/ L lGuJl "P
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site Drainage Report _Other
Utility _Redline Utility _Landscape
City of Fort Collins
REVISION
COMMENT SHEET
DATE: May 15, 2000 TO: Mapping
PROJECT: #18-92E Mountain Ridge Farms, 3rd Filing Final
PUD — Final (LDGS)
All comments must be received by Ted Shepard no later than the
staff review meeting:
Wednesday, June 7, 2000
No Comment
Problems or Concerns (see below or attached)
*"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE"
A, 7- � 61J �fi cc T-
T 5 o
SHc�ti cry/ %lTtJ {%,o<r Fii uD / irt,,—
Date: Signature:_
CHECK F0Eff-YOU'WISHT
'Plat site _ Drainage Report _ Other
— Utility _ Redline Utility _ Landscape
PROJECTS
ems■ COMMENT SHEET
City of Fort Collins
Current Planning
DATE: May 15, 2000 DEPT: Engineering
PROJECT: # 18-92E Mountain Ridge Farms PUD, 3rd Filing Final-
LDGS
PLANNER: 'Ted Shepard
ENGINEER: Mark McCallum
All comments must be received by: June 7, 2000
General Comments
♦ See redlined comments on all sheets of the utility, site, and landscape plans. More specific comments
will be mentioned below. If you have any questions please call me (Mark McCallum) at 221-6605.
♦ '['his project will need offsite construction grading easements for the construction of Troutman
Parkway and Seneca Street. The Stormwater Utility has stated that offsite construction/ grading
easements are needed for the construction of the box culvert. In addition, this project will be required
to dedicate rights -of -way for the construction of Troutman Parkway.
♦ A signature block for the ditch company should be on all utility plans sheets that show the ditch.
♦ Troutman Parkway should be design as follows (specific comments for the design provided in this
submittal are below in the Utility Plan Comments):
I . This project has vesting to build streets to the city's old street standards; therefore the design
that is shown west of Wabash Street is sufficient. The applicant has even upgraded the width
of the sidewalk from Wabash Street to Seneca Street to a 7-foot attached sidewalk for the safe
route to school issue. However, the design of Troutman Parkway east of Wabash Street does
not have vesting to the old street standards and will have to be built to the new street
standards (Collector with Parking). Therefore, the city would like to have a meeting with the
applicant to discuss the possibility of designing Troutman Parkway from Shields Street to
Seneca Strcet to the new street standards.
2. Stormwater has stated that a preliminary basin design shall be provided for the Troutman
Parkway design. Please contact the Stormwater Utility to talk about the specifics.
3. Please fade out the design of Troutman Parkway that is not to be built with this project.
Date: < Signature: